What's Required in Riverside

  • Get a permit for new or replaced plumbing fixtures with new valves, wiring, fans or concealed piping.
  • Install an exhaust fan of at least 50 CFM, ducted to the outside.
  • Provide at least one dedicated 20 amp circuit for the bathroom and GFCI receptacles near each basin.
  • Use toilets of no more than 1.28 gallons per flush and shower heads of no more than 1.8 gallons per minute.
  • Finish shower walls with a smooth, nonabsorbent surface to at least 6 feet above the floor.
  • Bring smoke and carbon monoxide alarms up to code when the permit valuation exceeds $1,000.

Do You Need a Permit to Remodel a Bathroom in Riverside?

Not for finish work alone. Riverside's exempt-work list and the Building and Safety Division's Bulletin 140 exempt painting, papering, tiling, carpeting, cabinets, countertops and similar finish work, so new tile, a new vanity top or paint needs no permit. Bulletin 140 also exempts stopping leaks and clearing stoppages, and removing and reinstalling a toilet when no valves, pipes or fixtures are replaced or rearranged. Replacing a tub, moving a shower drain, adding a fan or a circuit, or replacing concealed piping is different: Bulletin 140 says defective concealed piping that is replaced is new work that requires a permit and inspection.

For an ordinary remodel, the division's Standard Single-Family Kitchen/Bathroom Remodel plan, built on the 2025 California codes, covers interior work in a single-family home of Type VB construction that does not relocate or alter walls, doors or windows. The city's plan-review tier bulletin (Bulletin 137 in its footer; its header reads 102) places residential bath remodels in Tier 0, with a first plan review of 5 working days.

Riverside Bathroom Remodel Rules by Scenario

What you are doingCity filingRule
New tile, paint, vanity top or mirrorNoneExempt finish work
Pulling and resetting the same toiletNoneBulletin 140 plumbing exemption
Replacing a tub or shower with new valvesPlumbing items (permit type set by the counter)Tub/shower $57 each
New exhaust fan or bathroom circuitBuilding permit with electrical and mechanical itemsFan $24, circuit $10
Replacing concealed drain or supply pipingPlumbing permitBulletin 140: treated as new work
Moving a wall or windowBuilding permit with plansStandard plan does not apply

How Much Does a Bathroom Remodel Permit Cost in Riverside?

Riverside prices this work from its FY 2026/27 Schedule of Fees and Charges, in effect since July 1, 2026. Each separate permit carries its own $41 issuance fee. On the 14% surcharge (10% General Plan Maintenance plus 4% Technology), the schedule marks only some lines with a caret, the city's fee sheet applies it to all plan check and permit fees, and our examples follow the fee sheet. We read each fee line as plan check and permit combined, our reading of the division's March 2026 fee sheet; the schedule's separate $341 Building Plan Check line may be added, so ask. Remodels are priced at the R-3 Home Remodels rate of $1.84 per square foot, with fixtures added per item: a toilet (water closet) is $41, a tub or shower $57, a sink $6, a ventilation fan $24 and a dedicated circuit $10.

Example, a 60 square foot bathroom with a new toilet, tub-shower, sink, fan and circuit: 60 x $1.84 = $110.40, plus $138 in fixtures and $41 issuance, $289.40, plus 14%, about $330. The division's fee sheet says per-square-foot fees default to set minimums and lists 100 square feet as the home remodel minimum; if that still applies, the area charge is $184 and the total is $363 plus 14%, about $414. Ask the counter which applies. The schedule lists a $41 issuance fee under each of building, electrical, plumbing and mechanical; if each trade is a separate permit, add $41 for each (about $470 for the 60 sq ft example).

What Does the Standard Plan Require?

Riverside's standard plan requires a bathroom exhaust fan of at least 50 CFM (ductless fans are not accepted), at least one dedicated 20 amp circuit for the bathroom, a GFCI receptacle within 3 feet of each basin, toilets averaging no more than 1.28 gallons per flush, shower heads limited to 1.8 gallons per minute, and smooth, nonabsorbent shower walls to at least 6 feet above the floor. Glazing within 60 inches of a tub or shower floor must be safety glass. Permitted work over $1,000 also triggers the smoke and carbon monoxide alarm retrofit.

Who Can Pull the Permit in Riverside?

Riverside issues many permit types to the property owner or an authorized agent, or to an appropriately licensed contractor, who must show a license the city can verify with the Contractors State License Board and hold a current City of Riverside business license. As an owner-builder you initial twelve statements in the city's Property Owner's Package and sign it at the counter, or before a notary if you cannot come to City Hall; if you hire anyone other than licensed contractors on a job worth at least $500 in labor and materials, you may be treated as an employer. Apply on the POSSE-based Public Permit Portal or at the One Stop Shop, 3900 Main Street.

How to Get a Bathroom Remodel Permit in Riverside

1

Define the scope

Tile, paint and counters need no permit; new valves, drains, fans, circuits or walls do.

2

Fill in the standard plan

Use the city's standard kitchen and bath remodel plan for interior work that keeps walls and windows in place.

3

Apply on the portal

Submit through the Public Permit Portal; bath remodels get a Tier 0 review of 5 working days.

4

Pay the fees

Pay the $1.84 per square foot remodel fee, the fixture fees, the $41 issuance fee and the 14% surcharge.

5

Rough and final inspections

Have the rough plumbing and electrical inspected before walls close, then call for the final.

Frequently Asked Questions

No. Riverside exempts tiling, painting, cabinets, countertops and similar finish work. If you also replace the tub or shower valve, move a drain, add a fan or add a circuit, that part of the job needs a permit.
Removing and reinstalling a toilet is exempt when the repair does not replace or rearrange valves, pipes or fixtures. Installing a new toilet as part of a remodel is a permitted fixture, priced at $41 on Riverside's schedule plus the issuance fee and surcharge. Bulletin 140 does not address swapping in a new toilet; ask the counter.
Riverside charges $1.84 per square foot of remodel area plus fixtures: $41 per toilet, $57 per tub or shower, $6 per sink, $24 per fan and $10 per circuit, then a $41 issuance fee and a 14% surcharge. A 60 square foot bathroom with those five items comes to about $330, or about $414 if a 100 square foot minimum applies.
At least 50 CFM. Riverside's standard kitchen and bath remodel plan requires an exhaust fan of at least 50 CFM in any room with a toilet, tub, shower or spa, and says ductless fans are unacceptable.
Riverside lets owners pull many permit types as owner-builders; ask the counter whether plumbing is included. As an owner-builder you take legal responsibility for the work. If you hire help, Riverside requires a contractor licensed by the Contractors State License Board with a City of Riverside business license.