What's Required in Aurora
- Every electrical service change needs a permit and an electrical inspection.
- No plan submittal is required for a residential service upgrade.
- Electrical work is reviewed and inspected to the 2026 National Electrical Code.
- Electrical contractors need a State of Colorado master's and contractor's license on file with the city.
- Report materials cost so the city can collect use tax.
- Hard-wired EV chargers and home batteries carry their own flat-fee permits.
Do I need a permit to replace an electrical panel in Aurora?
Yes. The City of Aurora Building Division's permit chart lists an electrical service change as always needing a permit, with no plan submittal and an electrical inspection. A panel upgrade, a meter-and-main swap or a move to a larger amp service all change the service. The chart also says modifications to the electrical system need a permit. Aurora's chart rule comes from its Do It Right home improvement handbook, dated March 2019; confirm it still applies at 303.739.7420.
How much does a panel permit cost?
Aurora charges a flat fee. The city's 2026 flat-rate fee sheet lists a residential electrical service upgrade at $190, whatever the amperage or contract price. Related flat fees on the same sheet:
- Residential EV charger: $99.
- Energy storage system (home battery): $191.
- Residential solar PV system: $500.
Use tax still applies to the materials: 3.75% of materials cost to the city, plus 0.25% in Arapahoe County. On $1,500 of panel and breakers, the city's use tax deposit is $56.25. If your job is a panel replacement that the Permit Center does not class as a service upgrade, the flat sheet does not name it; the fee would then come from the city's valuation calculator, which returns a $166 permit fee for a $3,000 job. Ask when you apply.
Electrical scenarios
| What you are doing | City filing | Rule |
|---|---|---|
| Service upgrade to a larger amp rating | Service upgrade permit, $190 | Always needs a permit; electrical inspection |
| Panel replaced, same service size | Electrical permit | Ask whether the $190 flat fee or the calculator applies |
| Hard-wired EV charger | EV charger permit, $99 | Plug-in chargers need no permit unless hard wired |
| Home battery system | Energy storage permit, $191 | Flat fee on the 2026 sheet |
| New circuit or outlet where none existed | Electrical permit | New device where none existed |
| Replacing a switch or outlet in place | None | Chart: no permit unless a new device is installed where none existed; breakers are not listed, so ask |
Which electrical code applies?
Aurora adopts the National Electrical Code at the same time as the State of Colorado. The city moved to the 2026 NEC effective 8-1-2026: any new application for electrical work is reviewed and inspected to the 2026 edition. Your electrician should design the panel, grounding and any new AFCI or GFCI protection to that edition. The city's Adopted Building Codes PDF (revised 02/2026) still shows the 2023 NEC; the Permits page notice, effective 8-1-2026, governs new applications.
Who can pull the permit?
Aurora does not license electricians itself. An electrical contractor needs a current State of Colorado master's and contractor's license on file with the Building Division before it can pull Aurora permits. Ask the Permit Center whether an owner may do their own electrical service work; any electrician you hire needs a State of Colorado master's and contractor's license on file.
How long does it take?
Because no plans are required, a service upgrade permit is issued through the Aurora4Biz building portal or at the Permit Center counter. After the work, request the electrical inspection online, by email or at 303.739.7420; the city does not publish a turnaround time.
How to Get a Electrical Panel Permit in Aurora
Confirm the scope
Tell the Permit Center whether you are upgrading the service or replacing a panel at the same size.
Hire a licensed electrician
Confirm the company's State of Colorado license is on file with Aurora using the city's contractor lookup.
Apply and pay
File through the Aurora4Biz building portal or at the Permit Center and pay the $190 flat fee plus use tax.
Do the work to the 2026 NEC
Install the panel, grounding and protection to the 2026 National Electrical Code.
Pass the inspection
Request the electrical inspection online, by email or at 303.739.7420 when the work is complete.