City fee lines from the Houston permit pages, computed for your project. Sourced, verified Sep 2026.
Verified Sep 2026Calculator
This calculator applies the fee lines quoted on the Houston permit pages: the city's own plan review, permit and surcharge figures, as published by the Houston Permitting Center. Pick a project, change the inputs, and the breakdown shows each line and how it is computed. 10 of 10 project types have a computable formula on their page; the rest show the page's own figure.
Texas HB 852 bars valuation-based residential fees, so Houston's 2026 Building Code Enforcement fee schedule prices residential construction by square footage, length or item.
Every permit carries the $33.56 administrative fee; permits with plans add a non-refundable plan review fee of 25 percent of the permit fee; the minimum permit fee is $91.06 ($97.56 for plumbing).
Houston shed permit fee
A one-story shed of 120 sq ft or less needs no building permit; a larger shed is priced on the wood-frame square-footage tier with a $91.06 minimum, plus 25 percent plan review and the $33.56 admin fee.
Exempt: One-story detached accessory structures of 120 sq ft or less need no building permit (Residential Permitting 101; Top 10 sheet)
$212.91estimated city fees at the inputs above
Line
How it is computed
Amount
Permit fee (wood-frame square-footage tier)
$47 + 18 × $5.36 per 8.17 above 57.16
$143.48
Plan review (25%)
25% of $143.48
$35.87
Administrative fee
flat
$33.56
The page's own example: “A 200-square-foot shed therefore comes to about $143 in permit fee, $36 in plan review and $33.56 admin, roughly $213 total”
Not included: Electrical permits (minimum $91.06) and plumbing permits (minimum $97.56), each plus the admin fee; a floodplain development permit where required.
Source: 2026 Building Code Enforcement fee schedule, one- and two-family residential table. Read the Houston shed permit page, which quotes the rule and records when it was last verified (Sep 2026).
Houston fence permit fee
Fences up to 8 feet that are not masonry, concrete or electrified need no permit; a fence that files is priced by length with a $91.06 minimum, plus 25 percent plan review and the $33.56 admin fee.
The page's own example: “A 150-foot masonry fence therefore runs about $91.06 in permit fee, $22.77 in plan review and $33.56 admin, roughly $147”
Not included: Exempt fences (8 feet or under, not masonry or concrete, not electrified): height and material are not calculator inputs.
Source: 2026 Building Code Enforcement fee schedule; HPC Residential Fencing (HPWCODE 1145). Read the Houston fence permit page, which quotes the rule and records when it was last verified (Sep 2026).
Houston deck permit fee
Uncovered decks up to 30 inches above grade need no permit; a higher or covered deck is priced on the wood-frame square-footage tier with a $91.06 minimum, plus 25 percent plan review and the $33.56 admin fee.
$293.31estimated city fees at the inputs above
Line
How it is computed
Amount
Permit fee (wood-frame square-footage tier)
$47 + 30 × $5.36 per 8.17 above 57.16
$207.80
Plan review (25%)
25% of $207.80
$51.95
Administrative fee
flat
$33.56
The page's own example: “A 300-square-foot raised deck comes to about $208 in permit fee, $52 in plan review and $33.56 admin, roughly $293 total”
Not included: Exempt decks (uncovered, 30 inches or less above grade) are height-based, not a calculator input; wiring is a separate electrical permit at a $91.06 minimum plus the admin fee.
Source: 2026 Building Code Enforcement fee schedule, one- and two-family residential table. Read the Houston deck permit page, which quotes the rule and records when it was last verified (Sep 2026).
Houston pool permit fee
A new in-ground pool pays the Health Department plan review ($94.00 plus $33.56 admin) and a Structural Swimming Pool Permit at no less than the $91.06 minimum plus admin; the page adds electrical and gas trade permits to reach about $500.
$507.92estimated city fees at the inputs above
Line
How it is computed
Amount
Health Department plan review
flat
$94
Health review admin fee
flat
$33.56
Swimming Pool Permit (structural minimum)
flat
$91.06
Pool permit admin fee
flat
$33.56
Electrical permit for the equipment (minimum) optional
flat
$91.06
Electrical permit admin fee optional
flat
$33.56
Gas permit for a heater (plumbing minimum) optional
flat
$97.56
Gas permit admin fee optional
flat
$33.56
The page's own example: “which is how a typical in-ground pool lands near $500 in city fees”
Not included: The Swimming Pool Permit fee itself comes from a schedule with no pool line, so it is modeled at its $91.06 minimum; the 25 percent plan review on the estimated permit fee, a floodplain permit, and the contractor, survey and engineering are not included.
Source: 2026 Building Code Enforcement fee schedule; HPC Swimming Pool Permit (HPWCODE 1141); HHD 1011. Read the Houston pool permit page, which quotes the rule and records when it was last verified (Sep 2026).
Houston roof replacement permit fee
Any re-roof or overlay needs a permit; the schedule has no re-roof line, so a straightforward re-roof pays the $91.06 minimum, 25 percent plan review and the $33.56 admin fee.
$147.39estimated city fees at the inputs above
Line
How it is computed
Amount
Permit fee (schedule minimum)
flat
$91.06
Plan review (25%)
25% of $91.06
$22.77
Administrative fee
flat
$33.56
The page's own example: “a straightforward re-roof runs about $91.06 plus $22.77 plan review plus $33.56 admin, roughly $147”
Not included: A re-roof the reviewer prices higher on the square-footage table (large or decking-level jobs, 'a few hundred dollars'); repairs of 100 sq ft or less are exempt.
Source: 2026 Building Code Enforcement fee schedule; HPC Residential Roofing Permit (HPWCODE 1140). Read the Houston roof replacement permit page, which quotes the rule and records when it was last verified (Sep 2026).
Houston bathroom remodel permit fee
Finish work needs no permit; plumbing and electrical work each need a trade permit with its own minimum and $33.56 admin fee, and a floor-plan change adds a remodel permit priced by square footage.
$255.74estimated city fees at the inputs above
Line
How it is computed
Amount
Plumbing fixture permit (master plumber)
$34.24 (minimum $97.56)
$97.56
Plumbing permit admin fee
flat
$33.56
Electrical permit (minimum)
flat
$91.06
Electrical permit admin fee
flat
$33.56
The page's own example: “each permit adds the $33.56 admin fee, so plumbing and electrical together are about $256”
Not included: Electrical items beyond the minimum ($1.34 per outlet or fixture); contractors' prices.
Finish work needs no permit; a floor-plan change takes a remodel permit priced by square footage plus 25 percent plan review and admin, and plumbing, electrical and mechanical work each add a trade permit with its own minimum and admin fee.
$253.11estimated city fees at the inputs above
Line
How it is computed
Amount
Remodel permit (square-footage tier)
$47 + 24 × $5.36 per 8.17 above 57.16
$175.64
Remodel plan review (25%)
25% of $175.64
$43.91
Remodel permit admin fee
flat
$33.56
The page's own example: “so a 250-square-foot kitchen remodel that moves a wall is about $253 for the building permit”
Not included: The mechanical alteration permit (2 percent of job cost plus $47.00, $91.06 minimum, plus admin) for duct or hood changes; electrical items beyond the minimum; contractors' prices.
A panel replacement is a Circuit Panel Permit at the $91.06 minimum and a service upgrade a Meter and Loop Service permit at $94.00 (up to 50 kW), each plus the $33.56 admin fee and pulled only by a registered master electrician.
$124.62estimated city fees at the inputs above
Line
How it is computed
Amount
Circuit Panel Permit (panel replacement)
flat
$91.06
Administrative fee
flat
$33.56
The page's own example: “so a panel replacement is $91.06 plus admin, $124.62”
Not included: Outlets and fixtures ($1.34 each) and a range receptacle ($4.70) once items exceed the minimum; CenterPoint's charges and the electrician's price.
Source: 2026 Building Code Enforcement fee schedule; HPC Circuit Panel Permit (HPWCODE 1062). Read the Houston electrical panel permit page, which quotes the rule and records when it was last verified (Sep 2026).
Houston hvac permit fee
Every A/C replacement needs a mechanical permit; a complete system is $11.41 per ton plus $47.00 with a $91.06 minimum, plus the $33.56 admin fee.
$124.62estimated city fees at the inputs above
Line
How it is computed
Amount
Mechanical permit (complete system)
$47 + 3 × $11.41 per 1 above 0 (minimum $91.06)
$91.06
Administrative fee
flat
$33.56
The page's own example: “A 3-ton system is about $125 all in and a 5-ton system about $138.”
Not included: Alterations to an existing system (2 percent of valuation plus $47.00); separate electrical and gas permits; the contractor's price.
Source: 2026 Building Code Enforcement fee schedule, HVAC fees. Read the Houston hvac permit page, which quotes the rule and records when it was last verified (Sep 2026).
Houston adu permit fee
A detached secondary dwelling unit up to 900 sq ft is new residential construction priced on the wood-frame square-footage tier, plus 25 percent plan review and the $33.56 admin fee.
$789.11estimated city fees at the inputs above
Line
How it is computed
Amount
Permit fee (wood-frame square-footage tier)
$47 + 104 × $5.36 per 8.17 above 57.16
$604.44
Plan review (25%)
25% of $604.44
$151.11
Administrative fee
flat
$33.56
The page's own example: “the $33.56 administrative fee, roughly $789 for the building permit”
Not included: Plumbing, electrical and HVAC trade permits (each with its own minimum and admin fee); impact fees, utility taps and the designer's fee.
Source: 2026 Building Code Enforcement fee schedule, one- and two-family residential table. Read the Houston adu permit page, which quotes the rule and records when it was last verified (Sep 2026).
What the estimate covers
City fees only, on the ordinary residential path each page prices: the building or trade permit plus the mandatory lines the city adds to it. It leaves out whatever the page says is separate (a designer's fee, a contractor's licence, a utility connection) and anything the page does not price. Fee schedules change on the city's budget cycle; the month each page was last verified is Sep 2026, and the verification method explains how changes are caught.
Frequently asked questions
A 200-square-foot shed therefore comes to about $143 in permit fee, $36 in plan review and $33.56 admin, roughly $213 total. A one-story shed of 120 sq ft or less needs no building permit; a larger shed is priced on the wood-frame square-footage tier with a $91.06 minimum, plus 25 percent plan review and the $33.56 admin fee.
A 150-foot masonry fence therefore runs about $91.06 in permit fee, $22.77 in plan review and $33.56 admin, roughly $147. Fences up to 8 feet that are not masonry, concrete or electrified need no permit; a fence that files is priced by length with a $91.06 minimum, plus 25 percent plan review and the $33.56 admin fee.
A 300-square-foot raised deck comes to about $208 in permit fee, $52 in plan review and $33.56 admin, roughly $293 total. Uncovered decks up to 30 inches above grade need no permit; a higher or covered deck is priced on the wood-frame square-footage tier with a $91.06 minimum, plus 25 percent plan review and the $33.56 admin fee.
which is how a typical in-ground pool lands near $500 in city fees. A new in-ground pool pays the Health Department plan review ($94.00 plus $33.56 admin) and a Structural Swimming Pool Permit at no less than the $91.06 minimum plus admin; the page adds electrical and gas trade permits to reach about $500.
a straightforward re-roof runs about $91.06 plus $22.77 plan review plus $33.56 admin, roughly $147. Any re-roof or overlay needs a permit; the schedule has no re-roof line, so a straightforward re-roof pays the $91.06 minimum, 25 percent plan review and the $33.56 admin fee.
Every line is read off the Houston permit pages on this site, which quote the city's own fee schedule, bulletin or ordinance and record the month the sources were last verified (Sep 2026). The calculator holds no fee of its own.