City fee lines from the Philadelphia permit pages, computed for your project. Sourced, verified Sep 2026.
Verified Sep 2026Calculator
This calculator applies the fee lines quoted on the Philadelphia permit pages: the city's own plan review, permit and surcharge figures, as published by the Philadelphia Department of Licenses and Inspections. Pick a project, change the inputs, and the breakdown shows each line and how it is computed. 10 of 10 project types have a computable formula on their page; the rest show the page's own figure.
Every building and trade permit adds a $3 city and a $4.50 state surcharge ($7.50); zoning approvals carry none.
The $25 (one- or two-family) filing fee is applied to the permit balance, so it is not an extra charge.
Philadelphia shed permit fee
A shed up to 130 sq ft in the rear yard needs no permit; the same shed in a side or front yard needs a $189 zoning permit, and sheds over 130 sq ft are refused by zoning.
$189estimated city fees at the inputs above
Line
How it is computed
Amount
Zoning permit (side or front yard shed)
flat
$189
The page's own example: “Same shed placed in the side or front yard | Zoning permit ($189 plus $25 filing applied to it)”
Not included: A rear-yard shed up to 130 sq ft costs nothing; sheds over 130 sq ft need a ZBA variance (fee not given) and over 200 sq ft a $75 building permit plus $7.50 surcharges; electrical permits for wiring.
Source: L&I zoning fee summary PZ_008 (July 2026). Read the Philadelphia shed permit page, which quotes the rule and records when it was last verified (Sep 2026).
Philadelphia fence permit fee
Fences up to 6 ft in side or rear yards need no permit; a front fence over 4 ft or more than 50% solid needs a $50 zoning permit, and over 6 ft adds a $69 building permit plus $7.50 in surcharges.
$50estimated city fees at the inputs above
Line
How it is computed
Amount
Zoning permit (front-yard fence over 4 ft or over 50% opaque, or any fence over 6 ft) optional
flat
$50
The page's own example: “So a 5-foot front fence costs $50 in zoning fees”
Not included: A Zoning Board of Adjustment appeal for fences over the 6 ft zoning cap (fee not given); contractor fees.
Source: L&I fence permit page, one- or two-family fees. Read the Philadelphia fence permit page, which quotes the rule and records when it was last verified (Sep 2026).
Philadelphia deck permit fee
A new deck needs a building permit ($75 for the first 500 sq ft plus $56 per additional 100) and a $189 residential zoning permit, plus $7.50 in surcharges on the building permit.
$271.50estimated city fees at the inputs above
Line
How it is computed
Amount
Building permit
$75
$75
Residential zoning permit
flat
$189
City and state surcharges
flat
$7.50
The page's own example: “a typical EZ deck comes to $75 + $189 + $7.50 = $271.50”
Not included: An electrical permit for deck lighting ($25 per $1,000, $63 minimum); replacing boards only is a separate $63 flooring permit.
Source: L&I construction and zoning fee summaries; EZ Deck standard PB_018. Read the Philadelphia deck permit page, which quotes the rule and records when it was last verified (Sep 2026).
Philadelphia pool permit fee
A pool deeper than 24 in pays a $69 building permit plus an electrical permit at $25 per $1,000 of electrical cost ($63 minimum), each with $7.50 in surcharges.
$147estimated city fees at the inputs above
Line
How it is computed
Amount
Building permit
flat
$69
Surcharges, building permit
flat
$7.50
Electrical permit
2 × $25 per 1,000 $ or fraction (minimum $63)
$63
Surcharges, electrical permit
flat
$7.50
The page's own example: “so the two permits total $76.50 + $70.50 = $147”
Not included: A plumbing permit for permanent fill or drain lines; the licensed electrical inspection agency's fee; prefab pools under 24 in deep and 5,000 gallons need no building permit.
Source: L&I construction fee summary; EZ Pools and Spas standard PB_010. Read the Philadelphia pool permit page, which quotes the rule and records when it was last verified (Sep 2026).
Philadelphia roof replacement permit fee
Replacing the roof covering on a one- or two-family home is an EZ permit at a $69 flat fee plus $7.50 in surcharges.
$76.50estimated city fees at the inputs above
Line
How it is computed
Amount
EZ roof covering permit
flat
$69
City and state surcharges
flat
$7.50
The page's own example: “Every permit also carries the $3 city and $4.50 state surcharges, so the EZ reroof costs $76.50”
Not included: Repairs related to regular maintenance need no permit; the alternative alteration fee of 2% of construction cost ($253 minimum) the applicant may ask for.
A same-footprint bathroom remodel in a one-family home runs on a $50 EZ plumbing permit (first 7 fixtures) plus an electrical permit at $25 per $1,000 of electrical cost ($63 minimum), each with $7.50 in surcharges.
$128estimated city fees at the inputs above
Line
How it is computed
Amount
EZ plumbing permit (first 7 fixtures)
flat
$50
Surcharges, plumbing permit
flat
$7.50
Electrical permit optional
2 × $25 per 1,000 $ or fraction (minimum $63)
$63
Surcharges, electrical permit optional
flat
$7.50
The page's own example: “bringing the typical EZ remodel to about $128”
Not included: A bathroom over 500 sq ft adds $56 per 100 sq ft to the building permit; the electrical inspection agency's fee.
Source: L&I construction fee summary; EZ Bathroom and Kitchen standard PB_026. Read the Philadelphia bathroom remodel permit page, which quotes the rule and records when it was last verified (Sep 2026).
Philadelphia kitchen remodel permit fee
A same-footprint kitchen remodel in a one-family home runs on an EZ plumbing permit ($50 for the first 7 fixtures, $22.50 each above) plus an electrical permit at $25 per $1,000 of electrical cost ($63 minimum), each with $7.50 in surcharges.
$140estimated city fees at the inputs above
Line
How it is computed
Amount
EZ plumbing permit (first 7 fixtures)
flat
$50
Each fixture above 7
0 fixtures × $22.50 (first 7 fixtures free)
$0
Surcharges, plumbing permit
flat
$7.50
Electrical permit optional
3 × $25 per 1,000 $ or fraction
$75
Surcharges, electrical permit optional
flat
$7.50
The page's own example: “A typical same-footprint remodel therefore costs about $140 in city permits.”
Not included: A kitchen over 500 sq ft adds $56 per 100 sq ft to the building permit; the electrical inspection agency's fee.
Source: L&I construction fee summary; EZ Bathroom and Kitchen standard PB_026. Read the Philadelphia kitchen remodel permit page, which quotes the rule and records when it was last verified (Sep 2026).
Philadelphia electrical panel permit fee
A panel or service job up to 200 A takes an EZ electrical permit at $25 per $1,000 or fraction of electrical cost, $63 minimum, plus $7.50 in surcharges.
$82.50estimated city fees at the inputs above
Line
How it is computed
Amount
Electrical permit
3 × $25 per 1,000 $ or fraction
$75
City and state surcharges
flat
$7.50
The page's own example: “A $4,000 service upgrade from 100 to 200 amps, with new service conductors, meter base and outdoor disconnect, pays $100 + $7.50 = $107.50.”
Not included: The licensed electrical inspection agency's fee; PECO's service and meter application; $150 rough-in approval if requested.
Source: L&I electrical permit page and EZ Residential Service Equipment standard PB_028. Read the Philadelphia electrical panel permit page, which quotes the rule and records when it was last verified (Sep 2026).
Philadelphia hvac permit fee
Replacing HVAC appliances in a one- or two-family home is an EZ mechanical permit at $69 per appliance, or $189 flat for ductwork including its appliances, plus $7.50 in surcharges; a new circuit adds an electrical permit.
$76.50estimated city fees at the inputs above
Line
How it is computed
Amount
Mechanical permit, $69 per appliance
1 units × $69
$69
City and state surcharges
flat
$7.50
The page's own example: “So a straight condenser or furnace swap is $76.50”
Not included: Fuel gas piping systems and equipment ($189 flat) when a furnace swap alters the gas piping; the electrical inspection agency's fee.
Source: L&I mechanical permit page and construction fee summary. Read the Philadelphia hvac permit page, which quotes the rule and records when it was last verified (Sep 2026).
Philadelphia adu permit fee
An ADU conversion pays a $189 use registration, a building alteration permit ($76 for the first 500 sq ft plus $56 per 100), and plumbing, electrical and mechanical permits, each permit with $7.50 in surcharges.
$533estimated city fees at the inputs above
Line
How it is computed
Amount
Building alteration permit
$76 + 1 × $56 per 100 above 500
$132
Surcharges, building permit
flat
$7.50
Zoning use registration
flat
$189
Plumbing permit (first 7 fixtures)
flat
$50
Surcharges, plumbing permit
flat
$7.50
Electrical permit
2 × $25 per 1,000 $ or fraction (minimum $63)
$63
Surcharges, electrical permit
flat
$7.50
Mechanical permit, stand-alone appliance
flat
$69
Surcharges, mechanical permit
flat
$7.50
The page's own example: “A small 600-square-foot conversion at the electrical minimum with a ductless unit totals $139.50 + $189 + $57.50 + $70.50 + $76.50 = $533.”
Not included: The licensed electrical inspection agency's fee; design fees; recording the owner-occupancy deed restriction.
Source: L&I construction and zoning fee summaries; ADU checklist PZ_004. Read the Philadelphia adu permit page, which quotes the rule and records when it was last verified (Sep 2026).
What the estimate covers
City fees only, on the ordinary residential path each page prices: the building or trade permit plus the mandatory lines the city adds to it. It leaves out whatever the page says is separate (a designer's fee, a contractor's licence, a utility connection) and anything the page does not price. Fee schedules change on the city's budget cycle; the month each page was last verified is Sep 2026, and the verification method explains how changes are caught.
Frequently asked questions
Same shed placed in the side or front yard | Zoning permit ($189 plus $25 filing applied to it). A shed up to 130 sq ft in the rear yard needs no permit; the same shed in a side or front yard needs a $189 zoning permit, and sheds over 130 sq ft are refused by zoning.
So a 5-foot front fence costs $50 in zoning fees. Fences up to 6 ft in side or rear yards need no permit; a front fence over 4 ft or more than 50% solid needs a $50 zoning permit, and over 6 ft adds a $69 building permit plus $7.50 in surcharges.
a typical EZ deck comes to $75 + $189 + $7.50 = $271.50. A new deck needs a building permit ($75 for the first 500 sq ft plus $56 per additional 100) and a $189 residential zoning permit, plus $7.50 in surcharges on the building permit.
so the two permits total $76.50 + $70.50 = $147. A pool deeper than 24 in pays a $69 building permit plus an electrical permit at $25 per $1,000 of electrical cost ($63 minimum), each with $7.50 in surcharges.
Every permit also carries the $3 city and $4.50 state surcharges, so the EZ reroof costs $76.50. Replacing the roof covering on a one- or two-family home is an EZ permit at a $69 flat fee plus $7.50 in surcharges.
Every line is read off the Philadelphia permit pages on this site, which quote the city's own fee schedule, bulletin or ordinance and record the month the sources were last verified (Sep 2026). The calculator holds no fee of its own.