What's Required in Aurora
- A permit is required when kitchen work changes wiring, plumbing or anything inside the walls.
- Cosmetic work such as cabinets, countertops and same-place appliances usually needs no permit.
- Moving a sink, converting gas to electric, or adding a range or hood requires permits.
- Report your project valuation and materials cost so the fee and use tax can be calculated.
- Electrical work is reviewed to the 2026 National Electrical Code.
- Electricians and plumbers you hire need State of Colorado master's and contractor's licenses.
- Pass rough and final inspections before closing walls and finishing.
Do I need a permit to remodel my kitchen in Aurora?
It depends on whether you open the walls. The City of Aurora Building Division's handbook gives the rule of thumb: if your remodeling work entails changing anything within the wall space, such as wiring or plumbing, a building permit is needed. Swapping finishes is not. Aurora's in-wall rule comes from its Do It Right home improvement handbook, dated March 2019; confirm it still applies at 303.739.7420. The handbook says replacing cabinets, countertops, sinks and appliances usually does not require a permit, but moving a sink, changing an oven or stove from gas to electric, or installing a new range or exhaust hood will require permits. The permit chart adds that interior remodels need a permit unless they are cosmetic only with no moving of walls.
What does a kitchen permit cost in Aurora?
Remodels are not on the city's flat-rate sheet, so the fee comes from the permit fee calculator, which works from your project valuation. Runs of the calculator (Adams County):
- $15,000 kitchen: permit fee $454; plan review, if charged, adds $454 ($908 in all).
- $25,000 kitchen: permit fee $694; plan review, if charged, adds $694 ($1,388 in all).
- $50,000 kitchen: permit fee $1,117.50; plan review, if charged, adds $1,117.50 ($2,235 in all).
The calculator labels plan review "if applicable". The handbook says most remodeling projects can be permitted without plan submittal, which covers most kitchen and bath remodels, while the chart marks interior remodels as needing plans. Our reading is that the plan review line is charged when the city requires plans, so treat the permit fee as your base and plan review as a possible second line of the same amount, and ask the Permit Center before budgeting it. On top of the fees comes the use tax deposit, 3.75% of materials cost to the city plus 0.25% in Arapahoe County; for the $25,000 job the calculator estimated $468.75 in Adams County.
Kitchen scenarios
| What you are doing | City filing | Rule |
|---|---|---|
| New cabinets and countertops, same layout | None | Unless the install requires plumbing changes |
| Replacing appliances in place | None | Permit if new install where none existed |
| Moving the sink | Building permit | In-wall plumbing work |
| Gas range to electric, or new range or hood | Building permit | Handbook names these as requiring permits |
| New circuits or added light fixtures | Building permit | New device where none existed needs electrical permit |
| Removing or moving a wall | Building permit | Structural change; ask the Permit Center whether plans are required |
Who can do the work?
The handbook says most remodels can be performed by the owner of the home without hiring a contractor, and homeowners can obtain permits for work on their primary home. A hired general remodeler needs an Aurora license (the city's Remodeling Contractor license requires registration and 3 years of documented experience). Electricians and plumbers you hire need State of Colorado master's and contractor's licenses; Aurora issues no separate license. Ask the Permit Center whether an owner may do their own electrical or plumbing under the Statement of Understanding.
Inspections and timing
The chart lists inspections for interior remodels as varying by project. The city's basement-finish checklist puts plumbing, electrical and mechanical roughs before framing rough; ask which apply to your kitchen. Request inspections online through Aurora4Biz, by email, or at 303.739.7420. The permit expires if work does not start within six months or is not completed within one year. Electrical work is reviewed to the 2026 National Electrical Code, which Aurora began enforcing on 8-1-2026. The city's Adopted Building Codes PDF (revised 02/2026) still shows the 2023 NEC; the Permits page notice, effective 8-1-2026, governs new applications.
How to Get a Kitchen Remodel Permit in Aurora
Sort cosmetic from in-wall work
List what changes inside walls: wiring, plumbing, gas or ductwork. Those items need a permit.
Estimate the fee
Enter your project valuation and county in the city's permit fee calculator and add the use tax deposit.
Ask about plans
Call the Permit Center to confirm whether your scope needs a plan submittal and plan review.
Apply
Submit through the Aurora4Biz building portal or in person at the Permit Center, 15151 E. Alameda Parkway.
Inspect before closing walls
Schedule rough inspections before drywall and finals when the kitchen is complete.