This calculator applies the fee lines quoted on the Orlando permit pages: the city's own plan review, permit and surcharge figures, as published by the Permitting Services Division. Pick a project, change the inputs, and the breakdown shows each line and how it is computed. 9 of 10 project types have a computable formula on their page; the rest show the page's own figure.
- Orlando's 2026 residential fee schedule prices a building permit on construction cost (the ICC Building Valuation Data figure or the contract price, whichever is greater): $66.24 for the first $1,000 plus $4.41 for each additional $1,000 or fraction.
- The schedule lists four surcharges on the building permit fee: 1.5% ($2 minimum), 1% ($2 minimum), 5% concurrency and 3% technology, each on the base fee. It lists them under the building case type without saying which jobs they apply to; the pages, and this calculator, assume all four apply.
- Electrical and mechanical permits are $66.24 for the first $1,000 plus $11.03 per additional $1,000 to $25,000 (mechanical then $8.28 per $1,000); plumbing/gas is $66.24 plus $7 per fixture; each adds the 3% technology surcharge.
- Work done without a permit costs an additional 100% of the permit fee, and the city says it is reviewing its fees under HB803, so valuation-based figures may change.
Orlando shed permit fee
Orlando publishes no shed size exemption: a shed is a building permit at $66.24 for the first $1,000 of cost plus $4.41 per further $1,000 or fraction, plus four surcharges, about $85 for a $3,000 shed; lights or outlets are a separate electrical permit.
| Line | How it is computed | Amount |
|---|---|---|
| Building permit (fee schedule) | $66.24 + 2 × $4.41 per 1,000 above 1,000 | $75.06 |
| Surcharge (1.5%, $2 minimum) | 1.5% of $75.06 (minimum $2) | $2 |
| Surcharge (1%, $2 minimum) | 1% of $75.06 (minimum $2) | $2 |
| Concurrency surcharge (5%) | 5% of $75.06 | $3.75 |
| Technology surcharge (3%) | 3% of $75.06 | $2.25 |
Orlando fence permit fee
No permit for a fence 6 ft or less in wood, vinyl, chain-link, aluminum, wrought iron or plants at a one- or two-family home outside a historic district unless a permit trigger applies (masonry, pool barrier, easement, rear alley, powered gate, floodplain); a permitted fence is a building permit priced on cost plus four surcharges, $89.82 for a $4,000 fence.
| Line | How it is computed | Amount |
|---|---|---|
| Building permit (fee schedule) | $66.24 + 3 × $4.41 per 1,000 above 1,000 | $79.47 |
| Surcharge (1.5%, $2 minimum) | 1.5% of $79.47 (minimum $2) | $2 |
| Surcharge (1%, $2 minimum) | 1% of $79.47 (minimum $2) | $2 |
| Concurrency surcharge (5%) | 5% of $79.47 | $3.97 |
| Technology surcharge (3%) | 3% of $79.47 | $2.38 |
Orlando deck permit fee
Every deck needs a building permit (no size or height exemption) priced at $66.24 for the first $1,000 of cost plus $4.41 per further $1,000 or fraction, plus four surcharges: $118.41 for a $10,000 deck.
| Line | How it is computed | Amount |
|---|---|---|
| Building permit (fee schedule) | $66.24 + 9 × $4.41 per 1,000 above 1,000 | $105.93 |
| Surcharge (1.5%, $2 minimum) | 1.5% of $105.93 (minimum $2) | $2 |
| Surcharge (1%, $2 minimum) | 1% of $105.93 (minimum $2) | $2 |
| Concurrency surcharge (5%) | 5% of $105.93 | $5.30 |
| Technology surcharge (3%) | 3% of $105.93 | $3.18 |
Orlando pool permit fee
A pool needs building, electrical and staff-created engineering permits; the building permit is $66.24 for the first $1,000 of cost plus $4.41 per further $1,000 or fraction, plus four surcharges ($263.24 for a $40,000 pool), and the schedule lists a $50 Swimming Pool electrical line.
| Line | How it is computed | Amount |
|---|---|---|
| Building permit (fee schedule) | $66.24 + 39 × $4.41 per 1,000 above 1,000 | $238.23 |
| Surcharge (1.5%, $2 minimum) | 1.5% of $238.23 | $3.57 |
| Surcharge (1%, $2 minimum) | 1% of $238.23 | $2.38 |
| Concurrency surcharge (5%) | 5% of $238.23 | $11.91 |
| Technology surcharge (3%) | 3% of $238.23 | $7.15 |
| Technology surcharge on the electrical line (3%) | 3% of $0 | $0 |
Orlando roof replacement permit fee
Replacing or re-covering a roof needs a building permit (no size exemption, not eligible for the $7,500 exemption) at $66.24 for the first $1,000 of cost plus $4.41 per further $1,000 or fraction, plus four surcharges: $142.22 for a $15,000 re-roof.
| Line | How it is computed | Amount |
|---|---|---|
| Building permit (fee schedule) | $66.24 + 14 × $4.41 per 1,000 above 1,000 | $127.98 |
| Surcharge (1.5%, $2 minimum) | 1.5% of $127.98 (minimum $2) | $2 |
| Surcharge (1%, $2 minimum) | 1% of $127.98 (minimum $2) | $2 |
| Concurrency surcharge (5%) | 5% of $127.98 | $6.40 |
| Technology surcharge (3%) | 3% of $127.98 | $3.84 |
Orlando bathroom remodel permit fee
Plumbing, electrical and wall work each need their own permit: a building permit on the whole job (cost formula plus four surcharges), plumbing at $66.24 plus $7 per fixture plus 3%, and electrical on its own work ($68.23 for $1,000); resetting the same toilet needs none, and cosmetic work under $7,500 may be exempted on written request.
| Line | How it is computed | Amount |
|---|---|---|
| Building permit (fee schedule) | $66.24 + 11 × $4.41 per 1,000 above 1,000 | $114.75 |
| Surcharge (1.5%, $2 minimum) | 1.5% of $114.75 (minimum $2) | $2 |
| Surcharge (1%, $2 minimum) | 1% of $114.75 (minimum $2) | $2 |
| Concurrency surcharge (5%) | 5% of $114.75 | $5.74 |
| Technology surcharge (3%) | 3% of $114.75 | $3.44 |
| Plumbing permit ($66.24 + $7 per fixture) | $66.24 + 3 × $7 per 1 above 0 | $87.24 |
| Plumbing technology surcharge (3%) | 3% of $87.24 | $2.62 |
| Electrical permit ($1,000 of work, incl. 3%) optional | flat | $68.23 |
Orlando kitchen remodel permit fee
A kitchen alteration pays a building permit on the whole job (cost formula plus four surcharges) plus separate electrical and plumbing/gas permits on their own work, about $304 for a $15,000 kitchen with $2,000 of electrical work and two fixtures; cosmetic work under $7,500 may be exempted on written request.
| Line | How it is computed | Amount |
|---|---|---|
| Building permit (fee schedule) | $66.24 + 14 × $4.41 per 1,000 above 1,000 | $127.98 |
| Surcharge (1.5%, $2 minimum) | 1.5% of $127.98 (minimum $2) | $2 |
| Surcharge (1%, $2 minimum) | 1% of $127.98 (minimum $2) | $2 |
| Concurrency surcharge (5%) | 5% of $127.98 | $6.40 |
| Technology surcharge (3%) | 3% of $127.98 | $3.84 |
| Electrical permit, $2,000 of work (incl. 3%) | flat | $79.59 |
| Plumbing permit ($66.24 + $7 per fixture) optional | $66.24 + 2 × $7 per 1 above 0 | $80.24 |
| Plumbing technology surcharge (3%) | 3% of $80.24 | $2.41 |
Orlando electrical panel permit fee
A panel replacement or service upgrade needs an electrical permit at $66.24 for the first $1,000 of cost plus $11.03 per further $1,000 or fraction up to $25,000, plus 3%: $90.95 for a $3,000 panel swap; the schedule also lists a $50 Change of Service line, so ask which applies.
| Line | How it is computed | Amount |
|---|---|---|
| Electrical permit (cost formula) | $66.24 + 2 × $11.03 per 1,000 above 1,000 | $88.30 |
| Technology surcharge (3%) | 3% of $88.30 | $2.65 |
Orlando hvac permit fee
An AC, heat pump, air handler or furnace change-out needs a mechanical permit at $66.24 for the first $1,000 of cost plus $11.03 per further $1,000 or fraction up to $25,000 (then $8.28 per $1,000), plus 3%: $147.75 for an $8,000 change-out.
| Line | How it is computed | Amount |
|---|---|---|
| Mechanical permit (cost formula) | $66.24 + 7 × $11.03 per 1,000 above 1,000 | $143.45 |
| Technology surcharge (3%) | 3% of $143.45 | $4.30 |
Orlando adu permit fee
ADUs are allowed in R-1, R-2, R-3, MXD, O and some PD zones by lot size; the city puts typical ADU building permit fees at $450–$1,050 and impact fees at $1,300–$3,100, with trade and engineering permits charged separately and a 100% rebate for qualifying affordable rentals.
What the city page states: The city's ADU Incentive Program page puts typical ADU building permit fees at $450–$1,050 and ADU impact fees at $1,300–$3,100.
What the estimate covers
City fees only, on the ordinary residential path each page prices: the building or trade permit plus the mandatory lines the city adds to it. It leaves out whatever the page says is separate (a designer's fee, a contractor's licence, a utility connection) and anything the page does not price. Fee schedules change on the city's budget cycle; the month each page was last verified is Nov 2026, and the verification method explains how changes are caught.
Frequently asked questions
Other city calculators
- Albuquerque, NM
- Aurora, CO
- Austin, TX
- Baltimore, MD
- Boston, MA
- Charlotte, NC
- Chicago, IL
- Cincinnati, OH
- Colorado Springs, CO
- Corpus Christi, TX
- Dallas, TX
- Denver, CO
- El Paso, TX
- Fort Worth, TX
- Fresno, CA
- Honolulu, HI
- Houston, TX
- Indianapolis, IN
- Irvine, CA
- Jacksonville, FL
- Kansas City, MO
- Las Vegas, NV
- Long Beach, CA
- Los Angeles, CA
- Louisville, KY
- Miami, FL
- Milwaukee, WI
- Minneapolis, MN
- Nashville, TN
- New Orleans, LA
- New York City, NY
- Philadelphia, PA
- Phoenix, AZ
- Pittsburgh, PA
- Portland, OR
- Raleigh, NC
- Riverside, CA
- Sacramento, CA
- San Antonio, TX
- San Diego, CA
- San Francisco, CA
- San Jose, CA
- Seattle, WA
- St. Louis, MO
- St. Paul, MN
- Stockton, CA
- Tampa, FL
- Tucson, AZ
- Tulsa, OK
- Virginia Beach, VA
- Washington, DC
- Wichita, KS
Related: All cities · Research: fees compared across 30 cities · Orlando permit guide