Riverside Permit Fee Calculator

City fee lines from the Riverside permit pages, computed for your project. Sourced, verified Nov 2026.

Verified Nov 2026Calculator

This calculator applies the fee lines quoted on the Riverside permit pages: the city's own plan review, permit and surcharge figures, as published by the Riverside Building & Safety Division. Pick a project, change the inputs, and the breakdown shows each line and how it is computed. 10 of 10 project types have a computable formula on their page; the rest show the page's own figure.

  • Riverside prices residential permits from its FY 2026/27 Schedule of Fees and Charges, in effect since July 1, 2026, with flat, per-square-foot and per-item lines, not as a percentage of job value.
  • The pages read each fee line as plan check and permit combined, their reading of the division's March 2026 fee sheet; the schedule's separate $341 Building Plan Check line may be added, so ask the counter.
  • Every separate permit carries its own $41 issuance fee. The schedule lists one under each of building, electrical, plumbing and mechanical, so a job split into several trade permits pays $41 for each.
  • The 14% surcharge (10% General Plan Maintenance plus 4% Technology): the schedule marks only some lines with a caret, while the city's fee sheet applies it to all plan check and permit fees. This calculator follows the fee sheet, as the pages' examples do, applying it to every line including the $41 issuance fee and the $82 Planning fee; the Fire Department's $152 ADU plan check carries no caret and is not surcharged.
  • The schedule marks the $332 Planning zoning plan check both as including and as adding the surcharge; the ADU calculator surcharges it by default and offers the included reading (about $1,570 to $2,090 instead of $1,617 to $2,137).
  • The division's fee sheet says per-square-foot fees default to set minimums (400 sq ft for accessory structures, 100 sq ft for home remodels, 700 sq ft for new dwellings); the pages say to ask whether they carry over to the new rates. The shed and bathroom calculators offer the minimum as an alternative.

What the estimate covers

City fees only, on the ordinary residential path each page prices: the building or trade permit plus the mandatory lines the city adds to it. It leaves out whatever the page says is separate (a designer's fee, a contractor's licence, a utility connection) and anything the page does not price. Fee schedules change on the city's budget cycle; the month each page was last verified is Nov 2026, and the verification method explains how changes are caught.

Frequently asked questions

Example, a 200 square foot shed: 200 x $0.80 = $160, plus $41 issuance and $82 planning, $283, plus 14%, about $323.. A one-story detached shed up to 120 sq ft needs no building permit; a larger one pays the accessory structure rate of $0.80 per sq ft, the $41 issuance fee and the $82 Planning over-the-counter fee, plus the 14% surcharge.
A 200-foot run: $142 + $35 = $177, plus $41 = $218, plus 14%, about $249.. Fences up to 7 ft need no building permit (pool and spa barriers always do); a taller wall or fence pays the Block Walls/Fence line of $142 for the first 100 linear ft plus $35 per further 100, or the retaining wall line, plus the $41 issuance fee and the 14% surcharge.
Example, a 300 square foot deck: $348 + $41 = $389, plus 14%, about $443.. Riverside's exempt list has no deck item, so plan on a permit: $348 for the first 500 sq ft plus $150 per further 500 sq ft, the $41 issuance fee and the 14% surcharge; the 2025 CRC exempts only a deck of 200 sq ft or less, no more than 30 inches above grade, not attached and not serving the exit door. That exemption is the model-code figure; Riverside's Bulletin 140 does not repeat it.
Example, a fiberglass pool: $389 + $85 + $41 = $515, plus 14%, about $587.. Every pool or spa except a small prefabricated above-ground pool under 24 inches deep needs a building permit: $389 fiberglass or vinyl, or $583 for a residential pool or spa up to 800 sq ft, plus the $85 pool plan check, the $41 issuance fee and the 14% surcharge, and a separate electrical permit with its own $41 issuance fee.
Example, a 1,000 square foot overlay: $103 + $41 = $144, plus 14%, about $164.. Every reroof needs a permit, issuable same day: $103 overlay, $123 tear-off or $178 tear-off with new sheathing for the first 1,000 sq ft plus $25 per further 500 sq ft, the $41 issuance fee and the 14% surcharge.
Every line is read off the Riverside permit pages on this site, which quote the city's own fee schedule, bulletin or ordinance and record the month the sources were last verified (Nov 2026). The calculator holds no fee of its own.