City fee lines from the Raleigh permit pages, computed for your project. Sourced, verified Nov 2026.
Verified Nov 2026Calculator
This calculator applies the fee lines quoted on the Raleigh permit pages: the city's own plan review, permit and surcharge figures, as published by the Planning and Development Department. Pick a project, change the inputs, and the breakdown shows each line and how it is computed. 10 of 10 project types have a computable formula on their page; the rest show the page's own figure.
Raleigh prices on its FY27 Development Fee Guide (July 1, 2026 to June 30, 2027): a $124 minimum per fee and a $124 minimum per trade and a 4% technology fee on the fees; the pages round each fee to the dollar, the calculator does not, so totals can differ by a dollar or two.
Plan review follows the city's own fee calculator (57% new, 55% alteration, no minimum); the guide's minimum-fee line would charge $124 instead, which the pages give as the alternative. The portal invoice is final.
Raleigh shed permit fee
Every Raleigh shed needs a permit: under 12 ft in length, width and height it is the residential zoning permit (about $271); over 12 ft in any direction it is a building permit at 0.38% of a value of $62.26 per sq ft (ICC type VB utility building, reduced 12.4%), $124 minimum, plus plan review and the 4% technology fee.
City calculated value: 192 sq ft × $62.26 = $11,953.92
$202.47estimated city fees at the inputs above
Line
How it is computed
Amount
Building permit (0.38% of calculated value, $124 minimum)
0.38% of $11,953.92 (minimum $124)
$124
Plan review (57% of building, city calculator)
57% of $124
$70.68
Technology fee (4%)
4% of $194.68
$7.79
The page's own example: “$71, or $74 with the fee, for a total of $203”
Not included: On the building-permit path a residential zoning permit ($271) may also apply (ask at intake), and the guide's minimum-fee line would raise plan review to $124 ($258 total for a 12 x 16 shed); a Minor Work COA ($48) in a historic district.
Source: Raleigh FY27 Development Fee Guide (July 1, 2026 to June 30, 2027). Read the Raleigh shed permit page, which quotes the rule and records when it was last verified (Nov 2026).
Raleigh fence permit fee
Every new, moved or half-replaced fence needs a zoning permit, which should bill under the guide's residential zoning permit fee of $261 plus the 4% technology fee, about $271; there is no per-foot charge.
$271.44estimated city fees at the inputs above
Line
How it is computed
Amount
Residential zoning permit
flat
$261
Technology fee (4%)
4% of $261
$10.44
The page's own example: “About $271. The guide has no fence line”
Not included: A $127 re-inspection if the fence fails inspection; a Minor Work COA ($48) in a historic district if the commission classes it so.
Source: Raleigh FY27 Development Fee Guide (July 1, 2026 to June 30, 2027). Read the Raleigh fence permit page, which quotes the rule and records when it was last verified (Nov 2026).
Raleigh deck permit fee
Every new or reframed deck needs a building permit: the $124 minimum, plan review at 57% of it in the city calculator and the 4% technology fee make a $203 floor; larger decks pay 0.38% of a calculated value, but the guide's square-foot table has no deck category, so the portal invoice is final.
$202.47estimated city fees at the inputs above
Line
How it is computed
Amount
Building permit ($124 minimum)
flat
$124
Plan review (57% of building, city calculator)
57% of $124
$70.68
Technology fee (4%)
4% of $194.68
$7.79
The page's own example: “$71 or $74 with the fee, so the floor is $203”
Not included: The guide's minimum-fee line would raise plan review to $124 ($258 floor); a deck valued above the minimum pays more on the 0.38% rate, which the page cannot compute without a deck valuation; a Minor Work COA ($48) in a historic district.
Source: Raleigh FY27 Development Fee Guide (July 1, 2026 to June 30, 2027). Read the Raleigh deck permit page, which quotes the rule and records when it was last verified (Nov 2026).
Raleigh pool permit fee
A pool, spa or hot tub holding more than 24 inches of water needs building and electrical permits; the guide has no residential pool line, so the page reads both at the $124 minimum per trade, plus plan review at 57% of the building fee and the 4% technology fee, about $332.
$331.43estimated city fees at the inputs above
Line
How it is computed
Amount
Building permit ($124 minimum)
flat
$124
Electrical permit ($124 minimum)
flat
$124
Plan review (57% of building, city calculator)
57% of $124
$70.68
Technology fee (4%)
4% of $318.68
$12.75
The page's own example: “Building $129 + electrical $129 + plan review $74 = $332”
Not included: The guide's minimum-fee line would raise plan review to $124 (adding $55); $127 per trade for a re-inspection; the guide's $534 commercial pool line does not apply to a residential pool.
Source: Raleigh FY27 Development Fee Guide (July 1, 2026 to June 30, 2027). Read the Raleigh pool permit page, which quotes the rule and records when it was last verified (Nov 2026).
Raleigh roof replacement permit fee
Replacing the roof covering on a single-family house for $40,000 or less needs no permit; above that a reroof is a Level 1 alteration at 25% of the calculated building fee but never less than the $124 minimum, which is where most roof permits land ($129 with the 4% technology fee), plus plan review if the city reviews plans.
Exempt: No permit for replacing the roofing on a single-family house when the whole job costs $40,000 or less (G.S. 160D-1110(c)), unless it touches load-bearing framing, adds roofing where none existed, or touches electrical, HVAC or plumbing.
$128.96estimated city fees at the inputs above
Line
How it is computed
Amount
Building permit, Level 1 alteration (at the $124 minimum)
flat
$124
Technology fee (4%)
4% of $124
$4.96
The page's own example: “With the 4% technology fee that is $129 for most jobs”
Not included: Plan review at the guide's $124 minimum instead of the calculator rate ($129 with the fee); larger repairs the reviewer classes as Level 2 (50%) or Level 3 (75%); separate electrical or mechanical permits; a Minor Work COA ($48) in a historic district.
Source: Raleigh FY27 Development Fee Guide (July 1, 2026 to June 30, 2027). Read the Raleigh roof replacement permit page, which quotes the rule and records when it was last verified (Nov 2026).
Raleigh bathroom remodel permit fee
A reconfigured bathroom is a Level 2 alteration at 50% of a 0.38% building fee on the declared cost, with a $124 minimum that any value under about $65,000 falls to, plus plan review at 55% in the city calculator, a $124 minimum trade permit for each trade and the 4% technology fee; same-spot swaps and cosmetic work costing $40,000 or less on a single-family home need no permit.
$457.81estimated city fees at the inputs above
Line
How it is computed
Amount
Building permit, Level 2 alteration (50% of 0.38% of value, $124 minimum) optional
0.19% of $25,000 (minimum $124)
$124
Plan review (55% of building, city calculator) optional
55% of $124
$68.20
Plumbing permit ($124 minimum) optional
flat
$124
Electrical permit ($124 minimum) optional
flat
$124
Technology fee (4%)
4% of $440.20
$17.61
The page's own example: “Add plan review $71, plumbing $129 and electrical $129 for $458.”
Not included: The guide's minimum-fee line would make plan review $124 ($129 with the fee) instead of the calculator's 55%; a drain move with no other work is a single plumbing permit at $129 (switch off the building lines); an administrative fee equal to the permit fee for work started without one.
Source: Raleigh FY27 Development Fee Guide (July 1, 2026 to June 30, 2027). Read the Raleigh bathroom remodel permit page, which quotes the rule and records when it was last verified (Nov 2026).
Raleigh kitchen remodel permit fee
A reconfigured kitchen is a Level 2 alteration at 50% of a 0.38% building fee on the declared cost, with a $124 minimum that any value under about $65,000 falls to, plus plan review at 55% in the city calculator, a $124 minimum trade permit for each trade and the 4% technology fee; same-spot swaps and cosmetic work costing $40,000 or less on a single-family home need no permit.
$457.81estimated city fees at the inputs above
Line
How it is computed
Amount
Building permit, Level 2 alteration (50% of 0.38% of value, $124 minimum)
0.19% of $50,000 (minimum $124)
$124
Plan review (55% of building, city calculator)
55% of $124
$68.20
Electrical permit ($124 minimum) optional
flat
$124
Plumbing permit ($124 minimum) optional
flat
$124
Technology fee (4%)
4% of $440.20
$17.61
The page's own example: “Add plan review $71, electrical $129 and plumbing $129 for $458.”
Not included: The guide's minimum-fee line would make plan review $124 ($129 with the fee) instead of the calculator's 55%; a mechanical or gas permit at the same minimum; plumbing alone with no building scope is a single $129 trade permit.
Source: Raleigh FY27 Development Fee Guide (July 1, 2026 to June 30, 2027). Read the Raleigh kitchen remodel permit page, which quotes the rule and records when it was last verified (Nov 2026).
Raleigh electrical panel permit fee
Every panel replacement or service upgrade needs a residential Electrical Work permit; the guide has no residential panel line and charges unlisted work at the $124 minimum per trade, $129 with the 4% technology fee.
$128.96estimated city fees at the inputs above
Line
How it is computed
Amount
Electrical permit ($124 minimum)
flat
$124
Technology fee (4%)
4% of $124
$4.96
The page's own example: “With the city's 4% technology fee that is $129, the amount a residential panel or service change should be billed.”
Not included: Re-inspections at $127 each; the guide's $198 service repair or replacement line is commercial.
Source: Raleigh FY27 Development Fee Guide (July 1, 2026 to June 30, 2027). Read the Raleigh electrical panel permit page, which quotes the rule and records when it was last verified (Nov 2026).
Raleigh hvac permit fee
Every furnace, AC or heat pump replacement needs a permit: a like-for-like changeout is one permit covering mechanical and electrical, billed at the $124 minimum plus the 4% technology fee ($129); a new install or bigger unit adds an electrical permit, about $258.
$128.96estimated city fees at the inputs above
Line
How it is computed
Amount
HVAC changeout or mechanical permit ($124 minimum)
flat
$124
Technology fee (4%)
4% of $124
$4.96
The page's own example: “With the 4% technology fee, a residential changeout should be billed $129.”
Not included: A failed or not-ready inspection costs $127 per trade to repeat; ductwork-only multi-trade (MEP) permits and water heater changeouts are separate filings.
Source: Raleigh FY27 Development Fee Guide (July 1, 2026 to June 30, 2027). Read the Raleigh hvac permit page, which quotes the rule and records when it was last verified (Nov 2026).
Raleigh adu permit fee
A detached ADU is billed as a new single-family dwelling: building permit 0.38% of $154.11 per sq ft (ICC type VB, reduced 12.4%), electrical 49%, mechanical 28%, plumbing 34% and plan review 57% of it, each with a $124 minimum, then a 4% technology fee: about $1,010 for 600 sq ft and $1,305 for 800 sq ft.
City calculated value: 600 sq ft × $154.11 = $92,466
$1,010.69estimated city fees at the inputs above
Line
How it is computed
Amount
Building permit (0.38% of calculated value, $124 minimum)
0.38% of $92,466
$351.37
Electrical (49% of building, $124 minimum)
49% of $351.37
$172.17
Mechanical (28% of building, $124 minimum)
28% of $351.37 (minimum $124)
$124
Plumbing (34% of building, $124 minimum)
34% of $351.37 (minimum $124)
$124
Plan review (57% of building, $124 minimum)
57% of $351.37
$200.28
Technology fee (4%)
4% of $971.82
$38.87
The page's own example: “Building $351, electrical $172, mechanical $124 (minimum), plumbing $124 (minimum), plan review $200 = $971, plus 4% = about $1,010.”
Not included: The water meter itself and the guide's per-unit facility fees for new dwellings (not priced on the page); attached ADUs (addition process) and conversions (ADU change of use) are not priced; designer fees.
Source: Raleigh FY27 Development Fee Guide (July 1, 2026 to June 30, 2027). Read the Raleigh adu permit page, which quotes the rule and records when it was last verified (Nov 2026).
What the estimate covers
City fees only, on the ordinary residential path each page prices: the building or trade permit plus the mandatory lines the city adds to it. It leaves out whatever the page says is separate (a designer's fee, a contractor's licence, a utility connection) and anything the page does not price. Fee schedules change on the city's budget cycle; the month each page was last verified is Nov 2026, and the verification method explains how changes are caught.
Frequently asked questions
$71, or $74 with the fee, for a total of $203. Every Raleigh shed needs a permit: under 12 ft in length, width and height it is the residential zoning permit (about $271); over 12 ft in any direction it is a building permit at 0.38% of a value of $62.26 per sq ft (ICC type VB utility building, reduced 12.4%), $124 minimum, plus plan review and the 4% technology fee.
About $271. The guide has no fence line. Every new, moved or half-replaced fence needs a zoning permit, which should bill under the guide's residential zoning permit fee of $261 plus the 4% technology fee, about $271; there is no per-foot charge.
$71 or $74 with the fee, so the floor is $203. Every new or reframed deck needs a building permit: the $124 minimum, plan review at 57% of it in the city calculator and the 4% technology fee make a $203 floor; larger decks pay 0.38% of a calculated value, but the guide's square-foot table has no deck category, so the portal invoice is final.
Building $129 + electrical $129 + plan review $74 = $332. A pool, spa or hot tub holding more than 24 inches of water needs building and electrical permits; the guide has no residential pool line, so the page reads both at the $124 minimum per trade, plus plan review at 57% of the building fee and the 4% technology fee, about $332.
With the 4% technology fee that is $129 for most jobs. Replacing the roof covering on a single-family house for $40,000 or less needs no permit; above that a reroof is a Level 1 alteration at 25% of the calculated building fee but never less than the $124 minimum, which is where most roof permits land ($129 with the 4% technology fee), plus plan review if the city reviews plans.
Every line is read off the Raleigh permit pages on this site, which quote the city's own fee schedule, bulletin or ordinance and record the month the sources were last verified (Nov 2026). The calculator holds no fee of its own.