City fee lines from the Tampa permit pages, computed for your project. Sourced, verified Nov 2026.
Verified Nov 2026Calculator
This calculator applies the fee lines quoted on the Tampa permit pages: the city's own plan review, permit and surcharge figures, as published by the City of Tampa Construction Services Division. Pick a project, change the inputs, and the breakdown shows each line and how it is computed. 9 of 10 project types have a computable formula on their page; the rest show the page's own figure.
Tampa prices most residential permits as flat fees by project type: the Miscellaneous Projects fee schedule for sheds, decks, walls and pools, and the Trade Permit Fee Schedule ($120 per trade, $177 for roofing).
Every permit carries the 2.5% Florida Building Permit Surcharge with a $4.00 minimum, so $177 becomes $181.43 and a $120 trade permit $124.00.
Remodels and new living space are priced by the city's fee estimator, whose totals already include the surcharge; the estimator is guidance and the final fee is set in plan review.
Tampa shed permit fee
A shed of 120 sq ft or less is exempt; a larger shed up to 500 sq ft pays the flat $177 accessory-structure fee plus the 2.5% state surcharge, $181.43.
Exempt: One-story detached storage sheds and playhouses of 120 sq ft or less of floor area need no permit (City Code 5-105.2(1)(g)); setbacks still apply. A 2020 city sheet says 150 sq ft, so ask the city between 121 and 150 sq ft. The page's exempt row assumes no wiring; ask the city about a light or outlet.
$181.43estimated city fees at the inputs above
Line
How it is computed
Amount
Accessory structure fee
flat
$177
Florida Building Permit Surcharge (2.5%)
2.5% of $177
$4.43
The page's own example: “The arithmetic: $177 × 1.025 = $181.43.”
Not included: Detached buildings over 500 sq ft (New Construction and Additions, priced by square footage); plan revision and re-inspection fees. Wiring may be covered by the Miscellaneous fee; ask the city.
Source: Miscellaneous Projects fee schedule (residential). Read the Tampa shed permit page, which quotes the rule and records when it was last verified (Nov 2026).
Tampa fence permit fee
A masonry privacy or retaining wall pays the flat $475 Privacy/Retaining Wall fee plus the 2.5% state surcharge, $486.88; the city publishes no fee line for wood, vinyl or chain-link fences.
$486.88estimated city fees at the inputs above
Line
How it is computed
Amount
Privacy/Retaining Wall fee (masonry or retaining walls only)
flat
$475
Florida Building Permit Surcharge (2.5%)
2.5% of $475
$11.88
The page's own example: “The arithmetic: $475 × 1.025 = $486.88, which is the total the city's fee estimator returns ($194.75 plan review, $292.13 remainder).”
Not included: Wood, vinyl and chain-link fences (no published fee line; ask Construction Services); pool barriers, inspected under the pool permit.
Source: Miscellaneous Projects fee schedule (residential). Read the Tampa fence permit page, which quotes the rule and records when it was last verified (Nov 2026).
Tampa deck permit fee
Every deck needs a Residential Miscellaneous permit, a flat $177 (Accessory Structure) or $214 (Driveway, Patio Slab, Deck) as the city assigns the category (the schedule does not say which applies, so ask Construction Services), plus the 2.5% state surcharge.
$181.43estimated city fees at the inputs above
Line
How it is computed
Amount
Accessory Structure line
flat
$177
Florida Building Permit Surcharge (2.5%)
2.5% of $177
$4.43
The page's own example: “With the 2.5% Florida Building Permit Surcharge: $177 × 1.025 = $181.43.”
Not included: Enclosing a deck as living space (New Construction and Additions, priced by square footage); plan revision and re-inspection fees. Lights or outlets may be covered by the Miscellaneous fee; ask the city.
Source: Miscellaneous Projects fee schedule (residential). Read the Tampa deck permit page, which quotes the rule and records when it was last verified (Nov 2026).
Tampa pool permit fee
A pool pays a flat $716 (in-ground) or $292 (above-ground) plus the 2.5% state surcharge; a screen cage adds $316 plus surcharge.
$733.90estimated city fees at the inputs above
Line
How it is computed
Amount
In-ground pool or spa
flat
$716
Florida Building Permit Surcharge (2.5%)
2.5% of $716
$17.90
The page's own example: “$716 × 1.025 = $733.90, the total the city's fee estimator returns ($293.56 plan review, $440.34 remainder).”
Not included: The sealed plans and any topographical survey; the fee schedule predates the Pool Permit application type, so the invoice may differ.
Source: Miscellaneous Projects fee schedule (residential). Read the Tampa pool permit page, which quotes the rule and records when it was last verified (Nov 2026).
Tampa roof replacement permit fee
Roof work of 500 sq ft or less is exempt; above that a roofing trade permit is a flat $177 plus the 2.5% state surcharge, $181.43, regardless of size or price.
Exempt: Re-roofing, recovering or repairing 500 sq ft or less of roof covering needs no permit (City Code 5-105.2(1)(e)); the work must still meet the code and the 25% rule.
$181.43estimated city fees at the inputs above
Line
How it is computed
Amount
Residential roofing fee
flat
$177
Florida Building Permit Surcharge (2.5%)
2.5% of $177
$4.43
The page's own example: “every permit carries the 2.5% Florida Building Permit Surcharge: $177 × 1.025 = $181.43”
Not included: The $120 re-inspection fee after a failed inspection; the roofer's own charges.
Finish work is exempt; a fixture swap is one $124.00 plumbing trade permit, and a full remodel adds the Building Alterations permit ($395.65 by the city's estimator for 100 sq ft, surcharge included), with trade permits if billed separately.
$643.65estimated city fees at the inputs above
Line
How it is computed
Amount
Building Alterations permit (estimator, 100 sq ft, incl. 2.5%) optional
The page's own example: “If the plumbing and electrical permits are charged separately: $395.65 + $124.00 + $124.00 = $643.65.”
Not included: Plan revision fees (10% of the permit fee, minimum $120) and $120 re-inspections; the architect's sealed plans where required. The estimator is guidance; the final fee is set in plan review, and trade permits may be billed on top.
Source: City fee estimator (Building Alterations) and Trade Permit Fee Schedule. Read the Tampa bathroom remodel permit page, which quotes the rule and records when it was last verified (Nov 2026).
Tampa kitchen remodel permit fee
Finishes are exempt; a remodel is a Building Alterations permit ($395.65 by the city's estimator for 100 to 400 sq ft, surcharge included) plus $124.00 for each electrical, plumbing or mechanical trade permit if billed separately.
$643.65estimated city fees at the inputs above
Line
How it is computed
Amount
Building Alterations permit (estimator, incl. 2.5%)
The page's own example: “Remodel with new circuits and a relocated sink: $395.65 + $124.00 + $124.00 = $643.65.”
Not included: Remodels near 950 sq ft (the estimator returned $406.72); plan revision fees (10%, minimum $120) and $120 re-inspections. The estimator is guidance only; trade permits may be billed on top and the city publishes no combined figure.
Source: City fee estimator (Building Alterations) and Trade Permit Fee Schedule. Read the Tampa kitchen remodel permit page, which quotes the rule and records when it was last verified (Nov 2026).
Tampa electrical panel permit fee
A panel replacement or service upgrade is an electrical trade permit, a flat $120 plus the state surcharge at its $4.00 minimum, $124.00, whatever the amperage.
$124estimated city fees at the inputs above
Line
How it is computed
Amount
Electrical trade permit (Service Upgrade)
flat
$120
Florida Building Permit Surcharge (2.5%, $4.00 minimum)
2.5% of $120 (minimum $4)
$4
The page's own example: “Every permit carries the 2.5% Florida Building Permit Surcharge with a $4.00 minimum, so the total is $120 + $4.00 = $124.00”
Not included: The $120 re-inspection fee plus surcharge and the $41 permit extension; the electrician's charges.
An AC or heat pump change-out is a mechanical trade permit, $120 plus the state surcharge at its $4.00 minimum, $124.00; wiring changes may also need a $124.00 electrical trade permit.
$124estimated city fees at the inputs above
Line
How it is computed
Amount
Mechanical trade permit (HVAC equal change-out)
flat
$120
Florida Building Permit Surcharge (2.5%, $4.00 minimum)
2.5% of $120 (minimum $4)
$4
The page's own example: “The Florida Building Permit Surcharge is 2.5% with a $4.00 minimum, so the total is $120 + $4.00 = $124.00, the figure the city's estimator returns.”
Not included: The re-inspection fee ($120 plus surcharge); duct replacement (the page says it probably needs its own permit; confirm with the city).
Source: Trade Permit Fee Schedule (residential). Read the Tampa hvac permit page, which quotes the rule and records when it was last verified (Nov 2026).
Tampa adu permit fee
ADUs are allowed only in four areas; the city's estimator prices them by project type and size, about $396 to $1,159 in building fees. Impact, mobility, water and school fees are extra; the estimator warns other fees may be added.
What the city page states: Detached new ADU, 600 sq ft: $995.28; 950 sq ft: $1,016.80.
Not computed here: The page gives the estimator's totals at a few sizes for conversions, detached ADUs and additions, but not the schedule behind them, and the addition totals jump unevenly ($510 at 400 sq ft, $1,144.57 at 600).
City fees only, on the ordinary residential path each page prices: the building or trade permit plus the mandatory lines the city adds to it. It leaves out whatever the page says is separate (a designer's fee, a contractor's licence, a utility connection) and anything the page does not price. Fee schedules change on the city's budget cycle; the month each page was last verified is Nov 2026, and the verification method explains how changes are caught.
Frequently asked questions
The arithmetic: $177 × 1.025 = $181.43.. A shed of 120 sq ft or less is exempt; a larger shed up to 500 sq ft pays the flat $177 accessory-structure fee plus the 2.5% state surcharge, $181.43.
The arithmetic: $475 × 1.025 = $486.88, which is the total the city's fee estimator returns ($194.75 plan review, $292.13 remainder).. A masonry privacy or retaining wall pays the flat $475 Privacy/Retaining Wall fee plus the 2.5% state surcharge, $486.88; the city publishes no fee line for wood, vinyl or chain-link fences.
With the 2.5% Florida Building Permit Surcharge: $177 × 1.025 = $181.43.. Every deck needs a Residential Miscellaneous permit, a flat $177 (Accessory Structure) or $214 (Driveway, Patio Slab, Deck) as the city assigns the category (the schedule does not say which applies, so ask Construction Services), plus the 2.5% state surcharge.
$716 × 1.025 = $733.90, the total the city's fee estimator returns ($293.56 plan review, $440.34 remainder).. A pool pays a flat $716 (in-ground) or $292 (above-ground) plus the 2.5% state surcharge; a screen cage adds $316 plus surcharge.
every permit carries the 2.5% Florida Building Permit Surcharge: $177 × 1.025 = $181.43. Roof work of 500 sq ft or less is exempt; above that a roofing trade permit is a flat $177 plus the 2.5% state surcharge, $181.43, regardless of size or price.
Every line is read off the Tampa permit pages on this site, which quote the city's own fee schedule, bulletin or ordinance and record the month the sources were last verified (Nov 2026). The calculator holds no fee of its own.