What's Required in Orlando
- Building permit mandatory for all accessory structures.
- Must meet rear and side yard setbacks defined in Chapter 58 of City Code.
- HOA approval letter may be required before permit issuance.
- Electrical and plumbing permits required if wiring or sinks are added.
- Recorded Notice of Commencement required if shed cost exceeds $5,000.
- Owner-builders must sign the permit application in person.
What Size Shed Needs a Permit in Orlando
Whether you need a building permit for a shed in Orlando usually comes down to size. Most cities exempt small accessory structures — commonly those under about 120 to 200 square feet — and require a permit for anything larger; Orlando’s exact cutoff is set by the Permitting Services Division, so check the size threshold in the requirements above before you build. A popular 10x12 shed (120 sq ft) sits right at that common dividing line, so it’s worth confirming. Larger sheds, and any shed with electrical, plumbing, or a permanent foundation, almost always need a permit regardless of footprint.
Building a Shed Without a Permit in Orlando
Even when a shed is small enough to skip a building permit in Orlando, “no permit” doesn’t mean “no rules.” A permit-exempt shed generally must stay under the Permitting Services Division’s size threshold, sit on a non-permanent base (sheds on skids or a gravel pad are treated more leniently than those on a poured foundation), and have no electrical or plumbing run to it. Crucially, zoning setbacks still apply — your shed usually has to sit a minimum distance from property lines and other structures, and that holds even for a permit-free shed. Confirm both the size exemption and the setback distance with the Permitting Services Division before you build.
How to Get a Shed Permit in Orlando
Step 1: Check Zoning
Verify allowed shed locations and setbacks for your district.
Step 2: Prepare Site Plan
Draft a scale drawing showing structure dimensions and placement.
Step 3: Portal Submission
Apply online via the Orlando Citizen Access portal.
Step 4: Pay Fees
Submit valuation-based building fees once accepted.
Step 5: Inspections
Includes framing and final inspections; footers if field-built.