Permit Required? Required
Typical Fee Range $1,529–$2,430 Plus energy code, erosion control and a $450 or $250 assessor charge
Fee Method $0.55/sq ft new or 1.6% of cost + review + trades

What's Required in Milwaukee

  • Only one accessory dwelling unit is allowed per parcel.
  • At least one owner must occupy the existing house as a primary residence when the permit application is submitted.
  • Internal and attached ADUs require a single-family house; detached ADUs may accompany a single- or two-family house.
  • Every ADU needs at least 300 sq ft; internal and attached units may not exceed 1,000 sq ft.
  • Detached ADUs may not exceed 1,300 sq ft or 16% of the lot (whichever is greater), capped at 1,600 sq ft and the size of the largest unit.
  • Detached ADUs need 3-foot side and rear setbacks and 10-foot front-to-back separation from the house.
  • Plans must meet the Wisconsin Uniform Dwelling Code and Milwaukee's building and zoning codes; detached units need site utility plans.
  • Electrical permits must be pulled by a licensed electrician; plumbing by the homeowner or a licensed plumber.

Can you build an ADU in Milwaukee?

Yes. Milwaukee's zoning code lists the accessory dwelling unit as a limited use in every residential district, and the current standards (table 295-505-2.5, in effect since August 2, 2025) allow three types: an internal unit inside the house, an attached unit in an addition, and a detached unit in its own building. The conditions in MCO 295-505-5-f are short:

  • Only one ADU per parcel.
  • Internal and attached ADUs need a single-family house on the parcel; a detached ADU may go with a single-family or two-family house.
  • Owner occupancy: when you apply for the building permit, at least one owner must live in the existing house as a primary residence, shown by 2 documents such as a driver's license, voter registration, tax return or utility bill. The rule does not apply when the ADU and a new house are built at the same time. Miss any of these and the ADU is a prohibited use.

How big can a Milwaukee ADU be?

Every ADU must have at least 300 sq ft. Internal and attached units are capped at 1,000 sq ft and must be smaller than the largest dwelling unit; an internal unit must also sit on one level. A detached unit may have 1,300 sq ft of habitable and parking area, or 16% of the lot area if that is greater, but never more than 1,600 sq ft or the size of the largest dwelling unit. It may be no taller than the house, needs 3-foot side setbacks, a 3-foot rear setback (4 feet from an alley if it has an alley-facing garage door), and must sit 10 feet front-to-back and 5 feet side-to-side from the house, with a paved walk to the street. DNS's ADU sheet still prints a flat 1,300 sq ft cap for detached units; the code allows more on large lots.

How much are ADU permits in Milwaukee?

A detached ADU is billed as new one- or two-family construction: $0.55 per sq ft building permit ($200 minimum), $0.25 per sq ft plan review ($175 minimum), the $65 energy code fee, and erosion control ($250 per lot plus $175 plan review). An internal conversion is an alteration: 1.6% of construction cost plus $0.25 per sq ft review. DNS adds 1.6% to those fees, each permit has a $20 to $25 processing fee, and the city assessor's MCO 81-6 service charge is $450 per new dwelling unit or $250 for an alteration. Electrical, plumbing and HVAC permits are separate.

  • 600 sq ft basement ADU, $45,000 of construction: building side $1,153.92; electrical $192.64; plumbing $106.36; ductwork $75.80. Total $1,528.72.
  • 800 sq ft detached ADU: building, review, energy and erosion fees $1,188.08 with surcharge and processing, plus $450 assessor; electrical $375.52; plumbing $223.20; HVAC $192.64. Total $2,429.44.
What you are doingCity filingRule
Internal ADU (basement or attic)Alteration permit, 1.6% of cost + reviewSingle-family house; owner lives on site
Attached ADU in an additionAddition permit, $0.55/sq ft + reviewUp to 1,000 sq ft; single-family house
Detached ADUNew construction permit + erosion control1,300 sq ft or 16% of lot, max 1,600
Second ADU on the same parcelNot allowedMCO 295-505-5-f-1
ADU when no owner lives on siteProhibited useUnless built together with a new house
Wiring the ADUElectrical permit by a licensed electricianMCO 222; DNS ADU sheet
Plumbing and site utilitiesPlumbing permit; site utility plans for detachedHomeowner or licensed plumber

The building permit may be taken out by the homeowner or by a contractor licensed by the State of Wisconsin and the City. Bring three copies of plans; detached units also need separate site utility plans.

How to Get a ADU Permit in Milwaukee

1

Confirm eligibility

Check that the parcel has the right house type, no existing ADU, and that an owner lives in the house and can document it.

2

Size and site the unit

Fit the unit within the floor area caps, height limit, setbacks and separation distances in table 295-505-2.5.

3

Prepare plans

Have plans drawn to the Uniform Dwelling Code with energy calculations; detached units also need site utility and erosion control plans.

4

Submit for plan review

Submit three copies at the Permit and Development Center, 809 N. Broadway, or through the Land Management System, and pay plan review fees first.

5

Pull trade permits and build

Pay the building permit, have licensed trades pull electrical, plumbing and HVAC permits, start within 180 days and pass final inspections.

Frequently Asked Questions

Yes. Accessory dwelling units are a limited use in every residential zoning district. You may have one per parcel: internal or attached units with a single-family house, or a detached unit with a single-family or two-family house. At least one owner must live in the existing house when you apply for the permit.
Yes, at the time the building permit application is submitted: at least one owner must occupy the existing house as a primary residence, documented by at least 2 items such as a driver's license, voter registration, tax return or utility bill. The requirement does not apply when the ADU is built together with a new house.
Up to 1,300 sq ft of habitable and parking area, or 16% of the lot area if that is greater, but not more than 1,600 sq ft or the floor area of the largest dwelling unit. It must also be no taller than the main house and at least 300 sq ft.
For an 800 sq ft detached ADU, city fees come to about $2,430: $0.55 per sq ft building permit, $0.25 per sq ft plan review, energy code and erosion control fees, a $450 assessor charge, and separate electrical, plumbing and HVAC permits. A 600 sq ft basement conversion runs about $1,530.
You can take out the building permit yourself as the homeowner, and owner-occupants are exempt from the state Dwelling Contractor credentials. Electrical work must be done by a licensed electrician, and plumbing by you only if it is your owner-occupied single-family home; otherwise a licensed plumber must pull it.