What's Required in St. Paul

  • A building permit is required for reroofing and roof repair.
  • Contractors use the Contractor Express roofing permit in PAULIE; owners must use a General Building Permit Application.
  • Roofers working on one- to four-unit residential buildings need a Minnesota residential roofer license.
  • Historic properties and reroofs with structural work need a general building permit with plan review.
  • Notify the area inspector by 9:00 a.m. on the day work starts.
  • Asphalt shingles go on solid sheathing or 1-inch nominal boards installed to the manufacturer's instructions.
  • DSI's 2015 sheet calls for a saddle or cricket behind chimneys wider than 30 inches.
  • Exterior work on a one- or two-family home must be finished within one year of the permit.

Do you need a permit to replace a roof in St. Paul?

Yes. The Department of Safety and Inspections (DSI) requires a building permit to repair or remodel a structure, and reroofing is one of the work types on DSI's Contractor Express building permit: shingle tear-off or overlay, flat roof tear-off or overlay, slate and tile, and roof repair. Express permits need no plan review and are issued online through PAULIE, the city's permit system. Owners cannot use the express application; a homeowner doing their own roof files a General Building Permit Application. So does any reroof on a historic property or one that includes structural work such as new rafters or a new roof structure, which needs plan review.

Who can do the work?

On a residential building of one to four units, a roofing contractor must hold a State of Minnesota residential roofer license; DSI's contractor licensing page says roofing requires it, and the city's express page says no license is required for roofing on buildings of five or more units or on commercial buildings. The homesteading owner of a one- or two-family home may reroof it without a license, signing DSI's homeowner affidavit that they are not improving the property for resale. Under Minnesota law, hiring an unlicensed residential roofer forfeits your access to the state's Contractors' Recovery Fund.

How much does a reroof permit cost?

The fee is set by the job's value under Table A of Legislative Code Section 33.04 ($106 for the first $2,000 plus $21 per additional $1,000 up to $25,000), plus the Minnesota state surcharge of 0.0005 times the value. DSI's express application lists only the basic fee and the surcharge, with no plan check fee, because express work is not plan-reviewed. A $10,000 tear-off: $274 + $5.00 = $279. A $20,000 reroof: $484 + $10.00 = $494. An owner's general permit for work that is plan-reviewed may add 65 percent of the permit fee for plan review: DSI's schedule applies the 65 percent plan check to every valuation over $1,000, while its express page says express items do not require plan review. The 2025 ordinance's up-front payment applies where a plan review fee is required, so on a plan-reviewed owner permit 10 percent of the estimated plan review fee, at least $85 and at most $5,000, must be paid before review begins; the ordinance does not say how it is credited, and it does not reach express permits, which have no plan review. Start work without the permit and the code adds a penalty equal to the permit fee.

What you are doingCity filingRule
Contractor shingle tear-off or overlayContractor Express permitValuation fee + surcharge, no plan review
Flat roof, slate or tile reroofContractor Express permitSame fee basis
Owner reroofing own homeGeneral building permitHomeowner affidavit
Reroof on a historic propertyGeneral building permit + HPCExpress not allowed
Reroof with structural workGeneral building permitPlan review required
Chimney wider than 30 inAsk the inspectorDSI's 2015 sheet calls for a saddle or cricket

What does the inspector check?

Notify the area building inspector when roofing begins, ideally the day before; DSI accepts notice no later than 9:00 a.m. on the day work starts, since roofing depends on the weather (DSI's 2015 sheet). DSI's May 2023 reroofing guideline says Saint Paul administers the 2020 Minnesota Residential Code (based on the 2018 IRC) on one- and two-family homes, which requires asphalt shingles on solid sheathing or 1-inch nominal boards and installation to the manufacturer's instructions; the city allows existing board decks with gaps only where the manufacturer's specifications are met. DSI's 2015 reroofing sheet, citing the 2012 IRC, calls for a saddle or cricket behind chimneys wider than 30 inches; ask the inspector how the current code applies. Multi-family and commercial flat roofs need DSI's commercial reroof checklist with the permit. DSI's older pages still show paper drop-off and an email address for applications, but its PAULIE page says phone, email and mail applications are no longer accepted, so apply in PAULIE. If the job also touches wiring, owner electrical permits are limited to a single-family home or your side of a side-by-side duplex or townhome with rated walls.

How long is the permit good for?

The permit expires if work does not start within 180 days, and exterior work on a one- or two-family dwelling must be completed within one year of issue.

How to Get a Roof Replacement Permit in St. Paul

1

Confirm the permit route

Licensed roofers use the Contractor Express roofing permit; owners and historic properties use the General Building Permit Application.

2

Check the roofer's license

For a one- to four-unit home, confirm your roofer holds a Minnesota residential roofer license before you sign.

3

Apply and pay in PAULIE

Enter the job value and number of roofing squares and pay the valuation fee plus the state surcharge.

4

Notify the inspector

Tell the area building inspector named on the permit when work begins, no later than 9:00 a.m. that day.

5

Finish within a year

Complete the roof and any inspection the inspector requires; exterior work must be done within one year of issue.

Frequently Asked Questions

Yes. Reroofing, including shingle tear-off or overlay and roof repair, requires a building permit. Licensed contractors get it through the Contractor Express permit in PAULIE without plan review; homeowners file a General Building Permit Application.
It is based on the job's value. A $10,000 reroof costs $274 under Table A plus a $5.00 state surcharge, or $279. A $20,000 reroof is $484 plus $10.00, or $494. Owner permits that go through plan review may add a 65 percent plan review fee.
For houses and buildings of one to four units, yes: DSI says roofing requires a State of Minnesota Residential Roofer License. The express page says no license is needed for roofing on buildings with five or more units or on commercial buildings.
Yes, as the homesteading owner of a one- or two-family home. The state license exemption also covers owners who keep the home as a rental, but DSI issues owner permits to the homesteader. File the General Building Permit Application with the Homeowner's Building Permit Affidavit.
Notify the area building inspector when roofing work is to begin, preferably the day before. Because roofing depends on the weather, DSI accepts notice no later than 9:00 a.m. on the day work starts. The inspector is named on your permit.