City fee lines from the St. Paul permit pages, computed for your project. Sourced, verified Nov 2026.
Verified Nov 2026Calculator
This calculator applies the fee lines quoted on the St. Paul permit pages: the city's own plan review, permit and surcharge figures, as published by the Saint Paul Department of Safety and Inspections. Pick a project, change the inputs, and the breakdown shows each line and how it is computed. 10 of 10 project types have a computable formula on their page; the rest show the page's own figure.
General building permits are priced on the job's value under Table A of Legislative Code Section 33.04 (DSI's posted schedule is dated February 25, 2023): the pages print $106 for the first $2,000 plus $21 per additional $1,000 up to $25,000, and $1,499 for the first $100,000 plus $8 per additional $1,000; the $25,000 to $100,000 rows and the rows under $2,000 are not printed, so the calculator does not price those values.
A plan review fee of 65 percent of the permit fee applies to every valuation over $1,000 (not to Contractor Express reroofs, which are not plan-reviewed), and the Minnesota state surcharge is 0.0005 times the value; plumbing, gas and electrical permits add a $1 state surcharge.
Ten percent of the estimated plan review fee, at least $85 and at most $5,000, must be paid before review begins; the ordinance does not say how it is credited, so the calculator shows the schedule's figures without it.
Starting work before the permit adds a penalty equal to the permit fee; apply and pay in PAULIE (card payments carry a 2.49% service fee).
St. Paul shed permit fee
A detached shed over 200 sq ft pays the Table A valuation fee plus 65 percent plan review and the 0.0005 state surcharge; one-story sheds of 200 sq ft or less need no building permit.
Exempt: No building permit for a one-story detached tool or storage shed, playhouse or similar building of 200 sq ft or less; zoning setbacks and lot coverage still apply, and heritage district sheds need HPC approval.
$316.50estimated city fees at the inputs above
Line
How it is computed
Amount
Permit fee (Table A)
$106 + 4 × $21 per 1,000 above 2,000
$190
Plan review (65% of permit fee)
65% of $190
$123.50
State surcharge (0.0005 x value)
6,000 $ × $0
$3
The page's own example: “Example: a 240 square foot shed valued at $6,000 costs $190 for the permit, $123.50 for plan review and $3.00 surcharge, $316.50 in all.”
Not included: The 10 percent plan review payment due before review (credit unstated); the penalty equal to the permit fee for starting early.
Source: Legislative Code Section 33.04, Table A (DSI schedule dated February 25, 2023). Read the St. Paul shed permit page, which quotes the rule and records when it was last verified (Nov 2026).
St. Paul fence permit fee
Every fence goes through DSI's fence plan review: $45 for the first 200 lineal feet plus $15 for each additional 100 lineal feet or fraction, and $85 for each height or corner variance.
$60estimated city fees at the inputs above
Line
How it is computed
Amount
Fence plan review, first 200 lineal ft
flat
$45
Each additional 100 lineal ft or fraction
1 × $15 per 100 linear ft or fraction (first 200 linear ft free)
$15
The page's own example: “A 280-foot fence costs $45 + $15 = $60.”
Not included: A surveyor (optional under seven feet); whether the 10 percent up-front plan review payment reaches a fence review is unstated.
Source: Legislative Code Section 33.04, fence plan review. Read the St. Paul fence permit page, which quotes the rule and records when it was last verified (Nov 2026).
St. Paul deck permit fee
A deck needs a building permit unless it is freestanding, 30 inches or less above grade and not a door landing; the fee is the Table A valuation fee plus 65 percent plan review and the 0.0005 state surcharge.
$386.80estimated city fees at the inputs above
Line
How it is computed
Amount
Permit fee (Table A)
$106 + 6 × $21 per 1,000 above 2,000
$232
Plan review (65% of permit fee)
65% of $232
$150.80
State surcharge (0.0005 x value)
8,000 $ × $0
$4
The page's own example: “An $8,000 deck: $232 + $150.80 + $4.00 = $386.80.”
Not included: No permit for a deck not more than 30 inches above grade, not attached to a structure with frost footings and not a landing at an exterior door (zoning still applies above 24 inches); the 10 percent plan review payment before review; the penalty equal to the permit fee.
Source: Legislative Code Section 33.04, Table A (DSI schedule dated February 25, 2023). Read the St. Paul deck permit page, which quotes the rule and records when it was last verified (Nov 2026).
St. Paul pool permit fee
A pool over 5,000 gallons (or any pool deeper than 24 inches or in the ground) pays the Table A valuation fee plus 65 percent plan review and the 0.0005 state surcharge, plus the pool fence review and the electrical permit; the page's $40,000 in-ground pool ($1,366.40) falls in Table A rows the pages do not print, so the calculator stops at $25,000.
$211.05estimated city fees at the inputs above
Line
How it is computed
Amount
Permit fee (Table A)
$106 + 1 × $21 per 1,000 above 2,000
$127
Plan review (65% of permit fee)
65% of $127
$82.55
State surcharge (0.0005 x value)
3,000 $ × $0
$1.50
The page's own example: “A $3,000 above-ground pool over 5,000 gallons: $127 + $82.55 + $1.50 = $211.05.”
Not included: No building permit for a prefabricated pool 24 inches or less deep, 5,000 gallons or less and entirely above ground; the grading permit for an in-ground pool (from $39 for the first 100 cubic yards); the electrical circuit charge; the 10 percent plan review payment.
Source: Legislative Code Section 33.04, Table A (DSI schedule dated February 25, 2023). Read the St. Paul pool permit page, which quotes the rule and records when it was last verified (Nov 2026).
St. Paul roof replacement permit fee
A contractor's Contractor Express reroof permit pays the Table A valuation fee plus the 0.0005 state surcharge, with no plan review; an owner's plan-reviewed general permit may add 65 percent plan review.
$279estimated city fees at the inputs above
Line
How it is computed
Amount
Permit fee (Table A)
$106 + 8 × $21 per 1,000 above 2,000
$274
State surcharge (0.0005 x value)
10,000 $ × $0
$5
The page's own example: “A $10,000 tear-off: $274 + $5.00 = $279.”
Not included: On a plan-reviewed owner permit, the 10 percent plan review payment before review; the penalty equal to the permit fee for starting early.
Source: Legislative Code Section 33.04, Table A (DSI schedule dated February 25, 2023). Read the St. Paul roof replacement permit page, which quotes the rule and records when it was last verified (Nov 2026).
St. Paul bathroom remodel permit fee
Fixture work takes a plumbing permit at $92 plus $36 per fixture ($6 per water supply fixture), circuits an electrical permit at $15 each with an $85 minimum, and wall or layout changes over $500 a Table A building permit with 65 percent plan review and the 0.0005 surcharge.
$128estimated city fees at the inputs above
Line
How it is computed
Amount
Plumbing permit ($92 + $36 per fixture) optional
$92 + 1 × $36 per 1 above 0
$128
The page's own example: “One toilet starts at $92 + $36 = $128”
Not included: The ventilation permit for exhaust ductwork (1 percent of the duct work's value, $85 minimum per dwelling unit), which needs that work's own value; finish work needs no permit.
Source: Legislative Code Section 33.04 (plumbing, electrical and Table A). Read the St. Paul bathroom remodel permit page, which quotes the rule and records when it was last verified (Nov 2026).
St. Paul kitchen remodel permit fee
Alterations over $500 beyond finish work pay the Table A valuation fee plus 65 percent plan review and the 0.0005 state surcharge, and each trade adds its own flat permit: plumbing $92 plus $36 per fixture, electrical $15 per circuit ($85 minimum), gas $85.
$457.10estimated city fees at the inputs above
Line
How it is computed
Amount
Permit fee (Table A)
$106 + 8 × $21 per 1,000 above 2,000
$274
Plan review (65% of permit fee)
65% of $274
$178.10
State surcharge (0.0005 x value)
10,000 $ × $0
$5
The page's own example: “A $10,000 remodel: $274 + $178.10 + $5.00 = $457.10.”
Not included: A ventilation permit for a range hood duct, if DSI treats it as exhaust ductwork (1 percent of the duct's value, $85 minimum); $34 for each additional gas appliance; the 10 percent plan review payment.
Source: Legislative Code Section 33.04 (Table A and trade fees). Read the St. Paul kitchen remodel permit page, which quotes the rule and records when it was last verified (Nov 2026).
St. Paul electrical panel permit fee
Every panel replacement or service upgrade takes a city electrical service permit: $85 for the service, which covers reconnected existing circuits, plus $15 for each additional or modified circuit or feeder and the state surcharge ($1 minimum).
$86estimated city fees at the inputs above
Line
How it is computed
Amount
Electrical service permit
flat
$85
Additional or modified circuits
0 circuits × $15
$0
State surcharge (DSI lists a $1 minimum)
flat
$1
The page's own example: “A straight panel swap: $85 + $1 = $86.”
Not included: Xcel Energy's disconnect and reconnect; the doubled fee if work starts before the permit. The surcharge above the $1 minimum on larger permits is not printed.
Source: Legislative Code Section 33.04, electrical service permit. Read the St. Paul electrical panel permit page, which quotes the rule and records when it was last verified (Nov 2026).
St. Paul hvac permit fee
A gas furnace swap takes warm air, gas burner and electrical permits at $85 each for the first 100,000 BTU (about $255), and central air takes a refrigeration permit at 1 percent of value ($85 minimum) plus electrical, from about $170.
$255estimated city fees at the inputs above
Line
How it is computed
Amount
Warm air heating permit optional
$85
$85
Gas burner permit optional
$85
$85
Electrical permit ($15 per unit, $85 minimum)
1 circuits × $15 (minimum $85)
$85
The page's own example: “A typical gas furnace replacement under 100,000 BTU input: warm air $85 + gas burner $85 + electrical $85 = $255 before surcharges.”
Not included: The warm air surcharge on job value ($0.50 up to $1,000, then 0.0005 times the cost); a ventilation permit for new ductwork (1 percent of value, $85 minimum). For central air, untick warm air and gas burner and tick refrigeration: $170 at $6,000 assumes no warm air permit; if DSI says your AC install needs one, leave Warm air heating ticked (+$85 or more). DSI's refrigeration fee page still shows a $70 minimum; the code in force, which the page follows, says $85.
Source: Legislative Code Section 33.04 (warm air, gas burner, refrigeration, electrical). Read the St. Paul hvac permit page, which quotes the rule and records when it was last verified (Nov 2026).
St. Paul adu permit fee
An ADU's building permit follows Table A ($1,499 for the first $100,000 plus $8 per additional $1,000) plus 65 percent plan review and the 0.0005 state surcharge; SAC, its admin fee and parkland dedication are due at issuance.
$3,208.35estimated city fees at the inputs above
Line
How it is computed
Amount
Permit fee (Table A)
$1,499 + 50 × $8 per 1,000 above 100,000
$1,899
Plan review (65% of permit fee)
65% of $1,899
$1,234.35
State surcharge (0.0005 x value)
150,000 $ × $0
$75
The page's own example: “A $150,000 ADU: $1,899 + $1,234.35 + $75 = $3,208.35.”
Not included: Trade permits (plumbing, electrical, mechanical) and a plumbing permit for separate utilities; whether a second ADU pays a second SAC unit is unstated; the 10 percent plan review payment before review.
Source: Legislative Code Section 33.04, Table A (DSI schedule dated February 25, 2023). Read the St. Paul adu permit page, which quotes the rule and records when it was last verified (Nov 2026).
What the estimate covers
City fees only, on the ordinary residential path each page prices: the building or trade permit plus the mandatory lines the city adds to it. It leaves out whatever the page says is separate (a designer's fee, a contractor's licence, a utility connection) and anything the page does not price. Fee schedules change on the city's budget cycle; the month each page was last verified is Nov 2026, and the verification method explains how changes are caught.
Frequently asked questions
Example: a 240 square foot shed valued at $6,000 costs $190 for the permit, $123.50 for plan review and $3.00 surcharge, $316.50 in all.. A detached shed over 200 sq ft pays the Table A valuation fee plus 65 percent plan review and the 0.0005 state surcharge; one-story sheds of 200 sq ft or less need no building permit.
A 280-foot fence costs $45 + $15 = $60.. Every fence goes through DSI's fence plan review: $45 for the first 200 lineal feet plus $15 for each additional 100 lineal feet or fraction, and $85 for each height or corner variance.
An $8,000 deck: $232 + $150.80 + $4.00 = $386.80.. A deck needs a building permit unless it is freestanding, 30 inches or less above grade and not a door landing; the fee is the Table A valuation fee plus 65 percent plan review and the 0.0005 state surcharge.
A $3,000 above-ground pool over 5,000 gallons: $127 + $82.55 + $1.50 = $211.05.. A pool over 5,000 gallons (or any pool deeper than 24 inches or in the ground) pays the Table A valuation fee plus 65 percent plan review and the 0.0005 state surcharge, plus the pool fence review and the electrical permit; the page's $40,000 in-ground pool ($1,366.40) falls in Table A rows the pages do not print, so the calculator stops at $25,000.
A $10,000 tear-off: $274 + $5.00 = $279.. A contractor's Contractor Express reroof permit pays the Table A valuation fee plus the 0.0005 state surcharge, with no plan review; an owner's plan-reviewed general permit may add 65 percent plan review.
Every line is read off the St. Paul permit pages on this site, which quote the city's own fee schedule, bulletin or ordinance and record the month the sources were last verified (Nov 2026). The calculator holds no fee of its own.