This calculator applies the fee lines quoted on the Portland permit pages: the city's own plan review, permit and surcharge figures, as published by the Portland Permitting & Development. Pick a project, change the inputs, and the breakdown shows each line and how it is computed. 10 of 10 project types have a computable formula on their page; the rest show the page's own figure.
- Building permits use one valuation table across the pages: $220.85 for the first $2,000 plus $13.91 per $1,000 to $25,000, $540.78 plus $10.26 per $1,000 to $50,000, $797.28 plus $6.81 per $1,000 above; plan review is 65% of the permit fee and the Development Services fee runs on a parallel table.
- Oregon's 12 percent surcharge applies to the building permit fee and to each trade permit fee, not to plan review or the Development Services fee.
Portland shed permit fee
A shed over 200 sq ft (or over 15 ft tall) pays a valuation-based building permit plus 65 percent plan review, a Development Services fee, the 12 percent state surcharge and a $125 zoning inspection.
| Line | How it is computed | Amount |
|---|---|---|
| Building permit | $220.85 + 10 × $13.91 per 1,000 above 2,000 | $359.95 |
| Plan review (65%) | 65% of $359.95 | $233.97 |
| Development Services fee | $35.74 + 10 × $3.74 per 1,000 above 2,000 | $73.14 |
| Oregon 12 percent surcharge | 12% of $359.95 | $43.19 |
| Zoning inspection | flat | $125 |
Portland fence permit fee
Wood fences up to 7 ft, masonry up to 4 ft and chain link up to 8 ft need no permit; taller fences and every pool barrier pay a valuation-based building permit with 65 percent plan review, a Development Services fee and the 12 percent surcharge.
| Line | How it is computed | Amount |
|---|---|---|
| Building permit | $220.85 + 6 × $13.91 per 1,000 above 2,000 | $304.31 |
| Plan review (65%) | 65% of $304.31 | $197.80 |
| Development Services fee | $35.74 + 6 × $3.74 per 1,000 above 2,000 | $58.18 |
| Oregon 12 percent surcharge | 12% of $304.31 | $36.52 |
Portland deck permit fee
A deck more than 30 inches above grade pays a valuation-based building permit plus 65 percent plan review, a Development Services fee, the 12 percent surcharge and a $125 zoning inspection; lower decks need no building permit.
| Line | How it is computed | Amount |
|---|---|---|
| Building permit | $220.85 + 7 × $13.91 per 1,000 above 2,000 | $318.22 |
| Plan review (65%) | 65% of $318.22 | $206.84 |
| Development Services fee | $35.74 + 7 × $3.74 per 1,000 above 2,000 | $61.92 |
| Oregon 12 percent surcharge | 12% of $318.22 | $38.19 |
| Zoning inspection | flat | $125 |
Portland pool permit fee
An in-ground pool pays a valuation-based building permit with 65 percent plan review, a Development Services fee and the 12 percent surcharge, plus an electrical permit for the pump circuit and a mechanical permit for a gas heater.
| Line | How it is computed | Amount |
|---|---|---|
| Building permit | $797.28 + 10 × $6.81 per 1,000 above 50,000 | $865.38 |
| Plan review (65%) | 65% of $865.38 | $562.50 |
| Development Services fee | $192.01 + 10 × $1.88 per 1,000 above 50,000 | $210.81 |
| Electrical permit, first branch circuit | flat | $174 |
| Each added circuit | 0 circuits × $21 (first 1 circuits free) | $0 |
| Mechanical permit, gas heater ($167 minimum) optional | flat | $167 |
| Oregon 12 percent surcharge | 12% of $1,206.38 | $144.77 |
Portland roof replacement permit fee
A similar-weight reroof needs no permit; a reroof in a Wildfire Zone, on a townhouse or with photovoltaic roofing pays a valuation-based building permit, the 12 percent surcharge, a Development Services fee and a 65 percent plan review fee.
| Line | How it is computed | Amount |
|---|---|---|
| Building permit | $220.85 + 16 × $13.91 per 1,000 above 2,000 | $443.41 |
| Oregon 12 percent surcharge | 12% of $443.41 | $53.21 |
| Development Services fee | $35.74 + 16 × $3.74 per 1,000 above 2,000 | $95.58 |
| Plan review and process fee (65%) | 65% of $443.41 | $288.22 |
Portland bathroom remodel permit fee
A same-layout bathroom refit takes trade permits: $63 per plumbing fixture, $174 for the first new circuit and a $167 mechanical minimum for a ducted fan, each plus the 12 percent state surcharge.
| Line | How it is computed | Amount |
|---|---|---|
| Plumbing fixtures | 3 fixtures × $63 | $189 |
| Electrical permit, first new circuit optional | flat | $174 |
| Plan review (65% of the building permit, if any) | 65% of $0 | $0 |
| Oregon 12 percent surcharge | 12% of $363 | $43.56 |
Portland kitchen remodel permit fee
A same-layout kitchen remodel takes trade permits: $63 per plumbing fixture, $174 for the first circuit and $21 for each additional, and the $167 mechanical minimum for a hood or gas line, each plus the 12 percent surcharge.
| Line | How it is computed | Amount |
|---|---|---|
| Plumbing fixtures | 3 fixtures × $63 | $189 |
| Electrical permit, first circuit optional | flat | $174 |
| Each additional circuit optional | 1 circuits × $21 (first 1 circuits free) | $21 |
| Mechanical permit, hood or gas line ($167 minimum) optional | flat | $167 |
| Plan review (65% of the building permit, if any) | 65% of $0 | $0 |
| Oregon 12 percent surcharge | 12% of $551 | $66.12 |
Portland electrical panel permit fee
A panel or service change is a flat electrical fee by amperage ($212 for 200 amps, $298 for 201 to 400, $391 for 401 to 600) plus $21 per added circuit and the 12 percent state surcharge.
| Line | How it is computed | Amount |
|---|---|---|
| Service or feeder | $212 | $212 |
| Added branch circuits | 0 circuits × $21 | $0 |
| Oregon 12 percent surcharge | 12% of $212 | $25.44 |
Portland hvac permit fee
Mechanical permits are priced per item (furnace $91, heat pump $84, AC or air handler $44, gas piping $25) under a $167 one- and two-family minimum, plus the 12 percent surcharge; a heat pump or AC adds a $174 electrical permit.
| Line | How it is computed | Amount |
|---|---|---|
| Furnace or burner optional | flat | $91 |
| One- and two-family minimum | brings the total up to the $167 minimum | $76 |
| Oregon 12 percent surcharge | 12% of $167 | $20.04 |
Portland adu permit fee
An ADU conversion pays a valuation-based building permit with 65 percent plan review, a Development Services fee, the 12 percent surcharge and a $125 zoning inspection, plus per-item electrical, plumbing and mechanical permits; System Development Charges apply unless waived.
| Line | How it is computed | Amount |
|---|---|---|
| Building permit | $797.28 + 10 × $6.81 per 1,000 above 50,000 | $865.38 |
| Plan review (65%) | 65% of $865.38 | $562.50 |
| Development Services fee | $192.01 + 10 × $1.88 per 1,000 above 50,000 | $210.81 |
| Zoning inspection | flat | $125 |
| Electrical permit, 1,000 sq ft wiring package optional | flat | $408 |
| Plumbing fixtures optional | 5 fixtures × $63 | $315 |
| Mechanical permit ($167 minimum) optional | flat | $167 |
| Oregon 12 percent surcharge | 12% of $1,755.38 | $210.65 |
What the estimate covers
City fees only, on the ordinary residential path each page prices: the building or trade permit plus the mandatory lines the city adds to it. It leaves out whatever the page says is separate (a designer's fee, a contractor's licence, a utility connection) and anything the page does not price. Fee schedules change on the city's budget cycle; the month each page was last verified is Oct 2026, and the verification method explains how changes are caught.
Frequently asked questions
Other city calculators
- Albuquerque, NM
- Baltimore, MD
- Charlotte, NC
- Chicago, IL
- Cincinnati, OH
- Dallas, TX
- Fort Worth, TX
- Houston, TX
- Indianapolis, IN
- Jacksonville, FL
- Kansas City, MO
- Long Beach, CA
- Los Angeles, CA
- Louisville, KY
- Miami, FL
- Milwaukee, WI
- Minneapolis, MN
- New York City, NY
- Philadelphia, PA
- Phoenix, AZ
- Pittsburgh, PA
- Sacramento, CA
- San Antonio, TX
- San Diego, CA
- San Francisco, CA
- San Jose, CA
- Seattle, WA
- St. Louis, MO
- Tucson, AZ
Related: All cities · Research: fees compared across 30 cities · Portland permit guide