City fee lines from the San Diego permit pages, computed for your project. Sourced, verified Sep 2026.
Verified Sep 2026Calculator
This calculator applies the fee lines quoted on the San Diego permit pages: the city's own plan review, permit and surcharge figures, as published by the City of San Diego Development Services Department. Pick a project, change the inputs, and the breakdown shows each line and how it is computed. 10 of 10 project types have a computable formula on their page; the rest show the page's own figure.
Fees are flat lines on Information Bulletin 501 (plan-reviewed projects) or IB 103 (no-plan Simple Permits), not valuation-based.
Plan-reviewed projects add the General Plan Maintenance Fee and a mapping fee; Simple Permits do not.
State fees (13 cents per $1,000 of valuation and $1 per $25,000) are added at issuance and are not modeled.
San Diego shed permit fee
A shed over 120 sq ft of roof area pays the IB 501 Garage/Storage line: flat plan check, hourly inspection and two fixed city fees.
Exempt: No building permit for a one-story detached shed or playhouse with a projected roof area of 120 sq ft or less (SDMC 129.0203(a)(1)).
$2,427.42estimated city fees at the inputs above
Line
How it is computed
Amount
Plan check (Garage/Storage line)
flat
$1,501.42
Inspection
1 hours × $176.84
$176.84
General Plan Maintenance Fee
flat
$737
Mapping fee
flat
$12.16
The page's own example: “So a 200-square-foot workshop that needs one inspection hour comes to about $1,501.42 + $737.00 + $12.16 + $176.84 = $2,427.42”
Not included: Electrical, plumbing or mechanical permits for utilities in the shed; state strong-motion and building standards fees; the 2.5-hour impact-fee assessment charge the page says to ask DSD about.
Source: Information Bulletin 501, Table 501C, Garage/Storage line. Read the San Diego shed permit page, which quotes the rule and records when it was last verified (Sep 2026).
San Diego fence permit fee
Fences of 7 ft or less need no permit; a taller fence pays IB 501 plan check and inspection per 100 linear feet plus two fixed city fees.
$3,309.87estimated city fees at the inputs above
Line
How it is computed
Amount
Plan check
$2,031
$2,031
Inspection
$529.71
$529.71
General Plan Maintenance Fee
flat
$737
Mapping fee
flat
$12.16
The page's own example: “A 100-foot fence over 7 feet is therefore about $2,031.00 + $529.71 + $737.00 + $12.16 = $3,309.87”
Not included: Fences of 7 ft or less (no permit, height is not an input); the cheaper City standard drawing line; state fees; the engineer's design fee.
Source: Information Bulletin 501, Table 501C, fence line. Read the San Diego fence permit page, which quotes the rule and records when it was last verified (Sep 2026).
San Diego deck permit fee
An attached deck, or any deck over 200 sq ft or 30 in high, pays the IB 501 Deck line (flat up to 500 sq ft, a higher flat line above) plus two fixed city fees.
$2,691.40estimated city fees at the inputs above
Line
How it is computed
Amount
Plan check
$1,677.99
$1,677.99
Inspection
$264.25
$264.25
General Plan Maintenance Fee
flat
$737
Mapping fee
flat
$12.16
The page's own example: “A 300-square-foot attached deck therefore costs about $1,677.99 + $264.25 + $737.00 + $12.16 = $2,691.40”
Not included: The cheaper City pre-approved plan line; state strong-motion and building standards fees; the impact-fee assessment charge the page says to confirm with DSD; the designer's or engineer's fee.
Source: Information Bulletin 501, Table 501C, Deck line. Read the San Diego deck permit page, which quotes the rule and records when it was last verified (Sep 2026).
San Diego pool permit fee
An in-ground pool pays a flat IB 501 plan check (master-plan or custom line) and inspection plus two fixed city fees; prefab above-ground pools of 5,000 gallons or less are exempt.
$2,250.60estimated city fees at the inputs above
Line
How it is computed
Amount
Plan check, City master-plan pool
flat
$971.73
Inspection
flat
$529.71
General Plan Maintenance Fee
flat
$737
Mapping fee
flat
$12.16
The page's own example: “So a master-plan pool comes to about $971.73 + $529.71 + $737.00 + $12.16 = $2,250.60”
Not included: State strong-motion and building standards fees; the impact-fee assessment charge the page says to ask DSD about; the engineer's stamp and any geotechnical report.
Source: Information Bulletin 501, Table 501C, pool lines. Read the San Diego pool permit page, which quotes the rule and records when it was last verified (Sep 2026).
San Diego roof replacement permit fee
A like-for-like reroof needs no permit; a re-sheathing job pays hourly plan check, a flat inspection and two fixed city fees.
$1,367.09estimated city fees at the inputs above
Line
How it is computed
Amount
Plan check (hourly, re-sheathing)
2 hours × $176.84
$353.68
Inspection
flat
$264.25
General Plan Maintenance Fee
flat
$737
Mapping fee
flat
$12.16
The page's own example: “a re-sheathing permit with two plan check hours is about $353.68 + $264.25 + $737.00 + $12.16 = $1,367.09”
Not included: An ordinary reroof that leaves the structure alone needs no permit ($0). The roof structure replacement line ($1,942.13 plan check per 2,000 sq ft) is not modeled; state fees are added at issuance.
Source: Information Bulletin 501, Table 501C, Roof re-sheathing line. Read the San Diego roof replacement permit page, which quotes the rule and records when it was last verified (Sep 2026).
San Diego bathroom remodel permit fee
A bathroom remodel that adds no fixtures and leaves framing and exterior walls alone takes a flat No-Plan Building Permit covering all trades; same-spot swaps need no permit; a remodel that needs plans pays the IB 501 Addition/Remodel line instead, about $6,490.37.
$440.82estimated city fees at the inputs above
Line
How it is computed
Amount
No-Plan Building Permit (per dwelling unit)
flat
$440.82
The page's own example: “A no-plan bathroom remodel permit is $440.82 per dwelling unit and covers the plumbing, mechanical and electrical work”
Not included: State fees, the $17.11 collection charge and the $58.00 lead hazard fee on pre-1978 homes; the per-square-foot Addition/Remodel lines above 500 sq ft; standalone trade permits, which are alternatives, not add-ons.
A kitchen remodel that adds no fixtures or gas appliances and leaves framing and exterior walls alone takes a flat No-Plan Building Permit covering all trades; cabinets, counters and finishes need no permit; a remodel that needs plans pays the IB 501 Addition/Remodel line instead, about $6,490.37.
$440.82estimated city fees at the inputs above
Line
How it is computed
Amount
No-Plan Building Permit (per dwelling unit)
flat
$440.82
The page's own example: “A no-plan kitchen remodel permit is $440.82 per dwelling unit and covers the plumbing, mechanical and electrical work”
Not included: State fees, the $17.11 collection charge and the $58.00 lead hazard fee on pre-1978 homes; the per-square-foot Addition/Remodel lines above 500 sq ft; standalone trade permits, which are alternatives, not add-ons.
A panel replacement or upgrade up to 200 amps is a flat $176.57 online Electrical Simple Permit; a 225 to 400 amp service uses the $353.13 line; no plan check fees.
$176.57estimated city fees at the inputs above
Line
How it is computed
Amount
Panel Replace/Upgrade up to 200 amp
flat
$176.57
The page's own example: “A typical 100-to-200-amp upgrade is therefore about $176.57 in city fees”
Not included: Services over 400 amps need plans; small non-refundable records fees on the invoice.
HVAC equipment replacement is an online Mechanical Simple Permit priced per item on IB 103 Table 1B, with no plan check fees.
$308.09estimated city fees at the inputs above
Line
How it is computed
Amount
Furnace, forced-air unit, heat pump package or first air handler optional
flat
$176.57
Condensing unit optional
flat
$131.52
Each additional air handler or head
0 units × $52.39
$0
The page's own example: “a full furnace-and-condenser change-out about $308.09”
Not included: The HERS rater's fee; small non-refundable records fees; structural or plan permits for heavy rooftop units or historic properties.
Source: Information Bulletin 103, Table 1B. Read the San Diego hvac permit page, which quotes the rule and records when it was last verified (Sep 2026).
San Diego adu permit fee
A detached ADU up to 500 sq ft pays the IB 501 Addition/Remodel line and a larger one the new single-dwelling line, plus the General Plan Maintenance Fee and a mapping fee.
$6,490.37estimated city fees at the inputs above
Line
How it is computed
Amount
Plan check
$3,512.92
$3,512.92
Inspection
$2,228.29
$2,228.29
General Plan Maintenance Fee
flat
$737
Mapping fee
flat
$12.16
The page's own example: “a 500-square-foot detached ADU is about $3,512.92 + $2,228.29 + $737.00 + $12.16 = $6,490.37”
Not included: Attached ADUs and JADUs ($6.98 and $4.46 per sq ft over 500); state fees, the $442.10 impact-fee assessment charge and $17.11 collection charge; school fees, which the school district sets.
Source: Information Bulletin 501, Table 501A. Read the San Diego adu permit page, which quotes the rule and records when it was last verified (Sep 2026).
What the estimate covers
City fees only, on the ordinary residential path each page prices: the building or trade permit plus the mandatory lines the city adds to it. It leaves out whatever the page says is separate (a designer's fee, a contractor's licence, a utility connection) and anything the page does not price. Fee schedules change on the city's budget cycle; the month each page was last verified is Sep 2026, and the verification method explains how changes are caught.
Frequently asked questions
So a 200-square-foot workshop that needs one inspection hour comes to about $1,501.42 + $737.00 + $12.16 + $176.84 = $2,427.42. A shed over 120 sq ft of roof area pays the IB 501 Garage/Storage line: flat plan check, hourly inspection and two fixed city fees.
A 100-foot fence over 7 feet is therefore about $2,031.00 + $529.71 + $737.00 + $12.16 = $3,309.87. Fences of 7 ft or less need no permit; a taller fence pays IB 501 plan check and inspection per 100 linear feet plus two fixed city fees.
A 300-square-foot attached deck therefore costs about $1,677.99 + $264.25 + $737.00 + $12.16 = $2,691.40. An attached deck, or any deck over 200 sq ft or 30 in high, pays the IB 501 Deck line (flat up to 500 sq ft, a higher flat line above) plus two fixed city fees.
So a master-plan pool comes to about $971.73 + $529.71 + $737.00 + $12.16 = $2,250.60. An in-ground pool pays a flat IB 501 plan check (master-plan or custom line) and inspection plus two fixed city fees; prefab above-ground pools of 5,000 gallons or less are exempt.
a re-sheathing permit with two plan check hours is about $353.68 + $264.25 + $737.00 + $12.16 = $1,367.09. A like-for-like reroof needs no permit; a re-sheathing job pays hourly plan check, a flat inspection and two fixed city fees.
Every line is read off the San Diego permit pages on this site, which quote the city's own fee schedule, bulletin or ordinance and record the month the sources were last verified (Sep 2026). The calculator holds no fee of its own.