This calculator applies the fee lines quoted on the Aurora permit pages: the city's own plan review, permit and surcharge figures, as published by the Aurora Building Division. Pick a project, change the inputs, and the breakdown shows each line and how it is computed. 4 of 10 project types have a computable formula on their page; the rest show the page's own figure.
- Aurora prices common small jobs (decks, reroofs, electrical service upgrades, HVAC replacements) on its 2026 flat-rate fee sheet: same project type, same permit fee, whatever the size or contract price.
- Jobs not on the flat sheet (sheds, pools, remodels) are priced by the city's valuation-based permit fee calculator; the pages quote its results for a few valuations but not its formula, so those projects show the page's examples only.
- The calculator labels plan review "if applicable", in the same amount as the permit fee. Our reading, as the pages put it, is that it is charged when the city requires plans; the handbook says most remodels can be permitted without plan submittal while the chart marks interior remodels as needing plans, so ask the Permit Center.
- Permits priced here add a use tax deposit of 3.75% of materials cost to the city, plus 0.25% for Arapahoe County open space where that applies; online credit card payments add a fee of at least 2.25% (the deck, roof, HVAC and pool pages say so).
- Aurora's permit-or-not rules on these pages come from its Do It Right home improvement handbook, dated March 2019; the fees come from the 2026 flat-rate sheet and the calculator. Confirm the handbook still applies at 303.739.7420.
Aurora shed permit fee
A shed over 120 sq ft of floor area needs a building permit; the page prices it with the city's valuation calculator, permit fee plus plan review ($332 at $3,000, $668 at $10,000), though the city's new-building table for utility buildings ($3.40 per sq ft, $2,000 minimum) may govern instead and the page does not say which, plus a use tax deposit on materials.
What the city page states: A $3,000 shed: permit fee $166 plus plan review $166 = $332, plus about $56.25 in estimated taxes.
Aurora fence permit fee
Aurora needs no permit for a new or replacement fence under six feet, so the city fee is $0; the height, location and setback standards still apply.
Aurora deck permit fee
A deck more than 30 inches above grade, or a lower deck attached to the house, pays the 2026 flat-rate fee of $402 whatever its size, plus a use tax deposit on materials.
| Line | How it is computed | Amount |
|---|---|---|
| Single family residential deck (flat rate) | flat | $402 |
Aurora pool permit fee
A pool 24 inches deep or more needs a building permit with plans, priced by the city's valuation calculator as permit fee plus plan review ($1,890 at $40,000, $2,811 at $75,000), plus a use tax deposit on materials.
What the city page states: A $40,000 in-ground pool: permit fee $945 plus plan review $945 = $1,890.
Aurora roof replacement permit fee
Every single family reroof pays the 2026 flat-rate fee of $350, or $424 when roof and siding are replaced together, whatever the roof size or contract price, plus a use tax deposit on materials.
| Line | How it is computed | Amount |
|---|---|---|
| Single family roof replacement | flat | $350 |
Aurora bathroom remodel permit fee
A bathroom remodel that is more than cosmetic is priced by the city's valuation calculator ($334 permit fee at $10,000, $694 at $25,000), with a plan review line of the same amount if the city charges it, plus a use tax deposit on materials.
What the city page states: $10,000 bathroom: permit fee $334; plan review, if charged, adds $334 ($668 in all).
Aurora kitchen remodel permit fee
A kitchen remodel that changes wiring, plumbing or walls is priced by the city's valuation calculator ($454 permit fee at $15,000 to $1,117.50 at $50,000), with a plan review line of the same amount if the city charges it, plus a use tax deposit on materials.
What the city page states: $15,000 kitchen: permit fee $454; plan review, if charged, adds $454 ($908 in all).
Aurora electrical panel permit fee
Every electrical service change needs a permit; a residential electrical service upgrade pays the 2026 flat-rate fee of $190 whatever the amperage or contract price, plus a use tax deposit on materials.
| Line | How it is computed | Amount |
|---|---|---|
| Residential electrical service upgrade (flat rate) | flat | $190 |
Aurora hvac permit fee
Furnace, air conditioner and evaporative cooler replacements always need a permit, priced on the 2026 flat-rate sheet by job type ($201 for one unit, $300 for furnace and AC together, $336 with a water heater), plus a use tax deposit on equipment and materials.
| Line | How it is computed | Amount |
|---|---|---|
| Furnace replacement | flat | $201 |
Aurora adu permit fee
ADUs are allowed today only as detached units in OA-R1, OA-R2 and OA-RMU with a conditional use permit; the city publishes no ADU fee, and if a detached unit is fee'd on the new-building table as R-3 the building fee starts at $2,000.
What the city page states: A 750 square foot unit works out to $975, so the $2,000 minimum applies.
What the estimate covers
City fees only, on the ordinary residential path each page prices: the building or trade permit plus the mandatory lines the city adds to it. It leaves out whatever the page says is separate (a designer's fee, a contractor's licence, a utility connection) and anything the page does not price. Fee schedules change on the city's budget cycle; the month each page was last verified is Nov 2026, and the verification method explains how changes are caught.
Frequently asked questions
Other city calculators
- Albuquerque, NM
- Austin, TX
- Baltimore, MD
- Boston, MA
- Charlotte, NC
- Chicago, IL
- Cincinnati, OH
- Colorado Springs, CO
- Corpus Christi, TX
- Dallas, TX
- Denver, CO
- El Paso, TX
- Fort Worth, TX
- Fresno, CA
- Honolulu, HI
- Houston, TX
- Indianapolis, IN
- Irvine, CA
- Jacksonville, FL
- Kansas City, MO
- Las Vegas, NV
- Long Beach, CA
- Los Angeles, CA
- Louisville, KY
- Miami, FL
- Milwaukee, WI
- Minneapolis, MN
- Nashville, TN
- New Orleans, LA
- New York City, NY
- Orlando, FL
- Philadelphia, PA
- Phoenix, AZ
- Pittsburgh, PA
- Portland, OR
- Raleigh, NC
- Riverside, CA
- Sacramento, CA
- San Antonio, TX
- San Diego, CA
- San Francisco, CA
- San Jose, CA
- Seattle, WA
- St. Louis, MO
- St. Paul, MN
- Stockton, CA
- Tampa, FL
- Tucson, AZ
- Tulsa, OK
- Virginia Beach, VA
- Washington, DC
- Wichita, KS
Related: All cities · Research: fees compared across 30 cities · Aurora permit guide