This calculator applies the fee lines quoted on the Miami permit pages: the city's own plan review, permit and surcharge figures, as published by the City of Miami Building Dept.. Pick a project, change the inputs, and the breakdown shows each line and how it is computed. 10 of 10 project types have a computable formula on their page; the rest show the page's own figure.

  • Every residential permit, master or trade, is 0.5% of its scope's estimated cost with a $110 minimum (a flat $45 under $2,500), plus a $40 application fee and state surcharges of 1% and 1.5% (at least $2 each).
  • Master permits pay the solid waste surcharge ($0.22 per $100, $26 minimum, $600 maximum); trade permits, roofing and sheds do not.
  • The up-front fee of $2.80 per $1,000 collected at filing is 80% credited to the permit fee, and a Miami-Dade County code-compliance surcharge of unstated rate applies; neither is modeled.

What the estimate covers

City fees only, on the ordinary residential path each page prices: the building or trade permit plus the mandatory lines the city adds to it. It leaves out whatever the page says is separate (a designer's fee, a contractor's licence, a utility connection) and anything the page does not price. Fee schedules change on the city's budget cycle; the month each page was last verified is Oct 2026, and the verification method explains how changes are caught.

Frequently asked questions

0.5 percent is $30, so the $110 minimum applies; add $40 application and $4 in state surcharges for $154 before the county surcharge.. Every shed needs a building permit at 0.5% of cost with a $110 minimum, plus the $40 application fee and two state surcharges; sheds skip the solid waste surcharge.
with $40 application, the $26 minimum solid waste surcharge and $4 in state surcharges the city bill is about $180. Every fence needs a building permit at 0.5% of cost with a $110 minimum, plus the $40 application fee, the solid waste surcharge and two state surcharges.
with $40 application, $26.40 solid waste and $4 state surcharges the total is about $180.40. Every deck needs a building permit at 0.5% of cost with a $110 minimum, plus the $40 application fee, the solid waste surcharge and two state surcharges.
the electrical and plumbing trade permits each pay the $110 minimum + $40 + $4 = $154; total about $787.50. An in-ground pool is a master building permit at 0.5% of cost (with the solid waste and state surcharges) plus electrical and plumbing trade permits at $154 each at the minimum.
0.5 percent is $100, so the $110 minimum applies; with $40 application and $4 in state surcharges the city bill is about $154. A reroof is a permit at 0.5% of cost with a $110 minimum plus the $40 application fee and two state surcharges; roofing is exempt from the solid waste surcharge.
Every line is read off the Miami permit pages on this site, which quote the city's own fee schedule, bulletin or ordinance and record the month the sources were last verified (Oct 2026). The calculator holds no fee of its own.