What's Required in Los Angeles
- All electrical panel permits in Los Angeles are regulated by the LADBS
- Work must be performed by a licensed California contractor
- Project must comply with Title 24 energy code where applicable
- Structural work requires stamped plans by a licensed engineer
- Permits must be posted visibly on-site during construction
- Final inspection required before project sign-off
Do You Need a Permit to Upgrade an Electrical Panel in Los Angeles?
Yes — panel work is one of the least optional permits in Los Angeles. Replacing or upgrading an electrical panel involves the service equipment for the whole house, so the city wants an inspection on the other side of it. Permit fees typically run $150–$600 through the LADBS. Expect the work itself to be restricted to licensed electricians here. An unpermitted panel is also one of the first things home inspectors and insurers flag, so the permit protects the resale, not just the wiring.
Upgrading From 100 to 200 Amps in Los Angeles
The classic project is moving from a 100-amp to a 200-amp service to feed an EV charger, heat pump, or induction range. In Los Angeles that's a permitted service upgrade like any panel change: permit, inspection, and a licensed electrician doing the work. Worth budgeting time for: on record here, LADWP coordination may be needed. Inspectors typically verify grounding and bonding, working clearances around the panel, and a properly labeled circuit directory before signing off.
How to Get a Electrical Panel Permit in Los Angeles
Check LADBS Requirements
Review the specific requirements for electrical panel permits at the LADBS website or call the permit counter.
Prepare Plans
Submit site plan, construction drawings, and supporting documents through the LADBS ePlanLA Portal.
Apply Online or In Person
Many LA projects qualify for over-the-counter same-day approval at LADBS offices.
Pay Fees
Fees range $150–$600. Pay online or in person at the permit counter.
Schedule Inspections
Request inspections through the LADBS inspection scheduling portal as construction progresses.