What's Required in Riverside

  • Keep an exempt shed to one story, detached, and no more than 120 square feet of floor area.
  • Meet the zoning setbacks for your zone even when the shed needs no building permit.
  • Get Planning Division clearance before submitting a larger shed to Building and Safety.
  • Submit a site plan showing the shed, property lines and existing buildings with a permit application.
  • Get a separate electrical or plumbing permit for any wiring or water line to the shed.
  • Start work within 12 months of issuance; a residential permit becomes invalid if work does not begin in that time.
  • Pay the permit issuance fee, the square-foot fee and the 14% surcharge before the permit is issued.

Do You Need a Permit for a Shed in Riverside?

Not for a small one. Riverside's Building and Safety Division lists work exempt from a permit, and the first item is a one-story detached accessory structure used as a tool or storage shed, playhouse or similar use whose floor area does not exceed 120 square feet. The division's Bulletin 140, issued August 4, 2026, repeats the same limit. A 10 by 12 foot shed is exactly 120 square feet and fits; anything larger needs a building permit.

The exemption is narrow. Bulletin 140 says exempt work must still comply with zoning, fire, floodplain, easement and other rules, and that any associated electrical, plumbing, gas or other nonexempt work needs its own separate permit. A light or outlet run to an exempt shed is an electrical permit even when the shed itself is not.

Riverside Shed Rules by Scenario

What you are doingCity filingRule
Storage shed or playhouse, one story, up to 120 sq ftNoneExempt-work list and Bulletin 140
Shed over 120 sq ftBuilding permitAccessory structure rate, $0.80 per sq ft
Two-story shed or workshop of any sizeBuilding permitExemption covers one-story structures only
Wiring, lights or an outlet to any shedElectrical permitBulletin 140: associated work needs its own permit
Detached garage or carportBuilding permitCity standard garage plan available
Swing set or playground equipmentNoneExempt-work list

How Much Does a Shed Permit Cost in Riverside?

Riverside prices this work from its FY 2026/27 Schedule of Fees and Charges, in effect since July 1, 2026. Each separate permit carries its own $41 issuance fee. On the 14% surcharge (10% General Plan Maintenance plus 4% Technology), the schedule marks only some lines with a caret, the city's fee sheet applies it to all plan check and permit fees, and our examples follow the fee sheet. We read each fee line as plan check and permit combined, our reading of the division's March 2026 fee sheet; the schedule's separate $341 Building Plan Check line may be added, so ask. The schedule prices accessory structures (occupancy U) at $0.80 per square foot for building permit and inspection. Most building permits also need Planning Division clearance first, and the Planning fee for over-the-counter single-family work, which names accessory structures, is $82.

Example, a 200 square foot shed: 200 x $0.80 = $160, plus $41 issuance and $82 planning, $283, plus 14%, about $323. One caution: the division's fee sheet says per-square-foot fees default to set minimums, and it lists a 400 square foot minimum for accessory structures. If that minimum still applies under the new rates, the same shed is priced as 400 x $0.80 = $320, plus $41 and $82, $443, plus 14%, about $505. Ask the counter which applies before you budget.

Where Can a Shed Go on a Riverside Lot?

Setbacks for accessory buildings are in the Zoning Code, Title 19 of the Riverside Municipal Code, which is hosted on Municode; we could not open it from here, so we do not quote a shed setback. The Planning Division's residential zones handout gives the main-house setbacks for each zone, and Planning reviews location before Building and Safety takes the application. Confirm the setback for your zone with the Planner on Duty before you set an exempt shed near a property line.

Who Can Pull the Permit in Riverside?

Riverside issues many permit types to the property owner or an authorized agent, or to an appropriately licensed contractor, who must show a license the city can verify with the Contractors State License Board and hold a current City of Riverside business license. As an owner-builder you initial twelve statements in the city's Property Owner's Package and sign it at the counter, or before a notary if you cannot come to City Hall; if you hire anyone other than licensed contractors on a job worth at least $500 in labor and materials, you may be treated as an employer. Apply on the POSSE-based Public Permit Portal or at the One Stop Shop, 3900 Main Street.

How to Get a Shed Permit in Riverside

1

Measure against the exemption

A one-story detached shed of 120 square feet or less needs no building permit. Larger or two-story sheds need one.

2

Check zoning with Planning

Ask the Planner on Duty at (951) 826-5800 for the setbacks in your zone; Planning clears most permits first.

3

Apply on the portal

Register on the Public Permit Portal and upload a site plan and shed plans, or apply at the One Stop Shop.

4

Pay and receive the permit

Pay the square-foot fee, the $41 issuance fee, the planning fee and the 14% surcharge when the permit is issued.

5

Schedule inspections

Request inspections through the portal. Keep the inspection card with the permit.

Frequently Asked Questions

No building permit, as long as it is one story and detached. A 10 by 12 foot shed is exactly 120 square feet, the largest floor area Riverside's exemption allows for a tool or storage shed or playhouse. It must still meet zoning setbacks, and any wiring to it needs an electrical permit.
Riverside charges $0.80 per square foot for accessory structures, plus a $41 issuance fee, an $82 planning fee for over-the-counter work and a 14% surcharge. A 200 square foot shed is about $323, or $505 if the 400 square foot minimum in the division's fee sheet applies.
A shed that needs a building permit usually does. Riverside says Planning Division clearance is required for most building permit applications before they go to Building and Safety, and the fee schedule's $82 over-the-counter planning fee covers accessory structures. An exempt shed skips the permit but must still meet the zoning rules.
No. Bulletin 140 says any associated electrical, plumbing, mechanical or gas work needs its own permit, even when the structure is exempt. Riverside lists electrical items individually, for example a dedicated circuit at $10 and a light fixture at $11; the electrical permit is a separate permit with its own $41 issuance fee, plus the 14% surcharge.
Yes. Riverside issues many permit types to the property owner or an authorized agent. As an owner-builder you initial and sign the city's Property Owner's Package at the counter or before a notary, and you take responsibility for the work. If you hire unlicensed help on a job worth $500 or more, you may be treated as an employer.