This calculator applies the fee lines quoted on the Tulsa permit pages: the city's own plan review, permit and surcharge figures, as published by the Tulsa Development Services Department. Pick a project, change the inputs, and the breakdown shows each line and how it is computed. 9 of 10 project types have a computable formula on their page; the rest show the page's own figure.
- Title 49 (the July 2024 schedule, Ordinance 25351) prices a building permit by the value of the work: $133 up to $5,000, $213 from $5,000.01 to $40,000, and $6 per $1,000 from $40,000 to $150,000. The pages read Section 302.B as $6 per $1,000 of the whole valuation; the ordinance gives no worked example, so confirm the total with the Permit Center. The pages print only whole-thousand examples, so a part of $1,000 counted as a whole $1,000 is this calculator's assumption.
- The building application fee ($64 on a declared value up to $15,000, $98.50 from $15,000.01 to $100,000, $0.97 per $1,000 above $100,000) is paid when you apply and credited against the permit fee, so it is not added on top here.
- Every permit also carries the $5 system surcharge (Section 103) and a system development fee of $5.50 plus 8 percent of the permit fee (Section 117); building permits add the $4 state code fee plus 50 cents (Section 100), which may also apply to trade permits. Most pages' worked totals are before these add-ons, so the calculator shows them as lines you switch on and leaves them out of the total until ticked.
- Title 49 sets an $80 minimum for any permit. On a literal reading it also lifts the $75.50 zoning clearance and a small mechanical permit to $80; the pages say to ask the Permit Center.
- A Title 49 amendment on the City Council's May 2026 agendas would raise the building tiers to $137, $219 and $6.18 per $1,000; the posted copy is an unsigned packet with blank adoption lines, so the calculator uses the July 2024 schedule.
- The ADU page prices the condenser at $35 (furnace, condenser and ducts at $35 each), while the HVAC page gives $47 for refrigeration or $35 as other mechanical equipment; the city does not say which applies, so the ADU mechanical permit could be $12 higher.
- Work started before a required permit costs a penalty of $214 or 3 times the fee, whichever is greater; a re-inspection is $75 and a plan resubmittal $100.
Tulsa shed permit fee
Every Tulsa shed needs a $75.50 zoning clearance; a shed over 200 sq ft, or one within 5 feet of another structure, needs a building permit instead, $133 up to $5,000 of value and $213 to $40,000. The Title 49 add-ons (the $5 surcharge, the Section 117 fee and the state code fee) are left out of the total until you tick them.
| Line | How it is computed | Amount |
|---|---|---|
| Zoning clearance (shed up to 200 sq ft, 5 ft from other structures) | flat | $75.50 |
Tulsa fence permit fee
Every Tulsa fence needs a permit: a $75.50 zoning clearance up to 7 feet, or a building permit priced on value above 7 feet ($133 up to $5,000, $213 to $40,000). The Title 49 add-ons (the $5 surcharge, the Section 117 fee and the state code fee) are left out of the total until you tick them.
| Line | How it is computed | Amount |
|---|---|---|
| Zoning clearance (fence up to 7 ft) | flat | $75.50 |
Tulsa deck permit fee
Tulsa publishes no small-deck exemption, so a deck takes a building permit priced on its value: $133 up to $5,000, $213 to $40,000, then $6 per $1,000 to $150,000. The Title 49 add-ons (the $5 surcharge, the Section 117 fee and the state code fee) are left out of the total until you tick them.
| Line | How it is computed | Amount |
|---|---|---|
| Building permit (Title 49, Section 302) | $NaN + 45 × $6 per 1,000 above 0 | $270 |
Tulsa pool permit fee
Every Tulsa pool except a prefabricated pool less than 2 feet deep needs a building permit priced on value ($133 up to $5,000, $213 to $40,000, $6 per $1,000 to $150,000), plus a flat $235 electrical permit for the pool's wiring. The Title 49 add-ons (the $5 surcharge, the Section 117 fee and the state code fee) are left out of the total until you tick them.
| Line | How it is computed | Amount |
|---|---|---|
| Building permit (Title 49, Section 302) | $NaN + 45 × $6 per 1,000 above 0 | $270 |
| Pool electrical permit (Section 404) optional | flat | $235 |
Tulsa roof replacement permit fee
Tulsa publishes no reroofing rule, so ask the Permit Center first; if a repair or alteration permit is required, it uses the Title 49 building fee, $133 up to $5,000 of value and $213 to $40,000.
What the city page states: A $4,500 patch-and-overlay repair is $133. A $14,000 tear-off and reshingle is $213, as is a $28,000 metal roof.
Tulsa bathroom remodel permit fee
Tile, paint and minor cabinetry need no Tulsa permit; changed piping takes a plumbing permit ($81 plus $3.31 per extra fixture), new wiring an $81 electrical permit, and moving a wall a building permit for an alteration ($133 up to $5,000 of structural work). The Title 49 add-ons (the $5 surcharge, the Section 117 fee and the state code fee) are left out of the total until you tick them.
| Line | How it is computed | Amount |
|---|---|---|
| Building permit (Title 49, Section 302), alteration | $133 | $133 |
| Plumbing permit optional | $81 + 2 × $3.31 per 1 above 1 | $87.62 |
| Electrical permit ($81 covers 1 to 25 items) optional | $81 | $81 |
Tulsa kitchen remodel permit fee
Cosmetic kitchen work needs no Tulsa permit; new wiring is an $81 electrical permit (1 to 25 items), moved plumbing $81 plus $3.31 per extra fixture, and a removed wall a building permit of $133 up to $5,000 of structural work or $213 to $40,000. The Title 49 add-ons (the $5 surcharge, the Section 117 fee and the state code fee) are left out of the total until you tick them.
| Line | How it is computed | Amount |
|---|---|---|
| Building permit (Title 49, Section 302), alteration | $213 | $213 |
| Plumbing permit optional | $81 + 1 × $3.31 per 1 above 1 | $84.31 |
| Electrical permit optional | $81 | $81 |
Tulsa electrical panel permit fee
A Tulsa panel change or service upgrade needs an electrical permit pulled by a licensed electrician: $98 for the first 100 amps plus $18 per additional 100 amps or portion. The Title 49 add-ons (the $5 surcharge, the Section 117 fee and the state code fee) are left out of the total until you tick them.
| Line | How it is computed | Amount |
|---|---|---|
| Electrical service (Section 404.A) | $98 + 1 × $18 per 100 above 100 | $116 |
Tulsa hvac permit fee
Replacing a furnace, AC or heat pump in Tulsa needs a mechanical permit pulled by a licensed contractor, priced per item under Section 501 with an $80 minimum for any permit; new wiring for the unit is a separate $81 electrical permit. The Title 49 add-ons (the $5 surcharge, the Section 117 fee and the state code fee) are left out of the total until you tick them.
| Line | How it is computed | Amount |
|---|---|---|
| Heating appliance (furnace) optional | flat | $35 |
| AC condenser as refrigeration | flat | $47 |
Tulsa adu permit fee
A Tulsa ADU is a building permit priced on structure-only value plus electrical, plumbing and mechanical permits and a certificate of occupancy; in RE, RS, AG and AG-R districts it first needs a $950 Board of Adjustment special exception. The Title 49 add-ons (the $5 surcharge, the Section 117 fee and the state code fee) are left out of the total until you tick them.
| Line | How it is computed | Amount |
|---|---|---|
| Building permit (Title 49, Section 302) | $NaN + 120 × $6 per 1,000 above 0 | $720 |
| Electrical permit base (up to 2,000 sq ft) | flat | $230 |
| Electrical service (amps) | $98 + 1 × $18 per 100 above 100 | $116 |
| Plumbing permit | $81 + 3 × $3.31 per 1 above 1 | $90.93 |
| Water heater optional | flat | $35 |
| Mechanical permit (furnace, condenser, ducts at $35 each; the HVAC page prices a condenser at $47 as refrigeration or $35 as other equipment) | flat | $105 |
| Certificate of occupancy, $70 new building with a building permit (the city does not say which an ADU is; the page's example uses $70) | flat | $70 |
What the estimate covers
City fees only, on the ordinary residential path each page prices: the building or trade permit plus the mandatory lines the city adds to it. It leaves out whatever the page says is separate (a designer's fee, a contractor's licence, a utility connection) and anything the page does not price. Fee schedules change on the city's budget cycle; the month each page was last verified is Nov 2026, and the verification method explains how changes are caught.
Frequently asked questions
Other city calculators
- Albuquerque, NM
- Aurora, CO
- Austin, TX
- Baltimore, MD
- Boston, MA
- Charlotte, NC
- Chicago, IL
- Cincinnati, OH
- Colorado Springs, CO
- Corpus Christi, TX
- Dallas, TX
- Denver, CO
- El Paso, TX
- Fort Worth, TX
- Fresno, CA
- Honolulu, HI
- Houston, TX
- Indianapolis, IN
- Irvine, CA
- Jacksonville, FL
- Kansas City, MO
- Las Vegas, NV
- Long Beach, CA
- Los Angeles, CA
- Louisville, KY
- Miami, FL
- Milwaukee, WI
- Minneapolis, MN
- Nashville, TN
- New Orleans, LA
- New York City, NY
- Orlando, FL
- Philadelphia, PA
- Phoenix, AZ
- Pittsburgh, PA
- Portland, OR
- Raleigh, NC
- Riverside, CA
- Sacramento, CA
- San Antonio, TX
- San Diego, CA
- San Francisco, CA
- San Jose, CA
- Seattle, WA
- St. Louis, MO
- St. Paul, MN
- Stockton, CA
- Tampa, FL
- Tucson, AZ
- Virginia Beach, VA
- Washington, DC
- Wichita, KS
Related: All cities · Research: fees compared across 30 cities · Tulsa permit guide