Tulsa Permit Fee Calculator

City fee lines from the Tulsa permit pages, computed for your project. Sourced, verified Nov 2026.

Verified Nov 2026Calculator

This calculator applies the fee lines quoted on the Tulsa permit pages: the city's own plan review, permit and surcharge figures, as published by the Tulsa Development Services Department. Pick a project, change the inputs, and the breakdown shows each line and how it is computed. 9 of 10 project types have a computable formula on their page; the rest show the page's own figure.

  • Title 49 (the July 2024 schedule, Ordinance 25351) prices a building permit by the value of the work: $133 up to $5,000, $213 from $5,000.01 to $40,000, and $6 per $1,000 from $40,000 to $150,000. The pages read Section 302.B as $6 per $1,000 of the whole valuation; the ordinance gives no worked example, so confirm the total with the Permit Center. The pages print only whole-thousand examples, so a part of $1,000 counted as a whole $1,000 is this calculator's assumption.
  • The building application fee ($64 on a declared value up to $15,000, $98.50 from $15,000.01 to $100,000, $0.97 per $1,000 above $100,000) is paid when you apply and credited against the permit fee, so it is not added on top here.
  • Every permit also carries the $5 system surcharge (Section 103) and a system development fee of $5.50 plus 8 percent of the permit fee (Section 117); building permits add the $4 state code fee plus 50 cents (Section 100), which may also apply to trade permits. Most pages' worked totals are before these add-ons, so the calculator shows them as lines you switch on and leaves them out of the total until ticked.
  • Title 49 sets an $80 minimum for any permit. On a literal reading it also lifts the $75.50 zoning clearance and a small mechanical permit to $80; the pages say to ask the Permit Center.
  • A Title 49 amendment on the City Council's May 2026 agendas would raise the building tiers to $137, $219 and $6.18 per $1,000; the posted copy is an unsigned packet with blank adoption lines, so the calculator uses the July 2024 schedule.
  • The ADU page prices the condenser at $35 (furnace, condenser and ducts at $35 each), while the HVAC page gives $47 for refrigeration or $35 as other mechanical equipment; the city does not say which applies, so the ADU mechanical permit could be $12 higher.
  • Work started before a required permit costs a penalty of $214 or 3 times the fee, whichever is greater; a re-inspection is $75 and a plan resubmittal $100.

What the estimate covers

City fees only, on the ordinary residential path each page prices: the building or trade permit plus the mandatory lines the city adds to it. It leaves out whatever the page says is separate (a designer's fee, a contractor's licence, a utility connection) and anything the page does not price. Fee schedules change on the city's budget cycle; the month each page was last verified is Nov 2026, and the verification method explains how changes are caught.

Frequently asked questions

A residential zoning clearance permit is $75.50 (Section 303.G).. Every Tulsa shed needs a $75.50 zoning clearance; a shed over 200 sq ft, or one within 5 feet of another structure, needs a building permit instead, $133 up to $5,000 of value and $213 to $40,000. The Title 49 add-ons (the $5 surcharge, the Section 117 fee and the state code fee) are left out of the total until you tick them.
A residential zoning clearance, the permit a typical 6-foot privacy fence needs, is $75.50 (Section 303.G).. Every Tulsa fence needs a permit: a $75.50 zoning clearance up to 7 feet, or a building permit priced on value above 7 feet ($133 up to $5,000, $213 to $40,000). The Title 49 add-ons (the $5 surcharge, the Section 117 fee and the state code fee) are left out of the total until you tick them.
A $45,000 covered deck with a roof is 45 x $6 = $270.. Tulsa publishes no small-deck exemption, so a deck takes a building permit priced on its value: $133 up to $5,000, $213 to $40,000, then $6 per $1,000 to $150,000. The Title 49 add-ons (the $5 surcharge, the Section 117 fee and the state code fee) are left out of the total until you tick them.
A $45,000 gunite pool: 45 x $6 = $270 building fee plus $235 electrical = $505.. Every Tulsa pool except a prefabricated pool less than 2 feet deep needs a building permit priced on value ($133 up to $5,000, $213 to $40,000, $6 per $1,000 to $150,000), plus a flat $235 electrical permit for the pool's wiring. The Title 49 add-ons (the $5 surcharge, the Section 117 fee and the state code fee) are left out of the total until you tick them.
A $4,500 patch-and-overlay repair is $133. A $14,000 tear-off and reshingle is $213, as is a $28,000 metal roof.
Every line is read off the Tulsa permit pages on this site, which quote the city's own fee schedule, bulletin or ordinance and record the month the sources were last verified (Nov 2026). The calculator holds no fee of its own.

Other city calculators

Related: All cities · Research: fees compared across 30 cities · Tulsa permit guide

Stay up to date
Get notified when we add new cities or update permit fees.