What's Required in St. Paul
- A building permit is required only for detached sheds and playhouses larger than 200 square feet of floor area.
- Every shed, permitted or not, must meet the zoning code's setback and lot coverage rules.
- Keep accessory buildings at least 3 feet from interior lot lines and 1 foot from an alley right-of-way.
- Buildings closer than 6 feet to the house are treated as attached and must meet the house's setbacks.
- Lots with up to four homes may have three non-dwelling accessory buildings totaling no more than 1,200 square feet.
- Sheds on heritage preservation properties need Heritage Preservation Commission approval.
- Owners pulling their own permit sign DSI's Homeowner's Building Permit Affidavit.
- Any wiring in the shed needs a separate electrical permit.
Do you need a permit for a shed in St. Paul?
Only if it is larger than 200 square feet. The Saint Paul Department of Safety and Inspections (DSI) exempts one-story detached tool and storage sheds, playhouses and similar buildings whose floor area does not exceed 200 square feet. A bigger shed needs a general building permit, the same kind DSI issues for a detached garage. The exemption covers the building permit only: a small shed still has to meet the zoning code's setbacks and lot coverage, and any shed on a Heritage Preservation District property or site needs approval from the Heritage Preservation Commission (HPC), whatever its size.
Where can a shed go on your lot?
Section 63.501 of the zoning code, as DSI summarizes it in its 2024 handout for detached garages, sheds and residential accessory structures, sets these rules:
- Set the shed back at least 3 feet from interior lot lines and at least 1 foot from an alley right-of-way.
- Keep it at least 6 feet from the house, or it counts as attached and must meet the house's setbacks.
- Height in RL to RM2 districts: no more than 15 feet with a flat or shed roof, 18 feet with any other roof style.
- On a lot with up to four homes, you may have at most three non-dwelling accessory buildings, together no more than 1,200 square feet.
- On a corner lot, set it back from the side street as far as the house must be.
How much does a shed permit cost in St. Paul?
A shed over 200 square feet is priced on its value under Table A of Legislative Code Section 33.04: $106 for the first $2,000 plus $21 for each additional $1,000. Add a plan review fee of 65 percent of the permit fee and the Minnesota state surcharge of 0.0005 times the job value. DSI's posted schedule is dated February 25, 2023, and the July 2025 code text printed with Ordinance 25-41 carries the same figures.
Example: a 240 square foot shed valued at $6,000 costs $190 for the permit, $123.50 for plan review and $3.00 surcharge, $316.50 in all. A $10,000 shed costs $274 + $178.10 + $5.00 = $457.10. DSI's schedule applies the 65 percent plan check to every valuation over $1,000; no DSI page names sheds or decks specifically, but its garage schedule shows it on a detached garage. Ten percent of the estimated plan review fee, at least $85 and at most $5,000, must be paid before review begins; the ordinance does not say how it is credited, so the totals above are the schedule's figures. DSI values detached garages at $28 per square foot on its garage schedule and the code ties valuation to state valuation data, so your figure may be set by size rather than your quote.
| What you are doing | City filing | Rule |
|---|---|---|
| Shed of 200 sq ft or less | No building permit | Zoning setbacks and coverage still apply |
| Shed over 200 sq ft | General building permit | Valuation fee + 65% plan review + surcharge |
| Any shed in a heritage district | HPC approval | Required regardless of size |
| Shed closer than 6 ft to the house | Treated as attached | Must meet principal building setbacks |
| Adding power to the shed | Electrical permit | $85 minimum, $15 per circuit |
| Starting work before the permit | Penalty fee | Equal to the permit fee |
Who can pull the permit?
You can, as the homesteading owner of a one- or two-family home, with DSI's Homeowner's Building Permit Affidavit; you do not need a city license to build it yourself. A hired builder must be licensed by the City of Saint Paul or hold a Minnesota residential contractor license, which the city honors. PAULIE has been the city's permit system since September 17, 2025. DSI's older pages still show paper drop-off and an email address for applications, but its PAULIE page says phone, email and mail applications are no longer accepted, so apply in PAULIE. Card payments carry a 2.49% service fee. Owner electrical permits are limited to a single-family home or your side of a side-by-side duplex or townhome with rated walls, and you must do the wiring yourself.
What happens after approval?
For a framed shed DSI's garage procedure is a useful guide: footing or slab inspection before the concrete is poured, framing, then final. You must locate your property markers or hire a surveyor. The permit expires if work does not start within 180 days, and exterior work on a one- or two-family property must be finished within one year.
How to Get a Shed Permit in St. Paul
Measure the floor area
Sheds of 200 square feet or less skip the building permit; check setbacks, height and lot coverage either way.
Draw a site plan
Show the property lines, the house, other accessory buildings and the shed's distances from each, plus construction details for a permitted shed.
Apply in PAULIE
Create a PAULIE account, open the building permit application, attach the plans and the homeowner affidavit if you are the builder, and pay what PAULIE asks at application.
Pay and post the permit
Pay the permit fee, the plan review fee and the state surcharge, then post the permit at the job site.
Schedule inspections
Book footing or slab, framing and final inspections in PAULIE; work must start within 180 days of issue.