This calculator applies the fee lines quoted on the Charlotte permit pages: the city's own plan review, permit and surcharge figures, as published by the Mecklenburg County Code Enforcement. Pick a project, change the inputs, and the breakdown shows each line and how it is computed. 10 of 10 project types have a computable formula on their page; the rest show the page's own figure.
- Mecklenburg County issues every building and trade permit inside Charlotte, each priced on its own contract cost from the LUESA Fee Ordinance table plus a $3 technology charge per permit; the City of Charlotte adds its own LDIRL zoning and stormwater review for decks, sheds over 12 ft, pools and ADUs.
- Most models price the contractor path. An owner-occupant doing the work personally on a job under $40,000 pays the County's homeowner schedule instead ($60 per trade plus $45 per inspection trip), offered as an alternative on the shed, deck and electrical-panel models.
Charlotte shed permit fee
A shed over 12 ft in any dimension (mean roof height included) needs a County building permit priced on its value plus a City LDIRL review; smaller sheds need only a City zoning use permit.
| Line | How it is computed | Amount |
|---|---|---|
| County building permit (valuation table), contractor | $59.70 + 5 × $12.19 per 1,000 above 3,000 | $120.65 |
| Technology charge (building permit) | flat | $3 |
| City LDIRL review (zoning $65 + stormwater $50) | flat | $115 |
Charlotte fence permit fee
A fence needs no Mecklenburg County building permit; the City may require a zoning use permit, listed at $330 on its FY2025 fee sheet.
| Line | How it is computed | Amount |
|---|
Charlotte deck permit fee
Every deck needs a County building permit priced on its full construction value plus a $115 City LDIRL review.
| Line | How it is computed | Amount |
|---|---|---|
| County building permit (valuation table), contractor | $59.70 + 5 × $12.19 per 1,000 above 3,000 | $120.65 |
| Technology charge (building permit) | flat | $3 |
| Homeowner Recovery Fund (general contractor pulls the permit) optional | flat | $10 |
| City LDIRL review (zoning $65 + stormwater $50) | flat | $115 |
Charlotte pool permit fee
A pool over 24 in deep needs $75 Health Department approval, a $115 City LDIRL review, and County building, electrical and (where required) plumbing permits each priced on its own value.
| Line | How it is computed | Amount |
|---|---|---|
| Health Department application | flat | $75 |
| City LDIRL review (zoning $65 + stormwater $50) | flat | $115 |
| County building permit (valuation table) | $632.57 + 10 × $5.49 per 1,000 above 50,000 | $687.47 |
| Technology charge (building permit) | flat | $3 |
| Homeowner Recovery Fund (contractor pulls the building permit) optional | flat | $10 |
| Electrical permit ($5,000 of electrical) optional | flat | $84.08 |
| Technology charge (electrical permit) optional | flat | $3 |
| Plumbing permit ($3,000 of plumbing) optional | flat | $59.70 |
| Technology charge (plumbing permit) optional | flat | $3 |
Charlotte roof replacement permit fee
A same-material reroof costing $40,000 or less with no structural work needs no permit; a job over $40,000 or one replacing sheathing, rafters or trusses pays the County valuation-table building permit.
| Line | How it is computed | Amount |
|---|---|---|
| County building permit (valuation table) | $59.70 + 15 × $12.19 per 1,000 above 3,000 | $242.55 |
| Technology charge (building permit) | flat | $3 |
| Homeowner Recovery Fund (contractor pulls the permit) optional | flat | $10 |
Charlotte bathroom remodel permit fee
Same-spot fixture swaps need no permit; moving plumbing, adding circuits or moving walls needs separate County permits, each priced on its own contract cost plus a $3 technology charge.
| Line | How it is computed | Amount |
|---|---|---|
| County plumbing permit (valuation table) | $59.70 + 1 × $12.19 per 1,000 above 3,000 | $71.89 |
| Technology charge (plumbing permit) | flat | $3 |
| Electrical permit ($2,000 of electrical) optional | flat | $59.70 |
| Technology charge (electrical permit) optional | flat | $3 |
Charlotte kitchen remodel permit fee
Layout, plumbing, wiring or structural changes need separate County building, electrical, plumbing and mechanical permits, each priced on its own contract cost plus a $3 technology charge.
| Line | How it is computed | Amount |
|---|---|---|
| County building permit (valuation table) | $59.70 + 7 × $12.19 per 1,000 above 3,000 | $145.03 |
| Technology charge (building permit) | flat | $3 |
| Homeowner Recovery Fund (general contractor pulls the permit) optional | flat | $10 |
| Electrical permit ($3,000 of electrical) optional | flat | $59.70 |
| Technology charge (electrical permit) optional | flat | $3 |
| Plumbing permit ($2,000 of plumbing) optional | flat | $59.70 |
| Technology charge (plumbing permit) optional | flat | $3 |
Charlotte electrical panel permit fee
A panel replacement or service upgrade needs a County electrical permit priced on its contract value ($59.70 minimum) plus a $3 technology charge.
| Line | How it is computed | Amount |
|---|---|---|
| County electrical permit (valuation table), contractor | $59.70 + 1 × $12.19 per 1,000 above 3,000 | $71.89 |
| Technology charge (electrical permit) | flat | $3 |
Charlotte hvac permit fee
A like-for-like furnace, AC or heat pump change-out needs mechanical and electrical permits, priced together at 1.5 times the minimum fee ($89.55) through TIP, plus $3 per permit.
| Line | How it is computed | Amount |
|---|---|---|
| Mechanical + electrical change-out permits (TIP) | flat | $89.55 |
| Technology charge (mechanical permit) | flat | $3 |
| Technology charge (electrical permit) optional | flat | $3 |
Charlotte adu permit fee
An ADU pays the $475 City LDIRL review plus County building, electrical, plumbing and mechanical permits, each priced on its own contract cost plus a $3 technology charge.
| Line | How it is computed | Amount |
|---|---|---|
| City LDIRL review (stormwater $410 + zoning $65) | flat | $475 |
| County building permit (valuation table) | $907.12 + 50 × $5.93 per 1,000 above 100,000 | $1,203.62 |
| Technology charge (building permit) | flat | $3 |
| Homeowner Recovery Fund (general contractor pulls the permit) optional | flat | $10 |
| Electrical permit ($12,000 of electrical) optional | flat | $169.41 |
| Technology charge (electrical permit) optional | flat | $3 |
| Plumbing permit ($10,000 of plumbing) optional | flat | $145.03 |
| Technology charge (plumbing permit) optional | flat | $3 |
| Mechanical permit ($8,000 of mechanical) optional | flat | $120.65 |
| Technology charge (mechanical permit) optional | flat | $3 |
What the estimate covers
City fees only, on the ordinary residential path each page prices: the building or trade permit plus the mandatory lines the city adds to it. It leaves out whatever the page says is separate (a designer's fee, a contractor's licence, a utility connection) and anything the page does not price. Fee schedules change on the city's budget cycle; the month each page was last verified is Oct 2026, and the verification method explains how changes are caught.
Frequently asked questions
Other city calculators
- Albuquerque, NM
- Baltimore, MD
- Chicago, IL
- Cincinnati, OH
- Dallas, TX
- Fort Worth, TX
- Houston, TX
- Indianapolis, IN
- Jacksonville, FL
- Kansas City, MO
- Long Beach, CA
- Los Angeles, CA
- Louisville, KY
- Miami, FL
- Milwaukee, WI
- Minneapolis, MN
- New York City, NY
- Philadelphia, PA
- Phoenix, AZ
- Pittsburgh, PA
- Portland, OR
- Sacramento, CA
- San Antonio, TX
- San Diego, CA
- San Francisco, CA
- San Jose, CA
- Seattle, WA
- St. Louis, MO
- Tucson, AZ
Related: All cities · Research: fees compared across 30 cities · Charlotte permit guide