City fee lines from the Phoenix permit pages, computed for your project. Sourced, verified Sep 2026.
Verified Sep 2026Calculator
This calculator applies the fee lines quoted on the Phoenix permit pages: the city's own plan review, permit and surcharge figures, as published by the City of Phoenix Planning & Development. Pick a project, change the inputs, and the breakdown shows each line and how it is computed. 10 of 10 project types have a computable formula on their page; the rest show the page's own figure.
Every page prices on valuation (city valuation guide or the contract price, whichever is higher) through Table A of the 2026 Development Fee Schedule.
Table A is assembled from four pages: $195 + $12 per $1,000 to $10,000, $303 + $10 per $1,000 to $50,000, $703 + $9 per $1,000 above; fences and water heaters valued $1 to $1,000 pay $98.
Phoenix shed permit fee
A shed over 200 sq ft (or any shed with utilities) is valued at $69.64 per sq ft and pays the Table A permit fee plus a plan review fee equal to it.
Exempt: No building permit for a one-story storage shed of 200 sq ft or less with no utilities (2024 PBCC 105.2); any electrical or plumbing run to it needs its own permit.
City valuation: 240 sq ft × $69.64 = $16,713.60
$746estimated city fees at the inputs above
Line
How it is computed
Amount
Permit fee (Table A)
$303 + 7 × $10 per 1,000 above 10,000
$373
Residential plan review (100% of permit fee)
100% of $373
$373
The page's own example: “another $373, for a total of about $746”
Not included: Sheds of 200 sq ft or less with no utilities need no permit; electrical or plumbing permits for utilities run to a shed are separate.
Source: 2026 Development Fee Schedule (Appendix A.2), Table A. Read the Phoenix shed permit page, which quotes the rule and records when it was last verified (Sep 2026).
Phoenix fence permit fee
Fences over 3 ft pay Table A on the city's per-foot valuation, with a $98 minimum for fences valued at $1,000 or less.
$219estimated city fees at the inputs above
Line
How it is computed
Amount
Permit fee (Table A)
$195 + 2 × $12 per 1,000 above 1,000
$219
The page's own example: “so $195 + 2 x $12 = $219”
Not included: Fences 3 ft or lower and in-kind replacements of a permitted fence need no permit; fences over 7 ft need structural design.
Source: 2026 Development Fee Schedule (Appendix A.2), Table A. Read the Phoenix fence permit page, which quotes the rule and records when it was last verified (Sep 2026).
Phoenix deck permit fee
A deck 30 in or more above grade pays Table A on a $20 per sq ft valuation, plus a plan review equal to the permit fee over $5,000.
City valuation: 200 sq ft × $20 = $4,000
$231estimated city fees at the inputs above
Line
How it is computed
Amount
Permit fee (Table A)
$195 + 3 × $12 per 1,000 above 1,000
$231
The page's own example: “so the permit fee is $195 + 3 x $12 = $231”
Not included: Uncovered decks under 30 in above grade need no permit; a roof or patio cover is valued on top of the deck.
Source: 2026 Development Fee Schedule (Appendix A.2), Table A. Read the Phoenix deck permit page, which quotes the rule and records when it was last verified (Sep 2026).
Phoenix pool permit fee
A pool over 18 in deep pays Table A on a valuation of at least $21,000, a $30 aquatics surcharge, and either a $98 plot plan review (standard plan) or a 100% plan review (custom pool).
$541estimated city fees at the inputs above
Line
How it is computed
Amount
Permit fee (Table A)
$303 + 11 × $10 per 1,000 above 10,000
$413
Aquatics program surcharge
flat
$30
Plot plan review (standard plan)
flat
$98
The page's own example: “for about $541 in city fees”
Not included: Ramadas, cabanas and shade structures are separate permits; the engineer's sealed plans or letters.
Source: 2026 Development Fee Schedule (Appendix A.2), Table A. Read the Phoenix pool permit page, which quotes the rule and records when it was last verified (Sep 2026).
Phoenix roof replacement permit fee
Same-material re-roofs need no permit; a permitted re-roof pays Table A on valuation, plus a 100% plan review over $5,000 when plans are reviewed (shingle-to-tile).
$231estimated city fees at the inputs above
Line
How it is computed
Amount
Permit fee (Table A)
$195 + 3 × $12 per 1,000 above 1,000
$231
The page's own example: “so the permit fee is $195 + 3 x $12 = $231”
Not included: A same-material re-roof is exempt; the engineer's framing evaluation for a tile conversion.
Source: 2026 Development Fee Schedule (Appendix A.2), Table A. Read the Phoenix roof replacement permit page, which quotes the rule and records when it was last verified (Sep 2026).
Phoenix bathroom remodel permit fee
A bathroom remodel that moves fixtures or redoes shower tile pays Table A on bathroom area x $170.80 x 40%, plus a 100% plan review over $5,000.
City valuation: 60 sq ft × $170.80 × 0.4 = $4,099.20
$243estimated city fees at the inputs above
Line
How it is computed
Amount
Permit fee (Table A)
$195 + 4 × $12 per 1,000 above 1,000
$243
The page's own example: “so the permit fee is $195 + 4 x $12 = $243”
Not included: Fixture swaps in place need no permit; repiping is valued separately.
Source: 2026 Development Fee Schedule (Appendix A.2), Table A. Read the Phoenix bathroom remodel permit page, which quotes the rule and records when it was last verified (Sep 2026).
Phoenix kitchen remodel permit fee
A kitchen remodel that moves plumbing, adds circuits or removes walls pays Table A on kitchen area x $170.80 x 20%, 40% or 60%, plus a plan review equal to the permit fee.
$510estimated city fees at the inputs above
Line
How it is computed
Amount
Permit fee (Table A)
$195 + 5 × $12 per 1,000 above 1,000
$255
Residential plan review (100% of permit fee) optional
100% of $255
$255
The page's own example: “the residential plan review fee of 100% adds $255, about $510”
Not included: Same-place cabinet and fixture replacement needs no permit.
Source: 2026 Development Fee Schedule (Appendix A.2), Table A. Read the Phoenix kitchen remodel permit page, which quotes the rule and records when it was last verified (Sep 2026).
Phoenix electrical panel permit fee
A panel or service upgrade pays Table A on the city's service valuation ($1,750 for 100 A, $2,620 for 200 A, $3,850 for 400 A) or the contract price if higher, with no plan review under $5,000.
$219estimated city fees at the inputs above
Line
How it is computed
Amount
Permit fee (Table A)
$195 + 2 × $12 per 1,000 above 1,000
$219
The page's own example: “so the permit fee is $195 + 2 x $12 = $219”
Not included: Re-inspection fees of $195 after a second failed inspection; breaker swaps up to 125 A are exempt.
Source: 2026 Development Fee Schedule (Appendix A.2), Table A. Read the Phoenix electrical panel permit page, which quotes the rule and records when it was last verified (Sep 2026).
Phoenix hvac permit fee
An in-kind outdoor swap up to 5 tons is exempt; other HVAC work pays Table A on the city's valuation ($4,500 replacement, $2,000 evaporative cooler, $6,600 plus rooftop with new support).
$243estimated city fees at the inputs above
Line
How it is computed
Amount
Permit fee (Table A)
$195 + 4 × $12 per 1,000 above 1,000
$243
The page's own example: “A permitted $4,500 replacement is therefore $195 + 4 x $12 = $243”
Not included: An in-kind outdoor replacement up to 5 tons in the same spot needs no permit.
Source: 2026 Development Fee Schedule (Appendix A.2), Table A. Read the Phoenix hvac permit page, which quotes the rule and records when it was last verified (Sep 2026).
Phoenix adu permit fee
An ADU is valued at $170.80 per sq ft and pays Table A ($703 plus $9 per $1,000 over $50,000) plus plan review at 80% of the permit fee.
City valuation: 600 sq ft × $170.80 = $102,480
$2,124estimated city fees at the inputs above
Line
How it is computed
Amount
Permit fee (Table A)
$703 + 53 × $9 per 1,000 above 50,000
$1,180
Residential plan review (80% of permit fee)
80% of $1,180
$944
The page's own example: “another $944, for about $2,124”
Not included: Development impact fees and water and sewer fees, which vary by address.
Source: 2026 Development Fee Schedule (Appendix A.2), Table A. Read the Phoenix adu permit page, which quotes the rule and records when it was last verified (Sep 2026).
What the estimate covers
City fees only, on the ordinary residential path each page prices: the building or trade permit plus the mandatory lines the city adds to it. It leaves out whatever the page says is separate (a designer's fee, a contractor's licence, a utility connection) and anything the page does not price. Fee schedules change on the city's budget cycle; the month each page was last verified is Sep 2026, and the verification method explains how changes are caught.
Frequently asked questions
another $373, for a total of about $746. A shed over 200 sq ft (or any shed with utilities) is valued at $69.64 per sq ft and pays the Table A permit fee plus a plan review fee equal to it.
so $195 + 2 x $12 = $219. Fences over 3 ft pay Table A on the city's per-foot valuation, with a $98 minimum for fences valued at $1,000 or less.
so the permit fee is $195 + 3 x $12 = $231. A deck 30 in or more above grade pays Table A on a $20 per sq ft valuation, plus a plan review equal to the permit fee over $5,000.
for about $541 in city fees. A pool over 18 in deep pays Table A on a valuation of at least $21,000, a $30 aquatics surcharge, and either a $98 plot plan review (standard plan) or a 100% plan review (custom pool).
so the permit fee is $195 + 3 x $12 = $231. Same-material re-roofs need no permit; a permitted re-roof pays Table A on valuation, plus a 100% plan review over $5,000 when plans are reviewed (shingle-to-tile).
Every line is read off the Phoenix permit pages on this site, which quote the city's own fee schedule, bulletin or ordinance and record the month the sources were last verified (Sep 2026). The calculator holds no fee of its own.