City fee lines from the Cincinnati permit pages, computed for your project. Sourced, verified Sep 2026.
Verified Sep 2026Calculator
This calculator applies the fee lines quoted on the Cincinnati permit pages: the city's own plan review, permit and surcharge figures, as published by the Buildings and Inspections. Pick a project, change the inputs, and the breakdown shows each line and how it is computed. 8 of 10 project types have a computable formula on their page; the rest show the page's own figure.
City fees carry five surcharges (3% technology, 1% training, 1% financial recovery, 5% planning, 1% state), 11% in all; IBI electrical fees are IBI's own and carry no city surcharge in the pages' sums.
Building permits under $50,000 of value follow a valuation table (value rounded up to the next $1,000) that the pages quote only at listed points; it is contiguous only up to $6,000, so valuation-priced models stop there and larger jobs are given as examples.
Cincinnati shed permit fee
A shed over 100 sq ft pays the valuation-based building permit ($173 up to $4,000), the $49 processing fee and five surcharges; sheds up to 100 sq ft need only a $158.55 zoning certificate.
Exempt: No building permit for a rear-yard storage shed of 100 sq ft or less and no taller than 8 ft (CBC 1101-17.1(12)); a Zoning Certificate of Compliance ($158.55) is still required.
$246.42estimated city fees at the inputs above
Line
How it is computed
Amount
Building permit (valuation schedule)
$173
$173
Processing fee
flat
$49
Five surcharges (11%)
11% of $222
$24.42
The page's own example: “a $3,500 kit shed rounds up to $4,000, so the permit is $173 + $49 = $222, plus about $24 in surcharges, roughly $246”
Not included: Contractor registration ($131.25); sheds valued over $6,000 (the page lists $281 at $8,000 but not the steps between).
Source: Cincinnati building permit fee schedule effective July 1, 2026. Read the Cincinnati shed permit page, which quotes the rule and records when it was last verified (Sep 2026).
Cincinnati fence permit fee
A residential fence up to 6 ft needs no building permit, only a Zoning Certificate of Compliance at $158.55 all-in.
$158.55estimated city fees at the inputs above
Line
How it is computed
Amount
Zoning Certificate of Compliance (with surcharges)
flat
$158.55
The page's own example: “6 ft privacy fence in a rear or interior side yard | Zoning COC, $158.55”
Not included: Fences over 6 ft need a zoning variance (fee not given) plus a valuation-based building permit from $173 + $49; contractor registration.
Source: Zoning Certificate of Compliance, fee schedule effective July 1, 2026 and the department's fence handout. Read the Cincinnati fence permit page, which quotes the rule and records when it was last verified (Sep 2026).
Cincinnati deck permit fee
Deck permits are priced from the job value on the building permit table, plus the $49 processing fee and about 11% in surcharges.
What the city page states: Worked examples: a $5,000 deck is $203 + $49 = $252, plus about $28 in surcharges, roughly $280.
Not computed here: The page lists the table only at set values ($173 up to $4,000, $203, $281, $336, $380, $442, $550 up to $20,000) without the steps between, so the fee cannot be computed for an arbitrary deck value.
A pool needs a valuation-based building permit plus the $49 processing fee and surcharges, a $130 IBI electrical permit, and a plumbing permit for new piping.
What the city page states: Worked examples: a $3,000 above-ground pool is $173 + $49 = $222, plus about $24 in surcharges, roughly $246, plus IBI $130, about $376.
Not computed here: Below $50,000 the building permit table is quoted only at listed values ($173 to $4,000, $281, $442, $737, $1,065); above $50,000 the page's own arithmetic jumps discontinuously, so no single formula covers an ordinary pool.
Replacing roof coverings on a one- to three-family home needs no permit when no more than two layers remain; structural repairs pay the permits-without-plans valuation fee, the $49 processing fee and five surcharges.
$172.05estimated city fees at the inputs above
Line
How it is computed
Amount
Repair permit (permits-without-plans column)
$106
$106
Processing fee
flat
$49
Five surcharges (11%)
11% of $155
$17.05
The page's own example: “A $6,000 rafter and decking repair is $232 + $49 = $281, plus about $31, roughly $312.”
Not included: A covering-only re-roof (two layers or fewer) is $0; historic properties need a Certificate of Appropriateness ($151 plus surcharges); contractor registration.
Source: Building permit fee schedule effective July 1, 2026, permits-without-plans column. Read the Cincinnati roof replacement permit page, which quotes the rule and records when it was last verified (Sep 2026).
Cincinnati bathroom remodel permit fee
Plumbing fixtures take a plumbing permit at $68 (replaced in place) or $97 (new or relocated) for the first fixture and $33 for each additional one, plus five surcharges; an IBI permit covers new wiring.
$148.74estimated city fees at the inputs above
Line
How it is computed
Amount
Plumbing permit, first fixture (replacement)
flat
$68
Each additional fixture
2 fixtures × $33 (first 1 fixtures free)
$66
Five surcharges (11%)
11% of $134
$14.74
The page's own example: “replacing the toilet, lavatory and tub in place is three replacement fixtures, $134, about $149 with surcharges”
Not included: A building permit when walls move or fixtures are relocated (valuation-based from $173 + $49); finish work needs no permit.
Plumbing fixtures take a plumbing permit at $68 (replaced in place) or $97 (new or relocated) for the first fixture and $33 for each additional one, plus five surcharges; an IBI permit covers new wiring.
$148.74estimated city fees at the inputs above
Line
How it is computed
Amount
Plumbing permit, first fixture (replacement)
flat
$68
Each additional fixture
2 fixtures × $33 (first 1 fixtures free)
$66
Five surcharges (11%)
11% of $134
$14.74
The page's own example: “swapping the sink, dishwasher and disposal in place is a three-fixture replacement, $134 plus about $15 in surcharges, roughly $149”
Not included: A building permit for wall or layout changes (valuation-based from $173 + $49); cabinets, counters and finishes need no permit.
A panel or service change is an IBI permit: $60 processing plus $40 for the service entrance ($85 with added wiring at a single-family house), and $30 for each additional dwelling unit.
$100estimated city fees at the inputs above
Line
How it is computed
Amount
IBI processing and certificate fee
flat
$60
Service entrance only, first dwelling unit
flat
$40
Each additional dwelling unit
0 units × $30 (first 1 units free)
$0
The page's own example: “Like-for-like panel replacement, same service size | IBI permit, $100 ($101 pre-calculated)”
Not included: The electrician's labor; the double fee if work starts before the permit; $40 re-inspections.
Source: Inspection Bureau, Inc. (IBI) fee schedule effective January 1, 2025. Read the Cincinnati electrical panel permit page, which quotes the rule and records when it was last verified (Sep 2026).
Cincinnati hvac permit fee
Replacing furnaces or AC in a one- to three-family home is a flat $118 for the first unit and $48 for each additional unit, plus five surcharges and no processing fee.
$130.98estimated city fees at the inputs above
Line
How it is computed
Amount
HVAC replacement, first unit
flat
$118
Each additional unit
0 units × $48 (first 1 units free)
$0
Five surcharges (11%)
11% of $118
$12.98
The page's own example: “so a furnace alone is $118 plus about $13, roughly $131”
Not included: New installations priced by valuation ($249 at $5,000, $450 at $10,000, plus $49 processing); contractor registration.
Source: Cincinnati fee schedule effective July 1, 2026, HVAC replacement line. Read the Cincinnati hvac permit page, which quotes the rule and records when it was last verified (Sep 2026).
Cincinnati adu permit fee
An ADU over $50,000 of work pays $1,065 plus $11.59 per $1,000 of valuation, the $49 processing fee and surcharges, plus HVAC, plumbing and IBI electrical permits and a $65 certificate of occupancy.
$2,938.05estimated city fees at the inputs above
Line
How it is computed
Amount
Building permit base
flat
$1,065
Building permit per $1,000 of valuation
60 × $11.59 per 1,000 $ or fraction
$695.40
Building processing fee
flat
$49
HVAC permit (new installation, $8,000) optional
flat
$369
HVAC processing fee optional
flat
$49
Plumbing permit (five new fixtures) optional
flat
$229
Five surcharges (11%)
11% of $2,456.40
$270.20
IBI electrical permit (new unit) optional
flat
$146.45
Certificate of occupancy
flat
$65
The page's own example: “add HVAC ($369 + $49, about $464), five plumbing fixtures ($229, about $254), IBI $146.45 and the $65 certificate: roughly $2,937”
Not included: Zoning registration, the recorded covenant and the new address are separate steps; contractor registration ($131.25) and design fees.
Source: Cincinnati building permit fee schedule effective July 1, 2026. Read the Cincinnati adu permit page, which quotes the rule and records when it was last verified (Sep 2026).
What the estimate covers
City fees only, on the ordinary residential path each page prices: the building or trade permit plus the mandatory lines the city adds to it. It leaves out whatever the page says is separate (a designer's fee, a contractor's licence, a utility connection) and anything the page does not price. Fee schedules change on the city's budget cycle; the month each page was last verified is Sep 2026, and the verification method explains how changes are caught.
Frequently asked questions
a $3,500 kit shed rounds up to $4,000, so the permit is $173 + $49 = $222, plus about $24 in surcharges, roughly $246. A shed over 100 sq ft pays the valuation-based building permit ($173 up to $4,000), the $49 processing fee and five surcharges; sheds up to 100 sq ft need only a $158.55 zoning certificate.
6 ft privacy fence in a rear or interior side yard | Zoning COC, $158.55. A residential fence up to 6 ft needs no building permit, only a Zoning Certificate of Compliance at $158.55 all-in.
Worked examples: a $5,000 deck is $203 + $49 = $252, plus about $28 in surcharges, roughly $280.
Worked examples: a $3,000 above-ground pool is $173 + $49 = $222, plus about $24 in surcharges, roughly $246, plus IBI $130, about $376.
A $6,000 rafter and decking repair is $232 + $49 = $281, plus about $31, roughly $312.. Replacing roof coverings on a one- to three-family home needs no permit when no more than two layers remain; structural repairs pay the permits-without-plans valuation fee, the $49 processing fee and five surcharges.