What's Required in Tulsa

  • A zoning clearance permit is required for every shed, including those under 200 square feet.
  • A building permit is required for a shed over 200 square feet or one closer than 5 feet to another structure.
  • Sheds on skids between 200 and 300 square feet must be blocked and anchored to the city's tie-down detail.
  • Total detached accessory floor area is capped at 500 square feet or 40% of the house in most RS districts.
  • In the rear setback a shed may be one story or 18 feet tall and must sit 3 feet from interior lot lines.
  • The site plan must label and dimension all property lines, easements and setbacks.
  • Electrical work in a shed needs a separate permit pulled by a licensed, registered electrician.

What size shed can you build without a building permit in Tulsa?

Up to 200 square feet. Tulsa's residential building guidelines say no footing or building permit is needed for a one-story detached accessory structure whose floor area does not exceed 200 square feet, as long as it sits at least 5 feet from other structures, projections included. That exemption is only from the building permit: the same sentence says a zoning clearance permit is still required. A 10x12 shed (120 sq ft) is a zoning clearance job. A 12x20 shed (240 sq ft) needs a building permit. Sheds on skids between 200 and 300 square feet must also be blocked and anchored to the city's tie-down detail.

How much does a shed permit cost in Tulsa?

A residential zoning clearance permit is $75.50 (Section 303.G). Title 49 sets an $80 minimum for any permit, which on a literal reading also covers the $75.50 zoning clearance; ask the Permit Center. A building permit starts with a $64 application fee paid when you apply on a declared value up to $15,000, and that fee is credited against the permit fee: $133 when the job is worth up to $5,000 and $213 from $5,000.01 to $40,000. A $4,000 shed kit and slab comes to $133. A $9,000 built-on-site 12x20 comes to $213. Every permit also carries the $5 system surcharge (Section 103) and a system development fee of $5.50 plus 8 percent of the permit fee (Section 117); building permits add the $4 state code fee plus 50 cents (Section 100), which may also apply to trade permits because Section 100 covers every permit for work under the state codes. For a shed over 200 square feet, Title 49 also lists a $75.50 residential zoning clearance fee (Section 303.G) and watershed fees, $64 for a watershed permit application (Section 1201) and $207 for a residential stormwater impact review (Section 1202); Section 306 exempts only storm shelters from zoning and watershed fees, so these are normally added to a building permit. Ask the Permit Center which apply to your job.

One caution on the numbers: a Title 49 amendment filed with the FY2027 budget and placed on the City Council's May 2026 agendas raises the building permit fee to $137 up to $5,000 and $219 up to $40,000. The copy the city posts is an unsigned packet with blank adoption lines, so we show the July 2024 schedule (Ordinance 25351) and the proposed figure side by side. Ask the Permit Center which schedule applies before you pay.

What you are doingCity filingRule
Shed up to 200 sq ft, one story, 5 ft from other buildingsZoning clearance$75.50; no footing or building permit
Shed over 200 sq ftBuilding permit$133 up to $5,000 of value, $213 to $40,000
Shed on skids, 200 to 300 sq ftBuilding permitMust be blocked and anchored
Small shed within 5 ft of the house or garageBuilding permitThe 200 sq ft exemption needs 5 ft of separation
Shed in the rear setbackZoning reviewOne story, 18 ft tall, 3 ft from interior lot lines
Running power to the shedElectrical permitLicensed electrician pulls it
Shed built before the permitPenalty fee$214 or 3 times the fee, whichever is greater

Where can a shed go on a Tulsa lot?

The Tulsa Zoning Code caps the total floor area of all detached accessory buildings. In RS-2, RS-3, RS-4, RS-5, RD, RT and RM districts the limit is 500 square feet or 40% of the house's floor area, whichever is greater; in RE and RS-1 it is 750 square feet or 40%. A shed may sit in the rear setback if it is no more than one story or 18 feet tall, no more than 10 feet to the top plate, and at least 3 feet from interior lot lines.

Who can apply, and how?

You can. Tulsa lets the owner, a contractor, an architect or an authorized agent file a building permit application, and the city offers an affidavit of exemption from the insurance requirement: homeowners building, remodeling or adding to their own single-family or duplex structure can sign the city's affidavit of exemption from the insurance requirement; the city says it does not know whether you are exempt and does not offer an opinion. Apply in the city's Self-Service Portal. Wiring a shed is a separate electrical permit: the city's forms page says only a licensed tradesperson may apply for trade permits, and its 2019 Residential Building Permit Process guide says electrical, mechanical and plumbing permits can be obtained by licensed contractors only.

How to Get a Shed Permit in Tulsa

1

Measure the floor area

Measure the shed's floor area and its distance from the house and other buildings. Up to 200 square feet and 5 feet away means zoning clearance only.

2

Check your zoning district

Look up the district on the city's zoning map and confirm the accessory building area limit and rear setback rules for your lot.

3

Draw the site plan

Show the lot, the house and the shed with its dimensions, and label and dimension all property lines, easements and setbacks.

4

Apply in the Self-Service Portal

File Zoning: Residential for a small shed or Building (Residential), Accessory Structure for a larger one, and pay the application fee.

5

Build and call inspections

Once the permit is issued and paid, build to the approved plan and schedule the inspections the permit lists for a building-permit shed.

Frequently Asked Questions

You need a zoning clearance permit but not a building permit. A 10x12 shed is 120 square feet, under the 200 square foot limit for a one-story detached accessory structure, provided it stands at least 5 feet from other structures. The residential zoning clearance fee is $75.50 under Title 49; its $80 minimum for any permit may also apply, so ask the Permit Center.
200 square feet of floor area, one story, detached, and at least 5 feet from any other structure including projections. Anything larger needs a building permit, and sheds on skids between 200 and 300 square feet must also be blocked and anchored.
Under the July 2024 Title 49 schedule, $133 for a job worth up to $5,000 and $213 from $5,000.01 to $40,000, with the $64 application fee credited. Add the $5 system surcharge, the Section 117 fee of $5.50 plus 8 percent, and the $4.50 state code fee. A May 2026 amendment, posted only as an unsigned packet, would raise the tiers to $137 and $219.
A detached accessory building in the rear setback must stay at least 3 feet from all interior lot lines, be no more than one story or 18 feet tall, and no more than 10 feet to the top plate. Street-side lot lines follow the setbacks for the house.
Title 49 charges a penalty when work starts before a required permit is issued: $214 or three times the regular fee, whichever is greater, on top of the permit fee itself. Paying it does not excuse the shed from meeting the zoning and building rules.