City fee lines from the San Jose permit pages, computed for your project. Sourced, verified Oct 2026.
Verified Oct 2026Calculator
This calculator applies the fee lines quoted on the San Jose permit pages: the city's own plan review, permit and surcharge figures, as published by the San José Department of Planning, Building and Code Enforcement. Pick a project, change the inputs, and the breakdown shows each line and how it is computed. 9 of 10 project types have a computable formula on their page; the rest show the page's own figure.
Fees come from the FY2026-27 Schedule of Fees and Charges (effective July 1, 2026): a one-hour processing line, a building permit at $315 per hour of inspection time in tiers of 40, 70, 130 or 250 minutes, and plan check at $325 per hour.
The Building Official sets the tier and may adjust the assessment to the actual scope, so modeled totals follow the pages' published arithmetic, not a quote.
San Jose shed permit fee
A shed over 120 sq ft pays a $211 processing fee, a building permit at $315 per hour of inspection time in tiers, and plan check at $325 per hour with a 30-minute minimum.
Exempt: One-story detached sheds of 120 sq ft or less need no building permit (SJMC 24.02.120.A.1).
$583.50estimated city fees at the inputs above
Line
How it is computed
Amount
Permit processing (Storage Shed line)
flat
$211
Building permit, Tier 1 inspection (40 min)
flat
$210
Plan check, 30-minute over-the-counter minimum
flat
$162.50
The page's own example: “A simple prefab shed that lands in Tier 1 therefore comes to about $211 + $210 + $162.50, roughly $585”
Not included: Tiers 3 and 4 and longer plan check; the Building Official may adjust the assessment; plumbing permits.
Source: Schedule of Fees and Charges, FY2026-27 (effective July 1, 2026). Read the San Jose shed permit page, which quotes the rule and records when it was last verified (Oct 2026).
San Jose fence permit fee
Fences up to 7 ft need no building permit; a taller fence pays $211 processing, a Tier 1 inspection fee at $315 per hour and a 30-minute plan check.
$583.50estimated city fees at the inputs above
Line
How it is computed
Amount
Permit processing (Fence line)
flat
$211
Building permit, Tier 1 inspection (40 min)
flat
$210
Plan check, 30-minute over-the-counter minimum
flat
$162.50
The page's own example: “A Tier 1 fence permit is therefore about $211 + $210 + $162.50, roughly $585”
Not included: Fences of 7 ft or less ($0; height is not an input); the Planning fence variance fee, which the page could not confirm; higher inspection tiers.
Source: Schedule of Fees and Charges, FY2026-27 (effective July 1, 2026). Read the San Jose fence permit page, which quotes the rule and records when it was last verified (Oct 2026).
San Jose deck permit fee
A deck that fails the four-part exemption pays $211 processing, a building permit at $315 per hour of inspection time in tiers, and plan check at $325 per hour.
$583.50estimated city fees at the inputs above
Line
How it is computed
Amount
Permit processing (Decks line)
flat
$211
Building permit, Tier 1 inspection (40 min)
flat
$210
Plan check, 30-minute over-the-counter minimum
flat
$162.50
The page's own example: “A small attached deck reviewed over the counter in Tier 1 is about $211 + $210 + $162.50, roughly $585”
Not included: Tiers 2 and 4; the Building Official may adjust fees to the scope; extensions at $105.
Source: Schedule of Fees and Charges, FY2026-27 (effective July 1, 2026). Read the San Jose deck permit page, which quotes the rule and records when it was last verified (Oct 2026).
San Jose pool permit fee
A pool pays $211 processing, a building permit at $315 per hour of inspection time in tiers, a one-hour plan check, and separate trade permits at a $315 minimum each.
$1,218.50estimated city fees at the inputs above
Line
How it is computed
Amount
Permit processing (Swimming Pool line)
flat
$211
Building permit, Tier 2 inspection
flat
$367.50
Plan check, one-hour minimum for a review intake
flat
$325
Electrical permit (minimum) optional
flat
$315
The page's own example: “A modest pool in Tier 2 with one electrical permit is about $211 + $367.50 + $325 + $315, roughly $1,220”
Not included: Tiers 1 and 3; itemized trade amounts above the $315 minimum; the contractor's fees.
Source: Schedule of Fees and Charges, FY2026-27 (effective July 1, 2026). Read the San Jose pool permit page, which quotes the rule and records when it was last verified (Oct 2026).
San Jose roof replacement permit fee
Reroofing 25 percent or more of the roof in 12 months is a flat $236 residential permit covering two inspections; a $211 processing line can apply on counter filings.
$236estimated city fees at the inputs above
Line
How it is computed
Amount
Residential reroofing permit (two inspections)
flat
$236
The page's own example: “The city's schedule sets the residential Reroofing Permit at $236 for up to two inspections”
Not included: Additional inspections at $157 per half hour; structural roof replacement with plans; the online checkout may price processing differently.
Source: City fee schedule, residential Reroofing Permit; FY2026-27 processing table. Read the San Jose roof replacement permit page, which quotes the rule and records when it was last verified (Oct 2026).
San Jose bathroom remodel permit fee
A permitted bathroom remodel pays $211 Bath processing, a building or combination permit at $315 per hour of inspection time in tiers, and plan check at $325 per hour.
$583.50estimated city fees at the inputs above
Line
How it is computed
Amount
Permit processing (Bath line)
flat
$211
Combination permit, Tier 1 inspection
flat
$210
Plan check, 30-minute over-the-counter minimum
flat
$162.50
The page's own example: “A same-footprint remodel with new fixtures, a fan and a circuit in Tier 1 is about $211 + $210 + $162.50, roughly $585”
Not included: Single online trade permits filed alone (the greater of a $315 minimum or an itemized amount); a water heater's $52 processing charge; Building Official adjustments.
Source: Schedule of Fees and Charges, FY2026-27 (effective July 1, 2026). Read the San Jose bathroom remodel permit page, which quotes the rule and records when it was last verified (Oct 2026).
San Jose kitchen remodel permit fee
A permitted kitchen remodel pays $211 Kitchen Minor or Major processing, a building or combination permit at $315 per hour of inspection time in tiers, and plan check at $325 per hour.
$741estimated city fees at the inputs above
Line
How it is computed
Amount
Permit processing (Kitchen Minor or Major line)
flat
$211
Combination permit, Tier 2 inspection
flat
$367.50
Plan check, 30-minute over-the-counter minimum
flat
$162.50
The page's own example: “A minor remodel with a few fixture and circuit changes reviewed over the counter in Tier 2 is about $211 + $367.50 + $162.50, roughly $740”
Not included: Trade permits filed alone (the greater of a $315 minimum or an itemized amount); Building Official adjustments; the engineer's fee for a beam.
Source: Schedule of Fees and Charges, FY2026-27 (effective July 1, 2026). Read the San Jose kitchen remodel permit page, which quotes the rule and records when it was last verified (Oct 2026).
San Jose electrical panel permit fee
A panel or service change is an online electrical permit at $315 per hour of required inspection time with a $315 minimum; counter filings add a $211 processing line.
$315estimated city fees at the inputs above
Line
How it is computed
Amount
Electrical permit (one inspection, $315 minimum)
flat
$315
The page's own example: “A panel change that takes one inspection is therefore about $315 in permit fee”
Not included: Additional inspection hours; the itemized electrical table in the city's fee schedule PDF, which the page could not reach; reinspection fees.
Source: Schedule of Fees and Charges, FY2026-27 (effective July 1, 2026). Read the San Jose electrical panel permit page, which quotes the rule and records when it was last verified (Oct 2026).
San Jose hvac permit fee
A furnace, AC or heat pump change-out is an online mechanical permit at $315 per hour of inspection time with a $315 minimum; a new circuit adds an electrical permit.
$315estimated city fees at the inputs above
Line
How it is computed
Amount
Mechanical permit (one inspection, $315 minimum)
flat
$315
The page's own example: “A furnace or condenser change-out that passes in one inspection is therefore about $315 in permit fee”
Not included: Additional inspection time and itemized amounts above the minimum; reinspection fees.
Source: Schedule of Fees and Charges, FY2026-27 (effective July 1, 2026). Read the San Jose hvac permit page, which quotes the rule and records when it was last verified (Oct 2026).
San Jose adu permit fee
The city's Fee Estimator reports average actual ADU permit totals by type and size band, including plan check, trade permits and taxes.
What the city page states: it reported a detached ADU of 0 to 750 square feet at $12,628 total (permit issuance $3,912, plan check $2,508, trade permits $2,078, taxes $4,129), a detached ADU of 751 to 1,200 square feet at $21,446
Not computed here: The page gives the city estimator's averages of recent permits by size band, not the formula behind them; only the $422/$633 processing component is a fixed schedule figure.
City fees only, on the ordinary residential path each page prices: the building or trade permit plus the mandatory lines the city adds to it. It leaves out whatever the page says is separate (a designer's fee, a contractor's licence, a utility connection) and anything the page does not price. Fee schedules change on the city's budget cycle; the month each page was last verified is Oct 2026, and the verification method explains how changes are caught.
Frequently asked questions
A simple prefab shed that lands in Tier 1 therefore comes to about $211 + $210 + $162.50, roughly $585. A shed over 120 sq ft pays a $211 processing fee, a building permit at $315 per hour of inspection time in tiers, and plan check at $325 per hour with a 30-minute minimum.
A Tier 1 fence permit is therefore about $211 + $210 + $162.50, roughly $585. Fences up to 7 ft need no building permit; a taller fence pays $211 processing, a Tier 1 inspection fee at $315 per hour and a 30-minute plan check.
A small attached deck reviewed over the counter in Tier 1 is about $211 + $210 + $162.50, roughly $585. A deck that fails the four-part exemption pays $211 processing, a building permit at $315 per hour of inspection time in tiers, and plan check at $325 per hour.
A modest pool in Tier 2 with one electrical permit is about $211 + $367.50 + $325 + $315, roughly $1,220. A pool pays $211 processing, a building permit at $315 per hour of inspection time in tiers, a one-hour plan check, and separate trade permits at a $315 minimum each.
The city's schedule sets the residential Reroofing Permit at $236 for up to two inspections. Reroofing 25 percent or more of the roof in 12 months is a flat $236 residential permit covering two inspections; a $211 processing line can apply on counter filings.
Every line is read off the San Jose permit pages on this site, which quote the city's own fee schedule, bulletin or ordinance and record the month the sources were last verified (Oct 2026). The calculator holds no fee of its own.