This calculator applies the fee lines quoted on the Los Angeles permit pages: the city's own plan review, permit and surcharge figures, as published by the LADBS. Pick a project, change the inputs, and the breakdown shows each line and how it is computed. 2 of 10 project types have a computable formula on their page; the rest show the page's own figure.
- Building permits are priced on valuation through the LADBS Permit Fee Calculator; the pages quote its totals, not the table behind them. Card payments add 2.7 percent.
Los Angeles shed permit fee
LADBS has no size exemption: a shed over $2,500 in value pays a valuation-based permit fee plus plan check at 90% of it, surcharges included.
What the city page states: a $5,000 shed pays a permit fee of $217.72 plus plan check of $148.38, about $366 in total
Los Angeles fence permit fee
Only masonry or concrete walls over 3.5 ft (and pool barriers) need a permit, priced on valuation plus plan check at 90% of the permit fee.
What the city page states: The city's Permit Fee Calculator returns a permit total of $200.65 and plan check of $136.85 for a $5,000 non-building structure, about $338 together
Los Angeles deck permit fee
A deck over 30 in above grade and valued over $2,500 pays a valuation-based permit fee plus plan check at 90% of it, surcharges included.
What the city page states: returns a permit total of $363.15 and plan check of $317.13 for a $15,000 deck, about $680 together
Los Angeles pool permit fee
A pool over 24 in deep or 250 sq ft pays a combined building-mechanical permit at 75% of the Table 1-A building fee plus 90% plan check and a $65 noise inspection where equipment is near a lot line.
What the city page states: returns a permit total of $812.46 and plan check of $659.70 for a $60,000 pool, about $1,472 together
Los Angeles roof replacement permit fee
A re-roof is an express permit with no plan check, priced on valuation (the city's table or the contract if higher).
What the city page states: returns a permit total of $201.47 for a job valued at $5,000, $250.40 at $10,000, $423.91 at $20,000 and $465.98 at $25,000, surcharges included
Los Angeles bathroom remodel permit fee
A non-structural bathroom remodel over $2,500 is an express building permit priced on valuation, plus per-item plumbing, electrical and exhaust-fan permits.
What the city page states: A $25,000 bathroom with all three trade permits is therefore about $763 in city fees.
Los Angeles kitchen remodel permit fee
A non-structural kitchen remodel over $2,500 is an express building permit priced on valuation, plus per-item plumbing, electrical and vent permits.
What the city page states: A $50,000 kitchen with all three trade permits therefore runs about $975 in city fees.
Los Angeles electrical panel permit fee
A service or panel upgrade up to 400 A is an express electrical permit priced per item ($16 service and $16 panel to 200 A; $34 and $38 to 600 A), held to a $99 minimum subtotal, plus 3% and 6% surcharges.
| Line | How it is computed | Amount |
|---|---|---|
| Service | $16 | $16 |
| Panelboard | $16 | $16 |
| Minimum subtotal | brings the total up to the $99 minimum | $67 |
| Development Services surcharge (3%) | 3% of $99 | $2.97 |
| Systems surcharge (6%) | 6% of $99 | $5.94 |
Los Angeles hvac permit fee
AC and furnace change-outs are express HVAC permits priced per item: the calculator gives a $60.50 subtotal for one item and $99 for two or more, plus 3% and 6% surcharges.
| Line | How it is computed | Amount |
|---|---|---|
| Permit subtotal | $99 | $99 |
| Development Services surcharge (3%) | 3% of $99 | $2.97 |
| Systems surcharge (6%) | 6% of $99 | $5.94 |
Los Angeles adu permit fee
An ADU is a valuation-based combined permit plus plan check at 90% of the permit fee; school fees and construction taxes come on top.
What the city page states: returns a permit total of $1,444.44 and plan check of $1,252.01 for a $150,000 ADU, about $2,696 together
What the estimate covers
City fees only, on the ordinary residential path each page prices: the building or trade permit plus the mandatory lines the city adds to it. It leaves out whatever the page says is separate (a designer's fee, a contractor's licence, a utility connection) and anything the page does not price. Fee schedules change on the city's budget cycle; the month each page was last verified is Sep 2026, and the verification method explains how changes are caught.
Frequently asked questions
Other city calculators
- Albuquerque, NM
- Baltimore, MD
- Charlotte, NC
- Chicago, IL
- Cincinnati, OH
- Dallas, TX
- Fort Worth, TX
- Houston, TX
- Indianapolis, IN
- Jacksonville, FL
- Kansas City, MO
- Long Beach, CA
- Louisville, KY
- Miami, FL
- Milwaukee, WI
- Minneapolis, MN
- New York City, NY
- Philadelphia, PA
- Phoenix, AZ
- Pittsburgh, PA
- Portland, OR
- Sacramento, CA
- San Antonio, TX
- San Diego, CA
- San Francisco, CA
- San Jose, CA
- Seattle, WA
- St. Louis, MO
- Tucson, AZ
Related: All cities · Research: fees compared across 30 cities · Los Angeles permit guide