This calculator applies the fee lines quoted on the Fresno permit pages: the city's own plan review, permit and surcharge figures, as published by the City of Fresno Building and Safety Services Division. Pick a project, change the inputs, and the breakdown shows each line and how it is computed. 8 of 10 project types have a computable formula on their page; the rest show the page's own figure.
- Fresno prices residential permits with flat lines from its Master Fee Schedule effective July 1, 2026 (plan check plus inspection per job type), not as a percentage of job value.
- Every permit carries the 12.83% General Plan surcharge and a $23.79 technology surcharge. The schedule names no base for the 12.83%; on trade permits the pages give it as about $14 on the $111.50 fee or about $18 if it also applies to the $27.08 issuance fee ($177 to $180 for a simple permit). This calculator applies it to the issuance fee as well, the upper reading.
- Building permits also carry the state Building Standards Commission surcharge of $1 for valuations up to $25,000 and $2 up to $50,000; the pages give no figure above $50,000, and the trade-permit section lists no state valuation surcharge.
- Stand-alone electrical, mechanical and plumbing permits add a $27.08 issuance fee. A furnace and AC together are $316.47 if billed on one permit or $343.55 if each is issued separately with its own issuance fee; the schedule does not say, and this calculator uses the one-permit reading.
- The trade-permit section also lists a $33.84 workers' compensation insurance verification charge per transaction; the pages do not say whether it applies, so it is not included. Work without a required permit can cost up to 4 times the permit fee.
Fresno shed permit fee
A one-story shed up to 120 sq ft, 12 ft tall and 3 ft from property lines needs no permit; the fee schedule has no shed line for a larger one.
What the city page states: The closest line is U-1 Garage, Carport in the new-construction tables, priced by floor area: its first row, 333 square feet, is $548.60 plan check plus $258.26 inspection, $806.86.
Fresno fence permit fee
Fences up to 7 ft need no building permit (zoning caps most at 6 ft past the front setback); a masonry wall is priced per 100 linear feet, City Standard or engineered, plus the General Plan, technology and state surcharges.
| Line | How it is computed | Amount |
|---|---|---|
| City Standard masonry or garden wall | $363.29 + 1 × $30.07 per 100 above 100 | $393.36 |
| General Plan surcharge (12.83%) | 12.83% of $393.36 | $50.47 |
| Technology surcharge | flat | $23.79 |
| State Building Standards Commission surcharge | $1 | $1 |
Fresno deck permit fee
A detached deck up to 200 sq ft and 30 in above grade that does not serve the exit door needs no permit; any other deck pays the flat Deck / Patio line, $504.85 or $937.05 engineered, plus surcharges.
| Line | How it is computed | Amount |
|---|---|---|
| Deck / Patio (non-engineered) | flat | $504.85 |
| General Plan surcharge (12.83%) | 12.83% of $504.85 | $64.77 |
| Technology surcharge | flat | $23.79 |
| State Building Standards Commission surcharge | $1 | $1 |
Fresno pool permit fee
Every in-ground pool or spa needs a building permit at the flat $488.57 Swimming Pool / Spa - Residential line, plus surcharges and, if billed on its own, a $138.58 simple electrical permit.
| Line | How it is computed | Amount |
|---|---|---|
| Swimming Pool / Spa - Residential | flat | $488.57 |
| No separate electrical permit | flat | $0 |
| General Plan surcharge (12.83%) | 12.83% of $488.57 | $62.68 |
| Technology surcharge | flat | $23.79 |
| State Building Standards Commission surcharge | $2 | $2 |
Fresno roof replacement permit fee
Every reroof needs a permit: $161.59 for a composition overlay, or $206.70 for the first 10 squares of any other roof plus $30.07 per additional 10, plus surcharges.
| Line | How it is computed | Amount |
|---|---|---|
| Other roofs (tear-off) | $206.70 + 2 × $30.07 per 10 above 10 | $266.84 |
| General Plan surcharge (12.83%) | 12.83% of $266.84 | $34.24 |
| Technology surcharge | flat | $23.79 |
| State Building Standards Commission surcharge | $1 | $1 |
Fresno bathroom remodel permit fee
Tile, paint and vanity cabinets need no permit; fixture, fan, circuit or water heater work takes one $138.58 simple trade permit, and moved walls take the $717.82 Residential Remodel line, plus surcharges.
| Line | How it is computed | Amount |
|---|---|---|
| Simple trade permit with issuance fee | flat | $138.58 |
| General Plan surcharge (12.83%) | 12.83% of $138.58 | $17.78 |
| Technology surcharge | flat | $23.79 |
Fresno kitchen remodel permit fee
Cabinets, counters, tile and paint need no permit; trade work takes one $138.58 simple trade permit, and a remodel with plans pays the $717.82 Residential Remodel line for the first 500 sq ft, plus surcharges.
| Line | How it is computed | Amount |
|---|---|---|
| Residential Remodel (plans) | $717.82 | $717.82 |
| General Plan surcharge (12.83%) | 12.83% of $717.82 | $92.10 |
| Technology surcharge | flat | $23.79 |
| State Building Standards Commission surcharge (building permit with plans only) optional | $2 | $2 |
Fresno electrical panel permit fee
Every panel or service change needs an electrical permit: $111.50 up to 400 amps or $935.79 over 400 up to 1,000 amps, plus the $27.08 issuance fee and surcharges.
| Line | How it is computed | Amount |
|---|---|---|
| Electrical service | $111.50 | $111.50 |
| Permit issuance fee | flat | $27.08 |
| General Plan surcharge (12.83%) | 12.83% of $138.58 | $17.78 |
| Technology surcharge | flat | $23.79 |
Fresno hvac permit fee
Every AC or furnace change-out needs a mechanical permit: $111.50 for a cooling unit (one simple permit covers all simple items), $177.89 per furnace, plus the $27.08 issuance fee and surcharges. Tick at least one item: a cooling unit, a furnace or both.
| Line | How it is computed | Amount |
|---|---|---|
| Cooling unit, evaporative cooler or air handler (simple item) optional | flat | $111.50 |
| Forced-air furnace (complex item) optional | flat | $177.89 |
| Permit issuance fee | flat | $27.08 |
| General Plan surcharge (12.83%) | 12.83% of $316.47 | $40.60 |
| Technology surcharge | flat | $23.79 |
Fresno adu permit fee
ADUs need a building permit but no zone clearance; the city's estimator is the only figure for a pre-approved plan, and for a custom ADU the page names the R-3 custom line ($2,545.59 first row) and the room-addition line ($257.30 plus $884.55) as the closest without saying which applies.
What the city page states: The city's Pre-Approved ADU Cost Estimator lists permit fees of $2,343.86 for Plan 1, a 340 square foot studio, rising to $2,861 for Plan 5, a 1,015 square foot three-bedroom.
What the estimate covers
City fees only, on the ordinary residential path each page prices: the building or trade permit plus the mandatory lines the city adds to it. It leaves out whatever the page says is separate (a designer's fee, a contractor's licence, a utility connection) and anything the page does not price. Fee schedules change on the city's budget cycle; the month each page was last verified is Nov 2026, and the verification method explains how changes are caught.
Frequently asked questions
Other city calculators
- Albuquerque, NM
- Aurora, CO
- Austin, TX
- Baltimore, MD
- Boston, MA
- Charlotte, NC
- Chicago, IL
- Cincinnati, OH
- Colorado Springs, CO
- Corpus Christi, TX
- Dallas, TX
- Denver, CO
- El Paso, TX
- Fort Worth, TX
- Honolulu, HI
- Houston, TX
- Indianapolis, IN
- Irvine, CA
- Jacksonville, FL
- Kansas City, MO
- Las Vegas, NV
- Long Beach, CA
- Los Angeles, CA
- Louisville, KY
- Miami, FL
- Milwaukee, WI
- Minneapolis, MN
- Nashville, TN
- New Orleans, LA
- New York City, NY
- Orlando, FL
- Philadelphia, PA
- Phoenix, AZ
- Pittsburgh, PA
- Portland, OR
- Raleigh, NC
- Riverside, CA
- Sacramento, CA
- San Antonio, TX
- San Diego, CA
- San Francisco, CA
- San Jose, CA
- Seattle, WA
- St. Louis, MO
- St. Paul, MN
- Stockton, CA
- Tampa, FL
- Tucson, AZ
- Tulsa, OK
- Virginia Beach, VA
- Washington, DC
- Wichita, KS
Related: All cities · Research: fees compared across 30 cities · Fresno permit guide