What's Required in Orlando
- Electrical permit mandatory for panel upgrades or new circuits.
- Work must comply with the current National Electrical Code (NEC).
- Panel must be accessible with 36 inches of front clearance.
- Circuit directory must be permanently and clearly labeled.
- Notice of Commencement required if project exceeds $2,500.
- Contractor must have a valid Florida state license.
Do You Need a Permit to Upgrade an Electrical Panel in Orlando?
Yes — panel work is one of the least optional permits in Orlando. Replacing or upgrading an electrical panel involves the service equipment for the whole house, so the city wants an inspection on the other side of it. Permit fees typically run $38–$200 through the Permitting Services Division. An unpermitted panel is also one of the first things home inspectors and insurers flag, so the permit protects the resale, not just the wiring.
Upgrading From 100 to 200 Amps in Orlando
The classic project is moving from a 100-amp to a 200-amp service to feed an EV charger, heat pump, or induction range. In Orlando that's a permitted service upgrade like any panel change: permit, inspection, and a licensed electrician doing the work. Because the utility's service connection is involved, plan for coordination with your power company on disconnect and reconnect timing. Inspectors typically verify grounding and bonding, working clearances around the panel, and a properly labeled circuit directory before signing off.
How to Get a Electrical Panel Permit in Orlando
Step 1: Hire Electrician
Licensed contractor pulls the permit on your behalf.
Step 2: Online Filing
Contractor submits the application via the Citizen Access portal.
Step 3: Utility Service
Coordinate with OUC or Duke Energy for service disconnect.
Step 4: Installation
Upgrade the panel and transfer circuits per code.
Step 5: Inspection
Inspector verifies safety before power is fully restored.