City fee lines from the Milwaukee permit pages, computed for your project. Sourced, verified Oct 2026.
Verified Oct 2026Calculator
This calculator applies the fee lines quoted on the Milwaukee permit pages: the city's own plan review, permit and surcharge figures, as published by the Department of Neighborhood Services. Pick a project, change the inputs, and the breakdown shows each line and how it is computed. 9 of 10 project types have a computable formula on their page; the rest show the page's own figure.
DNS fees come from MCO 200-33: alterations at 1.6% of construction cost ($150 minimum), flat or per-square-foot lines for sheds, fences and new construction, and itemized trade permits.
DNS adds a 1.6% training and technology surcharge to its permit and review fees, and each permit carries a processing fee ($20 building and plumbing, $25 electrical and HVAC, $35 fence).
Milwaukee shed permit fee
A shed of 150 sq ft or less at least 3 feet from every lot line needs no permit; a larger shed is treated like a garage at $0.45 per sq ft plus a $75 plan review, the 1.6% surcharge and $20 processing.
Exempt: No permit for a tool or storage shed of 150 sq ft or less that is at least 3 feet from every property line (MCO 200-24-1.5-c). Closer than 3 feet it needs a permit: $175 plus $50 review, the surcharge and $20 processing ($248.60).
$187.64estimated city fees at the inputs above
Line
How it is computed
Amount
Permit fee (garage line)
200 sq ft × $0.45
$90
Plan review
flat
$75
Training and technology surcharge (1.6%)
1.6% of $165
$2.64
Processing fee
flat
$20
The page's own example: “200 sq ft (10x20) shed: 200 x $0.45 = $90, plus $75 review = $165, plus $2.64 and $20 = $187.64.”
Not included: A shed of 150 sq ft or less closer than 3 feet to a lot line ($175 plus $50 review, $248.60 all in) is not modeled; wiring is a separate electrical permit ($100 minimum plus $25 processing).
Source: MCO 200-33 (DNS fee schedule). Read the Milwaukee shed permit page, which quotes the rule and records when it was last verified (Oct 2026).
Milwaukee fence permit fee
Every new or replacement fence at a one- or two-family home needs a permit: the $25 fence fee, a $0.40 surcharge and a $35 processing fee, $60.40 regardless of length or height.
$60.40estimated city fees at the inputs above
Line
How it is computed
Amount
Fence fee
flat
$25
Training and technology surcharge (1.6%)
1.6% of $25
$0.40
Processing fee
flat
$35
The page's own example: “A one- or two-family fence permit is $60.40 in total”
Not included: Fees may be quadrupled if the fence is built before the permit.
Source: MCO 200-33-14.5; DNS residential fence requirements sheet. Read the Milwaukee fence permit page, which quotes the rule and records when it was last verified (Oct 2026).
Milwaukee deck permit fee
Attached decks and freestanding decks over 2 feet need a permit at 1.6% of the job cost ($150 minimum) plus a $50 plan review, a 1.6% surcharge on both and $20 processing.
$223.20estimated city fees at the inputs above
Line
How it is computed
Amount
Building permit (1.6% of cost)
1.6% of $8,000 (minimum $150)
$150
Deck plan review
flat
$50
Training and technology surcharge (1.6%)
1.6% of $200
$3.20
Processing fee
flat
$20
The page's own example: “$150 + $50 = $200, plus $3.20 surcharge and $20 = $223.20.”
Not included: A possible $250 assessor service charge (the page says it is not spelled out for decks); electrical work for deck lighting.
Source: MCO 200-33 (DNS fee schedule); DNS deck handout. Read the Milwaukee deck permit page, which quotes the rule and records when it was last verified (Oct 2026).
Milwaukee pool permit fee
A pool at least 15 by 3 feet or 3,965 gallons needs an $86.20 private pool permit (surcharge included) from the DNS Environmental Section, after a licensed electrician pulls the electrical permit ($110 pool line plus 1.6% and $25 processing).
$222.96estimated city fees at the inputs above
Line
How it is computed
Amount
Private pool permit (new pool)
flat
$86.20
Electrical: swimming pool line
flat
$110
Electrical surcharge (1.6%)
1.6% of $110
$1.76
Electrical processing fee
flat
$25
The page's own example: “New above-ground pool with a pump circuit: $86.20 pool permit + $110 + $1.76 + $25 electrical = $222.96.”
Not included: Pools smaller than 15 by 3 feet need no permit; a pool deck is a separate deck permit.
Source: DNS Environmental Section pool packet; MCO 200-33-11. Read the Milwaukee pool permit page, which quotes the rule and records when it was last verified (Oct 2026).
Milwaukee roof replacement permit fee
Replacing roof covering or decking on a house or duplex needs no permit; structural roof work is an alteration at 1.6% of cost ($150 minimum) plus $0.25 per sq ft plan review ($125 minimum), the 1.6% surcharge and $20 processing.
$599.12estimated city fees at the inputs above
Line
How it is computed
Amount
Building permit (1.6% of cost)
1.6% of $20,000
$320
Plan review
1,000 sq ft × $0.25
$250
Training and technology surcharge (1.6%)
1.6% of $570
$9.12
Processing fee
flat
$20
The page's own example: “Re-framing 1,000 sq ft of roof for $20,000: $320 + $250 = $570, plus $9.12 and $20 = $599.12.”
Not included: The ordinary reroof (covering or decking only, structure unaffected) needs no permit; a possible $250 assessor service charge the page says to ask about.
Source: MCO 200-33 (DNS fee schedule), one- and two-family alterations. Read the Milwaukee roof replacement permit page, which quotes the rule and records when it was last verified (Oct 2026).
Milwaukee bathroom remodel permit fee
Same-spot fixture swaps and finishes need no permit; moved fixtures need a plumbing permit ($20 per fixture, $85 minimum), new wiring an electrical permit ($100 minimum), and wall changes a building permit at 1.6% of cost plus review and the $250 assessor charge.
$232.96estimated city fees at the inputs above
Line
How it is computed
Amount
Plumbing permit
3 fixtures × $20 (minimum $85)
$85
Plumbing surcharge (1.6%)
1.6% of $85
$1.36
Plumbing processing fee
flat
$20
Electrical permit (minimum)
flat
$100
Electrical surcharge (1.6%)
1.6% of $100
$1.60
Electrical processing fee
flat
$25
The page's own example: “electrical $100 + $1.60 + $25 = $126.60. Total $232.96.”
Not included: Electrical items above the $100 minimum (a whirlpool tub is $85 on its own line); the page's gut-remodel example with the building permit switched on totals $955.08.
Cabinets, counters and same-spot swaps need no permit; new wiring needs an itemized electrical permit, moved plumbing a plumbing permit ($20 per fixture, $85 minimum), and wall changes a building permit at 1.6% of cost plus review and the $250 assessor charge.
The page's own example: “plumbing hookups at the $85 minimum plus $1.36 and $20. Total $241.09.”
Not included: Electrical scope other than the page's same-layout example (items are $3 per receptacle, $10 per light, $25 per appliance, $100 minimum); gas piping permits.
A panel replacement or service upgrade up to 400 A is the $130 service line, and a subpanel the $55 feeder line under the $100 one- and two-family minimum, on an electrical permit pulled by a licensed contractor, plus the 1.6% surcharge and $25 processing.
$157.08estimated city fees at the inputs above
Line
How it is computed
Amount
Service with one service switch (up to 400 A)
flat
$130
Training and technology surcharge (1.6%)
1.6% of $130
$2.08
Processing fee
flat
$25
The page's own example: “Upgrading a house from 100 A to 200 A service with a new main panel: $130 + $2.08 + $25 = $157.08.”
Not included: Added circuits ($3 per outlet, $10 per light fixture); reinspection fees.
Gas or oil furnaces and boilers need a permit even in kind: $55 per heating unit up to 150,000 BTU, $60 per AC unit up to 3 tons plus $10 per extra ton, ductwork $2 per 100 sq ft ($50 minimum), plus the 1.6% surcharge and $25 processing.
$80.88estimated city fees at the inputs above
Line
How it is computed
Amount
Heating unit (up to 150,000 BTU) optional
flat
$55
Training and technology surcharge (1.6%)
1.6% of $55
$0.88
Processing fee
flat
$25
The page's own example: “Like-for-like 80,000 BTU gas furnace: $55 + $0.88 + $25 = $80.88.”
Not included: Heating units over 150,000 BTU ($25 per extra 50,000 BTU) and boilers; whether an electric AC condenser swap needs a permit (the page says confirm with DNS).
Source: MCO 200-33-23 (mechanical permit fees). Read the Milwaukee hvac permit page, which quotes the rule and records when it was last verified (Oct 2026).
Milwaukee adu permit fee
A detached ADU is billed as new construction ($0.55 per sq ft building permit, $0.25 per sq ft plan review, energy and erosion control fees, 1.6% surcharge, processing and a $450 assessor charge); an internal ADU is an alteration at 1.6% of cost; trade permits are separate.
What the city page states: 800 sq ft detached ADU: building, review, energy and erosion fees $1,188.08 with surcharge and processing, plus $450 assessor; electrical $375.52; plumbing $223.20; HVAC $192.64. Total $2,429.44.
Not computed here: The page gives the building-side rates but says only that each permit has a $20 to $25 processing fee, without saying how many processing fees the $1,188.08 includes; the trade permit amounts ($375.52, $223.20, $192.64) are totals without their item lines.
City fees only, on the ordinary residential path each page prices: the building or trade permit plus the mandatory lines the city adds to it. It leaves out whatever the page says is separate (a designer's fee, a contractor's licence, a utility connection) and anything the page does not price. Fee schedules change on the city's budget cycle; the month each page was last verified is Oct 2026, and the verification method explains how changes are caught.
Frequently asked questions
200 sq ft (10x20) shed: 200 x $0.45 = $90, plus $75 review = $165, plus $2.64 and $20 = $187.64.. A shed of 150 sq ft or less at least 3 feet from every lot line needs no permit; a larger shed is treated like a garage at $0.45 per sq ft plus a $75 plan review, the 1.6% surcharge and $20 processing.
A one- or two-family fence permit is $60.40 in total. Every new or replacement fence at a one- or two-family home needs a permit: the $25 fence fee, a $0.40 surcharge and a $35 processing fee, $60.40 regardless of length or height.
$150 + $50 = $200, plus $3.20 surcharge and $20 = $223.20.. Attached decks and freestanding decks over 2 feet need a permit at 1.6% of the job cost ($150 minimum) plus a $50 plan review, a 1.6% surcharge on both and $20 processing.
New above-ground pool with a pump circuit: $86.20 pool permit + $110 + $1.76 + $25 electrical = $222.96.. A pool at least 15 by 3 feet or 3,965 gallons needs an $86.20 private pool permit (surcharge included) from the DNS Environmental Section, after a licensed electrician pulls the electrical permit ($110 pool line plus 1.6% and $25 processing).
Re-framing 1,000 sq ft of roof for $20,000: $320 + $250 = $570, plus $9.12 and $20 = $599.12.. Replacing roof covering or decking on a house or duplex needs no permit; structural roof work is an alteration at 1.6% of cost ($150 minimum) plus $0.25 per sq ft plan review ($125 minimum), the 1.6% surcharge and $20 processing.
Every line is read off the Milwaukee permit pages on this site, which quote the city's own fee schedule, bulletin or ordinance and record the month the sources were last verified (Oct 2026). The calculator holds no fee of its own.