City fee lines from the Albuquerque permit pages, computed for your project. Sourced, verified Sep 2026.
Verified Sep 2026Calculator
This calculator applies the fee lines quoted on the Albuquerque permit pages: the city's own plan review, permit and surcharge figures, as published by the Planning Department - Building Safety Division. Pick a project, change the inputs, and the breakdown shows each line and how it is computed. 8 of 10 project types have a computable formula on their page; the rest show the page's own figure.
Building permits are UAC Table 112-A on the stated valuation, times a 0.50 modifier for one- and two-family homes, plus plan review at 65 percent of the permit fee; trade permits are itemized (UAC Tables 112-B and 112-C) with a $47 administrative charge on each application.
Table 112-A is modeled only on the band the pages state ($69.25 plus $14.00 per $1,000 over $2,000), so valuation inputs stop at $15,000, the highest valuation the pages price in that band; pool, ADU, a $30,000 kitchen and a roof conversion fall in bands whose start the pages never state and stay example_only or excluded.
Albuquerque shed permit fee
Sheds up to 120 sq ft need no building permit; larger sheds are valued at $34.99 per sq ft and pay Table 112-A times 0.50 plus 65 percent plan review, about $92 to $138 plus zoning review.
Exempt: No building permit for a one-story detached tool or storage shed of 120 sq ft or less (UAC 109.2.1); zoning placement rules and any trade permits still apply.
City valuation: 140 sq ft × $34.99 = $4,898.60
$91.79estimated city fees at the inputs above
Line
How it is computed
Amount
Building permit (Table 112-A x 0.50)
$69.25 + 3 × $14 per 1,000 above 2,000 × 0.5
$55.63
Plan review (65% of the permit fee)
65% of $55.63
$36.16
The page's own example: “x 0.50 = $55.63 permit + $36.16 plan review = $91.79.”
Not included: The zoning review ($25 on the Building Safety handout, $45 on the 2025 General Planning Fee Schedule; the page gives both); trade permits for wiring or plumbing.
Source: UAC Table 112-A with the 0.50 one- and two-family modifier. Read the Albuquerque shed permit page, which quotes the rule and records when it was last verified (Sep 2026).
Albuquerque fence permit fee
Any wall or fence up to 6 ft needs only the $35 zoning Wall or Fence Approval (Minor); over 6 ft adds an engineer-certified, valuation-based building permit.
$35estimated city fees at the inputs above
Line
How it is computed
Amount
Wall or Fence Approval (Minor), zoning
flat
$35
The page's own example: “Up to 6 ft: the $35 zoning fee.”
Not included: The engineer's or architect's certification for walls over 6 ft; $90 if built without the zoning permit.
Source: General Planning Fee Schedule, Wall or Fence Approval (Minor). Read the Albuquerque fence permit page, which quotes the rule and records when it was last verified (Sep 2026).
Albuquerque deck permit fee
Decks more than 30 in above grade need a building permit: Table 112-A on the stated valuation times 0.50 plus 65 percent plan review, about $126 to $207; lower platforms are exempt.
$126.44estimated city fees at the inputs above
Line
How it is computed
Amount
Building permit (Table 112-A x 0.50)
$69.25 + 6 × $14 per 1,000 above 2,000 × 0.5
$76.63
Plan review (65% of the permit fee)
65% of $76.63
$49.81
The page's own example: “x 0.50 = $76.63 permit + $49.81 plan review = $126.44.”
Not included: The zoning review fee ($25 for buildings under 4,000 sq ft); an electrical permit for deck lighting ($47 plus $1.50 per outlet). Platforms not more than 30 in above grade need no permit (height is not an input).
Source: UAC Table 112-A with the 0.50 one- and two-family modifier. Read the Albuquerque deck permit page, which quotes the rule and records when it was last verified (Sep 2026).
Albuquerque pool permit fee
In-ground pools need a valuation-based building permit (Table 112-A times 0.50 plus 65 percent plan review) plus electrical and plumbing permits of $47 + $60 each, about $660 to $810.
What the city page states: Add electrical ($47 + $60 = $107) and plumbing ($47 + $60 = $107): about $662.
Not computed here: The building permit is Table 112-A on the valuation times the 0.50 one- and two-family modifier plus 65 percent plan review; the page shows the worked arithmetic but not the Table 112-A band boundaries, and the calculator schema cannot apply a 0.50 multiplier to a tier result.
Every residential re-roof needs a flat $70 permit (a $30 administrative fee plus a $40 inspection fee), issued same day; repairs under $1,000 are exempt.
$70estimated city fees at the inputs above
Line
How it is computed
Amount
Administrative fee (Table 112-G, R-3 re-roof)
flat
$30
Inspection fee
flat
$40
The page's own example: “A flat $70 for a house.”
Not included: A roof conversion or truss repair is a valuation-based building permit (about $373 for the page's 1,500 sq ft conversion); $47 re-inspection.
Same-spot fixture swaps and tile need no permit; moved plumbing, new circuits and a ducted fan each need an itemized trade permit with a $47 administrative charge.
$77estimated city fees at the inputs above
Line
How it is computed
Amount
Plumbing administrative charge optional
flat
$47
Plumbing fixtures optional
3 fixtures × $10
$30
The page's own example: “Relocating the toilet, sink and shower drains: $47 + 3 x $10 = $77 plumbing permit.”
Not included: $47 re-inspections; gas outlets ($6) and the $0.90 rate for outlets past the first 20.
Cabinets, counters and tile need no permit; moved piping, new circuits and a ducted hood each need an itemized trade permit with a $47 administrative charge.
$67estimated city fees at the inputs above
Line
How it is computed
Amount
Plumbing administrative charge optional
flat
$47
Plumbing fixtures optional
2 fixtures × $10
$20
The page's own example: “Relocating the sink and adding a dishwasher line: $47 + 2 x $10 = $67 plumbing permit.”
Not included: A building permit when a wall is removed (Table 112-A times 0.50 plus 65 percent plan review, about $365 at $30,000), which the schema cannot apply; $47 re-inspections.
A panel replacement or service upgrade needs an itemized electrical permit: $47 administrative charge plus $8 per panel, plus $40 for a new meter loop on a service upgrade.
$55estimated city fees at the inputs above
Line
How it is computed
Amount
Electrical administrative charge
flat
$47
Panel
flat
$8
The page's own example: “Replacing a panel with the same service size: $47 + $8 = $55.”
Not included: $47 re-inspections; an investigation fee equal to the permit fee for work started without a permit.
Replacing a furnace, condenser, evaporative cooler or ductwork needs an itemized mechanical permit: $47 administrative charge plus a per-item fee.
$61estimated city fees at the inputs above
Line
How it is computed
Amount
Mechanical administrative charge
flat
$47
Furnace or other appliance optional
flat
$14
The page's own example: “Furnace replacement on the existing gas line: $47 + $14 = $61.”
Not included: A separate electrical permit when wiring changes ($47 plus $8 for a cooler or 30 amp appliance); condensing units over 36,000 BTU are $40; $47 re-inspections.
Source: UAC Table 112-C (mechanical). Read the Albuquerque hvac permit page, which quotes the rule and records when it was last verified (Sep 2026).
Albuquerque adu permit fee
A casita needs a $160 Site Plan – Administrative, a valuation-based building permit (Table 112-A times 0.50 plus 65 percent plan review) and electrical, plumbing and mechanical permits: about $1,000 to $1,150 before impact fees.
What the city page states: Together: roughly $997 for 500 sq ft and $1,142 for 750 sq ft.
Not computed here: The building permit is Table 112-A on the valuation times the 0.50 one- and two-family modifier plus 65 percent plan review; the page shows the worked arithmetic but not the Table 112-A band boundaries, and the calculator schema cannot apply a 0.50 multiplier to a tier result. The page also builds the valuation from a per-square-foot figure ($89.39) that it says may change from July 1, 2026.
City fees only, on the ordinary residential path each page prices: the building or trade permit plus the mandatory lines the city adds to it. It leaves out whatever the page says is separate (a designer's fee, a contractor's licence, a utility connection) and anything the page does not price. Fee schedules change on the city's budget cycle; the month each page was last verified is Sep 2026, and the verification method explains how changes are caught.
Frequently asked questions
x 0.50 = $55.63 permit + $36.16 plan review = $91.79.. Sheds up to 120 sq ft need no building permit; larger sheds are valued at $34.99 per sq ft and pay Table 112-A times 0.50 plus 65 percent plan review, about $92 to $138 plus zoning review.
Up to 6 ft: the $35 zoning fee.. Any wall or fence up to 6 ft needs only the $35 zoning Wall or Fence Approval (Minor); over 6 ft adds an engineer-certified, valuation-based building permit.
x 0.50 = $76.63 permit + $49.81 plan review = $126.44.. Decks more than 30 in above grade need a building permit: Table 112-A on the stated valuation times 0.50 plus 65 percent plan review, about $126 to $207; lower platforms are exempt.
Add electrical ($47 + $60 = $107) and plumbing ($47 + $60 = $107): about $662.
A flat $70 for a house.. Every residential re-roof needs a flat $70 permit (a $30 administrative fee plus a $40 inspection fee), issued same day; repairs under $1,000 are exempt.
Every line is read off the Albuquerque permit pages on this site, which quote the city's own fee schedule, bulletin or ordinance and record the month the sources were last verified (Sep 2026). The calculator holds no fee of its own.