Short answer: the city's own worked example for a shed that needs a permit runs from $47 in Nashville to $2,427 in San Diego across the 53 largest U.S. cities we cover, and the median is $213. Eighteen are under $150: Albuquerque, Baltimore, Boston, El Paso, Fort Worth, Honolulu, Jacksonville, Kansas City, Louisville, Nashville, New Orleans, New York, Orlando, St. Louis, Tulsa, Virginia Beach, Washington, Wichita. Fifteen are $150 to $299: Charlotte, Cincinnati, Colorado Springs, Corpus Christi, Denver, Houston, Irvine, Las Vegas, Miami, Milwaukee, Philadelphia, Pittsburgh, Raleigh, San Antonio, Tampa. Twelve are $300 to $699: Aurora, Chicago, Dallas, Indianapolis, Los Angeles, Minneapolis, Riverside, Sacramento, San Jose, St. Paul, Stockton, Tucson. Eight are $700 or more: Austin, Fresno, Long Beach, Phoenix, Portland, San Diego, San Francisco, Seattle. Twenty-seven cities price the permit on the shed's value, eleven charge a flat line, fourteen price it by square footage and San Jose bills hours, and fourteen add a separate zoning or planning fee. Most of the 53 exempt a small shed from the building permit altogether; for the size limit in each city see What Size Shed Can You Build Without a Permit? 53 Cities Compared. This page covers the other half of the question: what the city charges once your shed is big enough to need one. We read each city's fee schedule, exemption list and licensing rule and recorded the city's own reading.
Every row links to the city page that quotes the rule, so you can read the source language yourself. The table sorts by any column.
All 53 cities
| City | Permitted shed | The city's own example | How the fee is priced | Zoning or planning fee on top | Who may pull it | Schedule the city cites, and notes |
|---|---|---|---|---|---|---|
| Albuquerque, NM | Under $150 ⚠ | About $92 for a 140 sq ft shed valued at $4,899 ($55.63 permit + $36.16 plan review), before the zoning review fee of $25 to $45. A 240 sq ft shed is about $138. | UAC Table 112-A on a valuation of $34.99 per sq ft, multiplied by the 0.50 residential modifier ($23.50 minimum), plus 65% plan review. | A zoning review fee is added: $25 on the Building Safety handout, $45 on the 2025 General Planning Fee Schedule. | A homeowner's permit needs a notarized Homeowner's Affidavit, one per owner in a 12-month period. Leased homes need a licensed GB-2 or GB-98 contractor. | 2024 Uniform Administrative Code Table 112-A; Building Safety fee handout; IDO 5-11(C)(4) Exempt up to 120 sq ft. An electrical permit is a $47 administrative charge plus $1.50 per outlet. A drainage plan is needed over 500 sq ft. |
| Aurora, CO | $300 to $699 | $332 for a $3,000 shed over 120 sq ft: $166 permit fee + $166 plan review, from the city's fee calculator (Adams County). A $10,000 shed is $668 ($334 + $334). About $56.25 in estimated use tax on the $3,000 job is extra. A shed under 120 sq ft needs no building permit. | Valuation: the city's permit fee calculator prices the permit fee on the job's value and adds a plan review line of the same amount, which it labels if applicable; the page counts it as its reading of the chart that marks sheds as needing plans. The new-building table lists utility (U) buildings at $3.40 per sq ft with a $2,000 minimum, and the page does not say whether that table or the calculator governs a backyard shed. | No zoning fee stated. A shed under the permit size must still meet the city's zoning rules on placement, which are in the Unified Development Ordinance that the page could not open. | Yes: homeowners can obtain permits for their primary home, and owners of up to three single family detached structures can act as their own contractor after signing the Statement of Understanding. A hired builder must hold an Aurora contractor license. | City permit fee calculator and new-building fee table; Do It Right home improvement handbook (March 2019) and Building Division permit chart The tax line is a use tax deposit of 3.75% of materials cost, plus 0.25% in Arapahoe County. The handbook and the chart word the 120 line differently, so confirm a shed of exactly 120 sq ft at 303.739.7420. The permit expires if work does not start within six months or finish within one year. |
| Austin, TX | $700 or more | About $989.05 for a 240 sq ft shed, by the page's reading of the FY 2026-27 schedule (it names no shed row): $591.69 + (40 x $1.972 = $78.88) = $670.57 plan review at submittal, plus the $318.48 building permit base fee at issuance. About $1,101.81 if the $112.76 Application Processing Fee is added. A shed of 200 sq ft or less pays $0. | Square-foot plan review plus a flat building permit base fee ($318.48). Plan review on the addition and remodel scale is $591.69 plus $1.972 per sq ft over 200 for 201 to 300 sq ft; Texas Local Government Code 214.907 bars value-based residential fees. | No zoning fee stated. Setbacks come from the zoning district (Land Development Code 25-2-492); the page quotes no setback distances and sends readers to a Residential Zoning Questions appointment. | Yes. Texas has no state general contractor license, and Austin lets a homeowner register as the contractor for their own property. The $82.56 general contractor registration fee does not apply to people building on their own homestead. Wiring goes to a Texas-licensed electrician registered with the city, or to the owner under a homestead permit if they qualify. | FY 2026-27 residential fee schedule, effective October 1, 2026; list of work exempt from building permits; Texas Local Government Code 214.907 If staff price the shed as new construction instead, plan review starts at $986.15. Trees of 19 inches or more on or next to the lot add a tree review ($566.93). The review target for the New Construction or Addition application is 10 business days. |
| Baltimore, MD | Under $150 ⚠ | $78 for a 12x14 shed: $50 accessory fee + $3 permit tax (5% rounded up) + $25 application fee. | Flat accessory line in Sec. 109 of the city codes: $25 for 100 sq ft or less, $50 over 100 sq ft. | No zoning fee stated. Zoning limits a rear-yard shed to 180 sq ft and 15 ft. | The building code lets the owner or lessee apply, but DHCD says work on one- and two-family homes requires an MHIC-licensed contractor. | Building, Fire, and Related Codes of Baltimore City 2024 Sec. 109.6.1(b), 109.7, 109.5.7 Exempt up to 120 sq ft; the residential code's 200 sq ft exemption was not adopted. The application fee is $125 when plan review is needed. An electrical permit is $6 per circuit and goes to a licensed electrician. |
| Boston, MA | Under $150 | $50 for a $4,000 shed of 200 sq ft or less: the Use of Premises permit's primary fee, or $90 if ISD also charges $10 per $1,000 of cost. A $12,000 shed over 200 sq ft totals $220: a $170 long-form building permit plus the $50 Use of Premises permit ($140 on the short form). | A flat $50 Use of Premises permit for every shed, plus a building permit for a shed over 200 sq ft or over one story: $20 (short form) or $50 (long form) plus $10 per $1,000 of cost. ISD does not say which form a shed goes on. | No zoning fee stated. Setbacks and lot coverage come from the district's dimensional tables; a refusal goes to the Zoning Board of Appeal within 45 days, and its filing fee for a one- to three-family property is $150 in the fee schedule. | Homeowners of an owner-occupied one- or two-family home may file the permit themselves, though ISD recommends a licensed contractor with Home Improvement Contractor registration. An owner who pulls the permit is outside the HIC arbitration program and Guaranty Fund. Wiring the shed needs a licensed electrician. | ISD fee schedule (edition dated 5/15/23): Use of Premises permit; ISD short-form and long-form building permit fees; 780 CMR R105.2 No shed is filing-free: 780 CMR R105.2 exempts a one-story shed of 200 sq ft or less from the building permit, not from Use of Premises. A shed in a historic district may need Landmarks Commission approval, and ISD may charge double if work starts before the permit is issued. |
| Charlotte, NC | $150 to $299 ⚠ | About $239 for a contractor-built 12x16 shed at $8,000: County permit $123.65 + City LDIRL review $115. An owner builder pays $60 plus $45 per inspection trip to the County instead of the table fee. | Mecklenburg County LUESA valuation table ($59.70 for the first $3,000, then $12.19 per $1,000) plus a $3 technology charge. | City LDIRL review is $65 zoning + $50 stormwater for a shed over 12 ft. A shed 12 ft or less in every dimension needs only a City zoning use permit. | Owners whose name is on the deed and who live in the home may pull a County homeowner permit. A general contractor license is needed only at $40,000 or more. | LUESA Fee Ordinance (rev. 2026-07-01); City FY2026 residential zoning fees; UDO 17.1.D No County building permit up to 12 ft in every dimension, mean roof height included. The City review takes about 15 days and must be approved first. Wiring needs an electrical permit. |
| Chicago, IL | $300 to $699 ⚠ | $602 minimum for a shed over 150 sq ft; the area formula gives only about $33 for a 12x16, so the minimum controls. A $600 non-refundable deposit is due at submission. An exempt shed pays $0. Architect or engineer drawings are extra. | Plan-based fee: construction factor times scope factor times area (Table 14A-12-1204.3, Group U), so the $602 minimum controls. | Zoning review comes before DOB review; no zoning fee is stated. | An individual may act as general contractor on their own primary residence once per calendar year. Wiring needs a Chicago-licensed electrical contractor. | Table 14A-12-1204.3(3) Group U; 2026 fee tables; DOB list of work not requiring a permit Exempt up to 150 sq ft and 15 ft with no plumbing. An electrical express permit is $75 or $150. A frame garage up to 600 sq ft has its own flat $500 express permit. |
| Cincinnati, OH | $150 to $299 | About $246 for a 10x12 shed valued up to $4,000: $173 permit + $49 processing + about $24 surcharges. A built-on-site $8,000 shed is about $366. | Valuation schedule effective 2026-07-01 for 1-3 family: $173 up to $4,000, $203 at $5,000, $281 at $8,000, $336 at $10,000, plus a $49 processing fee. | A shed under 100 sq ft skips the building permit but needs a $158.55 Zoning Certificate of Compliance. No zoning fee is stated for a permitted shed. | Owners may pull the permit on a 1-3 family home they own and will live in for at least a year, with a notarized statement. Otherwise a registered contractor. | Cincinnati B&I fee schedule (eff. 2026-07-01); Cincinnati Building Code 1101-17.1(12); Zoning 1421-01 Exempt only up to 100 sq ft and 8 ft; the state code's 200 sq ft does not apply. Surcharges add about $11 per $100 of fee. An electrical permit from the Inspection Bureau, Inc. is $121.20. Tier 1 same-day review covers sheds under 400 sq ft. |
| Colorado Springs, CO | $150 to $299 ⚠ | $268.64 for a $3,000 shed that needs a permit (over 200 sq ft): $88 permit + $24.64 plan check + $1 State Statute Letter + the city's $130 zoning fee + $25 city IT fee, from PPRBD's own fee calculator. An $8,000 shed is $319.84. A shed of 200 sq ft or less on grade pays $0 to PPRBD. County use tax is extra unless you sign the sales tax affidavit. | Table A building permit on job value ($80 for the first $2,000 plus $8 per additional $1,000) plus a 28% plan check; the calculator adds the city's zoning and IT fees and the $1 State Statute Letter for a Colorado Springs address. | A separate $130 zoning fee (city Development Review Enterprise) and a $25 city IT fee are in the total. The city publishes no separate fee for the zoning review of an exempt shed; ask the Development Review Enterprise before you build. | A homeowner may pull the permit only for a primary residence they own and live in, and may not pull one for a hired contractor. A contractor building the shed needs a PPRBD license (Building Contractor E). | PPRBD fee schedule Table A and PPRBD fee calculator; PPRBC 105.2 item 1; PPRBD homeowner page Building permits come from the Pikes Peak Regional Building Department, a regional authority, and zoning from the city. Exempt up to 200 sq ft if one story, detached and on grade; PPRBD's homeowner page says zoning approval starts at 125 sq ft. Electrical in the shed is $50 attached to the building permit. |
| Corpus Christi, TX | $150 to $299 | $181.45 for a 240 sq ft shed that needs a permit: $35.04 of plan review plus the $146.41 minimum permit (240 x $0.461 = $110.64 falls below it). A 400 sq ft shed is $242.80. A wired shed adds an electrical permit at $0.075 per sq ft, and the 4.5% surcharge on starred fees is about $8 on the 240 sq ft shed. | Square foot: plan review at $0.146 per sq ft plus the building permit at $0.461 per sq ft with a $146.41 minimum, from the FY 2026 Development Fee Schedule. Texas Local Government Code 214.907 bars value-based residential fees. The page applies the fee to the shed's floor area. | No zoning fee stated. The Unified Development Code placement rules apply to every shed, permitted or not: behind the front face of the house, outside easements, and all accessory buildings together within 50% of the house's square footage (75% in the FR district). | Yes. The residential application has a signature line for the owner when the owner is the builder, and the city's residential code lets it issue permits to owners for work on a single-family home they own and occupy as their homestead. Wiring the shed takes a separate electrical permit, which a homestead owner may also obtain. | FY 2026 Development Fee Schedule (October 1, 2025 to September 30, 2026); Homeowner's Guide to Permitting; Texas Local Government Code 214.907 No building permit is needed for a shed of 200 sq ft or less. The page also lists a $100.00 residential floodplain review where it applies, and a penalty of 2 times the permit cost plus the $658.85 investigative fee for building a permit-size shed without a permit. The schedule's period has ended and it is still the newest posted, so the page says to confirm the rates. |
| Dallas, TX | $300 to $699 ⚠ | About $397 for a 240 sq ft shed: $256.80 at $1.07 per sq ft + $125 inspection + $15 technology fee. If the department also charges its $577 minimum plan review the total is about $974. | Chapter 52 Table A-I at $1.07 per sq ft up to 700 sq ft (Texas law bars value-based residential fees), plus a $125 inspection fee per trade. | No zoning fee stated. Zoning setbacks and the accessory floor-area limit apply to every shed. | A homestead owner may act as contractor only for portable accessory buildings. A permanent shed over 200 sq ft goes through a contractor registered with the city. | Chapter 52 Sec. 303.2.1.1 and Table A-I; Planning and Development fee schedule eff. 2025-07-01 Planned development, special use permit or deed-restricted areas add 10% of the permit fee. A failed inspection adds a $75 reinspection fee. Electrical goes to a registered Master Electrician or an exam-qualified homeowner. |
| Denver, CO | $150 to $299 | About $222 for an $8,000 shed over the 200 sq ft exemption: $83 building permit + $100 express review (20% of the permit fee, $100 minimum) + about $39 zoning. A 240 sq ft shed valued at $12,000 is about $256 ($115 + $100 + about $41). Card payments add 2.5 percent. | Valuation table: $35 for the first $2,000 plus $8 for each additional $1,000 or fraction of it, up to $25,000. Express review adds 20% of the permit fee with a $100 minimum; if plan review treats a large shed as a new building it goes to standard review at 50%. | A separate zoning permit, $35 plus 50 cents per $1,000 of valuation (about $41 on $12,000), is in the example total. A shed that fits the minor detached structure form needs no zoning permit but must meet its setbacks. | A homeowner permit covers a one-family house and its accessory structures: apply in E-permits, then email the Admin 131.4 forms and photo ID to plan review; no exam is required for general construction. Duplexes, townhouses, condos and ADUs do not qualify. A contractor needs a Denver Class C license or higher. | 2025 Denver Building Code Section 130.3; Denver valuation fee table and zoning permit fee; Express Review page The page says a large shed treated as a new building goes to the two-week standard review with a 50% plan review fee instead of 20%. An exempt shed may have two lights and two receptacles under a valid electrical permit. |
| El Paso, TX | Under $150 | $110 for a permit that needs one inspection or $160 for two, each plus a technology fee whose amount Schedule C does not state. Schedule C has no shed line, so the page says to ask which inspection line applies; it prices no shed size or cost. Power adds a separate electrical permit: a shed with four outlets adds $110 + 4 × $1.17 = $114.68. | Flat fee by the number of inspections the permit needs, from the FY 2027 Schedule C; not based on the shed's cost. | No zoning fee stated. Zoning setbacks under City Code 20.10.030 apply to every shed, permitted or not. | Yes, for a shed at the house the owner lives in: a homestead permit for an owner of an R-3 home who acts as his own general contractor and does some or all of the building work, with proof of ownership and a notarized homeowner affidavit. Electrical work in the shed goes to a contractor registered with the city, never the homeowner. | FY 2027 Schedule C (building permits by inspections needed; electrical base fee and per-outlet fee); City Code 18.10.040 Schedule C also prints value-tiered electrical lines (503-508); the page uses the itemized lines and says to confirm the total with the department. |
| Fort Worth, TX | Under $150 | $110.96 for a shed up to 175 sq ft: $61.01 + $33.08 application fee + $16.87 technology fee. A 200 sq ft shed is $156.95 and a 400 sq ft workshop $196.95. | Group U table by square footage under Fee Ordinance 26-28781: $61.01 up to 175 sq ft, then $102.00 plus $0.20 per added sq ft (Texas LGC 214.907 bars value-based residential fees). | No zoning fee stated. A Board of Adjustment variance for an oversized shed is $591. | Owner-occupants with a homestead permit may pull it. Otherwise a building contractor registered with the city ($178 a year) must. | Fee Ordinance 26-28781 (adopted 2026-09-15, eff. 2026-10-01); Administrative Code 105.2 Every shed needs a permit; there is no size exemption, and zoning caps size by lot at 120, 200 or 400 sq ft. No plan review deposit is charged for accessory structures at a house. Building first adds an investigation fee equal to the permit fee. |
| Fresno, CA | $700 or more | $806.86 for the first row of the U-1 Garage, Carport table (333 sq ft): $548.60 plan check plus $258.26 inspection, before surcharges. The schedule has no shed line and does not say how a smaller building is priced; services it does not list are billed at a $149.07 blended hourly rate, and the page does not say which applies to a 150 or 200 sq ft shed, so ask for a fee estimate. | No shed line in the Master Fee Schedule effective July 1, 2026; the nearest line is U-1 Garage, Carport, priced by floor area, with the hourly rate for unlisted services. Every building permit also carries a 12.83% General Plan surcharge and a $23.79 technology surcharge, plus the state surcharge of $1 for valuations up to $25,000 and $2 up to $50,000. | No zoning fee stated. A shed over the exemption needs planning approval with a plot plan and the Single Family Zone Clearance checklist, but the page prices no zoning line. An exempt shed still has to keep 3 ft from property lines. | Yes, with limits: an owner-builder under Business and Professions Code 7044 who does the work personally or with their own employees and does not sell within a year; the site must be the owner's principal residence, occupied for 12 months before the work is finished, and the exemption cannot cover more than two structures in any three-year period. | Master Fee Schedule effective July 1, 2026 (U-1 Garage, Carport; blended hourly rate); Single Family Homes exemption list; city permit affidavit A shed within 120 sq ft, 12 ft and 3 ft from lot lines needs no building permit and pays nothing; wiring or plumbing in any shed, exempt or not, is separate work with its own permit. Building without a required permit can cost up to 4 times the permit fee. |
| Honolulu, HI | Under $150 | $146.40 for a $5,000 shed that needs a permit: a $122 permit fee plus $24.40 plan review (20%). A $12,000 shed is $331.20. A shed of 120 sq ft or less in total pays nothing. | Value of work under ROH 18-6.2: from $1,000.01 to $20,000 the permit fee is $12 plus $2.20 for every $100, rounded up. Plan review is 20% of the permit fee, paid when the plans are accepted; the permit fee is paid at issuance, by check for permits with plans. | No zoning fee stated. The exemption covers the permit, not zoning: general yards for a house are 10 feet front and 5 feet side and rear, and a storage shed is not on the list of things allowed in a required yard. | An owner can build a permitted shed under the owner-builder exemption (HRS 444-2.5) for their own use, after registering for it. Any electrical or plumbing work must be done by licensed contractors. | ROH 18-6.1 and 18-6.2 (fee on the value of the work, plan review); ROH 18-3.1(b)(16) for the exemption and HRS 444-2.5 for owner-builders A shed is not on DPP's list of jobs that qualify for an instant online permit, so a shed over the limit is a building permit with plans filed in HNL Build and uploaded to ePlans. DPP takes checks only for permits with plans. |
| Houston, TX | $150 to $299 | About $213 for a 200 sq ft shed: roughly $143 permit fee + $36 plan review + $33.56 admin. A 320 sq ft workshop is about $313. An exempt shed pays $0. | Square-footage tier on the 2026 one- and two-family table ($47 base plus $5.36 per 8.17 sq ft after the first 57.16, $91.06 minimum); Texas HB 852 bars value-based residential fees. | Houston has no zoning, so no zoning fee. Deed restrictions and floodplain rules still apply. | The owner, an agent or a contractor may buy the building permit; Houston does not license general contractors. Electrical goes only to registered master electricians. | 2026 Building Code Enforcement fee schedule (one- and two-family table); Residential Permitting 101 Plan review is 25% of the permit fee and non-refundable. The electrical minimum is $91.06 and the plumbing minimum $97.56, each plus the admin fee. Floodplain lots may need a separate development permit. |
| Indianapolis, IN | $300 to $699 | $630 for a 12x20 shed over 200 sq ft: $140 Improvement Location Permit + $490 structural permit ($40 application + $150 plan review + $300 issuance). With a lighting circuit ($169 electrical) it is about $799. | Flat DBNS fee schedule of 2026-01-05: ILP plus a structural permit for an accessory Class 2 structure of 200 to 1,000 sq ft. | A separate zoning Improvement Location Permit is charged: $32 application + $108 = $140. | Any individual who owns the parcel may get the structural permit for work done personally, with a Statement of Intent. Electrical needs a licensed contractor or a board-approved owner-occupant. | DBNS fee schedule of 2026-01-05; Sec. 536-201(b)(17) as amended by G.O. 38, 2025; Zoning Ord. 740-801.A.3.g Exempt up to 200 sq ft if not on a permanent foundation and with no wiring. The schedule has no line under 200 sq ft, so a small shed that loses its exemption gets a subtype at intake (budget $490, $290 best case). No drainage permit is needed. |
| Irvine, CA | $150 to $299 | About $246 for a 150 sq ft shed on the nearest fee line, item 6, miscellaneous residential structures: plan check of $81.00 rises to the $95.67 minimum, plus $99.00 inspection is $194.67, plus $31.88 issuance and $19.47 automation. A 200 sq ft shed is about $296. | Schedule II, effective August 15, 2026, has no shed line. The closest is item 6: plan check $0.54 and inspection $0.66 per square foot, each with a $95.67 minimum per residential job, plus the $31.88 issuance fee and the 10% automation fee on plan check and inspection (our reading of item 21). | No zoning fee stated. Setbacks come from the Irvine Zoning Ordinance and vary by district; the page could not open the ordinance, so it says to confirm the setback with the Planning Counter. | Limited: Bulletin 222 says work on homes, pools and equipment such as water heaters and HVAC is permitted to a state-licensed contractor, with one very limited exception, an owner-builder, who signs the city's Property Owner's Package. | Permits Not Required list; Schedule II item 6, effective August 15, 2026; Bulletin 222 (owner-builder exception) A shed of 120 sq ft or less, one story and detached, needs no permit. Whether the plan checker prices a shed on item 6 is the city's call, so ask the Permit Processing Counter for an estimate. The page says the state energy and access surcharge, if it applies, would take a 150 sq ft shed from about $246 to about $368. |
| Jacksonville, FL | Under $150 | $85 for a small shed (not over 150 sq ft and $5,000, no final inspection): $45 BID fee including plan review + $15 Development Services fee + $25 debris fee. One inspection is $125; bigger sheds are about $265 at the minimums. | Flat shed lines in Ordinance Code Sec. 320.409, published on the city fee page. | No separate zoning fee. A $15 Development Services fee is in the total, and a zoning check applies to placement. | Yes for an owner who owns and lives in the home; the Property Owner Disclosure Statement is handed over at the appointment. A contractor files in JaxEPICS. | Ordinance Code Sec. 320.409 (city fee page) Every shed needs a permit; there is no size exemption. Florida adds 1% and 1.5% surcharges (each $2 minimum) that are not in these totals. A job of $5,000 or more needs a recorded Notice of Commencement. Wiring or plumbing is a separate trade permit. |
| Kansas City, MO | Under $150 | $70.99 for a $5,000 shed ($58 + 3 x $4.33). An $8,000 shed is $83.98. Wiring adds a separate electrical permit, $52 for a job of $1,000 or less. | Sec. 18-20(b)(2) valuation table shared by building and trade permits: $52 up to $1,000, $58 to $2,000, then $4.33 per $1,000. | No zoning fee stated. Zoning separately caps a non-garage shed at a 200 sq ft footprint and 10 ft. | An owner who lives in a single-family home may pull the permits and do the work, including wiring, with family or friends. | KC Code 18-20(b)(2); 18-16(b)(1)a; Zoning 88-305-02-D Exempt up to 200 sq ft of projected roof area, eaves included. There is no separate plan review fee for one- and two-family work. Starting without a permit triples the fee. |
| Las Vegas, NV | $150 to $299 ⚠ | $264 for a shed priced on the Utility Structure (without MPE's) line, the schedule's first size row at 200 sq ft: $60 plan check + $204 inspection; the page says the fees apply to larger sheds or ones with utilities. With utilities that row is $325 ($61 + $264), and an 800 sq ft shed is $445. A $2 technology fee is added to every permit. A shed under 200 sq ft with no utilities needs no permit. | Fixed plan check plus inspection fee by floor area on the Utility Structure line of the Building User Fees schedule dated July 1, 2021, not a percentage of the job. The schedule has no shed line, so the page reads this one, and it gives no rule for sizes between its rows. | No zoning fee stated. The page says the Fee Estimator leaves out zoning, sewer connection and impact fees; Title 19 accessory structure setbacks apply to every shed. | Yes, on the owner's own primary residence under NRS 624.031(5): complete the Nevada State Contractors Board owner-builder affidavit, have it approved and submit it with the permit application. The city says the exemption applies mainly to single-family homes, not condominiums or apartments. A contractor needs a Nevada license and a city business license. | Building User Fees schedule (Utility Structure without MPE's line); Administrative Code 301.4.1 item 14; homeowner guide At exactly 200 sq ft the city's own documents disagree on whether a shed is exempt. The Fee Estimator is a planning tool, not a quote, and leaves out zoning, sewer connection and impact fees. |
| Long Beach, CA | $700 or more ⚠ | About $931 for a 150 sq ft shed ($10,661 valuation): permit $293 + plan check $249 + zoning plan check $237 + $115 processing + small state fees. A 250 sq ft shed is about $1,212. | Valuation at $71.07 per sq ft (IB-077): $149 for the first $2,000 plus $16 per $1,000 to $20,000, plus 85% plan check. | A zoning plan check of 0.5% of valuation ($310 minimum, capped at 95% of the building plan check) is charged and included in the total. | A CSLB-licensed contractor with a Long Beach business license, or the homeowner of a one- or two-family home under IB-029. | IB-077 minimum valuations; IB-002 over-the-counter review; LBMC 18.04.020.B.2 Exempt up to 120 sq ft, 8 ft tall and no utilities. An accessory building is capped at 300 sq ft or 5% of the lot. Power adds an electrical permit from a $100 minimum. |
| Los Angeles, CA | $300 to $699 | About $366 for a $5,000 shed: permit $217.72 + plan check $148.38 per the city fee calculator, surcharges included. A $15,000 shed is about $683. Credit cards add 2.7%. | Valuation-based permit fee with plan check at 90% of the permit fee, plus surcharges on both. | No zoning fee stated. Zoning setbacks and location rules apply to every shed. | Owner-builders may sign after initialing the Owner-Builder Declaration. An owner needs 12 months of residence to pull electrical or plumbing permits. | LAMC 91.106.2 item 1 (2026 Los Angeles Building Code); LADBS Permit Fee Calculator There is no size exemption: work valued at $2,500 or less is exempt. Simple wood-frame sheds get Counter Plan Check in about 45 minutes. Wiring or plumbing needs its own permit. |
| Louisville, KY | Under $150 | $75 for a 240 sq ft shed over 200 sq ft: 240 x $.13 = $31.20, raised to the $75 minimum. Any shed up to about 576 sq ft pays $75. | Per sq ft at $.13 for utility buildings (LMCO 150.096) with a $75 minimum permit fee. | No zoning fee stated. Land Development Code setbacks apply to every shed. | How an owner without a contractor license files a building permit for a large shed is not stated in any document the page reached. A homeowner may wire their own home with a notarized certification. | LMCO 150.096 fee schedule (revised 2024-02-06); Kentucky Residential Code R105.2 Exempt up to 200 sq ft, one story. Permitted work that disturbs soil needs an MSD form. An electrical permit is $75 up to $750 of work and $100 above. |
| Miami, FL | $150 to $299 ⚠ | About $154 for a $6,000 shed kit: the $110 minimum + $40 application fee + $4 state surcharges, before a county surcharge the code does not quantify. A $30,000 shed is about $194. | City Code 10-18: 0.50 of estimated construction cost with a $110 minimum ($45 under $2,500), plus a $40 application fee. | No zoning fee stated. Miami 21 limits a shed to 200 sq ft or 10% of the house floor area. An up-front fee of $2.80 per $1,000 is 80% credited. | Owner-builders may file under FS 489.103(7) for a one- or two-family home they occupy and will not sell or lease; they must appear in person. | City Code 10-18 as amended by Ord. 14439; City Code 10-5(b); Miami 21 5.3.1 No size exemption exists. Sheds are exempt from the solid waste surcharge. Electrical or plumbing for the shed is each at least $110 plus $40. Hurricane-zone product approvals (NOA) are required. |
| Milwaukee, WI | $150 to $299 | About $188 for a 200 sq ft shed: $90 at $0.45 per sq ft + $75 plan review + $2.64 surcharge + $20 processing. A permitted 150 sq ft shed costs more, $248.60. | Flat fees from MCO 200-33: $175 plus $50 review up to 150 sq ft, then $0.45 per sq ft plus $75 review. | No zoning fee stated. Zoning keeps a shed out of the front yard and caps it at 14 ft. | An owner who lives in the home can pull the permit and do the work without a contractor license. | MCO 200-33 (DNS fee schedule); MCO 200-24-1.5-c; table 295-505-3 Exempt up to 150 sq ft if 3 ft or more from every lot line; a closer shed needs a permit even at 150 sq ft or less. DNS adds a 1.6% surcharge. An electrical permit is $100 minimum plus $25 processing from a licensed contractor. |
| Minneapolis, MN | $300 to $699 | About $311 for a 240 sq ft shed valued at $6,000: $186.60 permit + $121.29 plan review + $3.00 state surcharge. If the reviewer waives plan review it is about $190. | Valuation: $104.20 for the first $2,000 plus $20.60 per $1,000 ($84.20 minimum), plus 65% plan review and a 0.0005 state surcharge. | No zoning fee for a standard shed. A $240 administrative application applies only to a shed 13 to 16 ft tall or accessory buildings over 800 sq ft. | Not stated for the building permit. The page says no state contractor license is required to hire someone. | Minneapolis building permit fee schedule; Minn. R. 1300.0120 subp. 4 Exempt up to 200 sq ft, one story. Wiring goes through the Minnesota Department of Labor and Industry, where the smallest homeowner permit is $55 + $25 + $1. Starting early may double the fees. |
| Nashville, TN | Under $150 | $47 for a $4,000 prefab shed that needs a permit: $20 building fee + $2 tech fee + $25 zoning fee. A $10,000 site-built shed is $80. The examples assume Metro values the job at its cost; ask the Zoning Help Desk how yours will be valued. | Residential building permit at $5.00 per $1,000 of the shed's value, plus a codes tech fee of 10% of that and a $25 zoning examination fee. One- and two-family permits pay no separate plan examination fee. | A $25 zoning examination fee is in the total. Setbacks and the 16 ft accessory height limit apply to every shed. | An owner who lives in the house can pull a self permit with two notarized affidavits. An owner whose title is in an LLC or trust, or who is building at a rental, can self-permit only work under $25,000. Homeowners apply through the Zoning Help Desk; only registered contractors apply online. | Metro residential permit list; Metro fee schedule; Zoning Code Title 17 accessory structure rules The permit list starts at 100 sq ft; a smaller shed is not addressed, so ask the Zoning Help Desk. Wiring or a sink needs separate trade permits with a $75 minimum each. |
| New Orleans, LA | Under $150 ⚠ | $70 for a $2,000 prefab shed that needs an Accessory Structure permit: $60 + $10. An $8,000 site-built shed is $100. Plan review, if the department asks for plans, and any historic-district surcharge are extra. | Valuation: $60 plus $5 per $1,000 of the shed's market value, labor and materials included, even for an owner build. Plan review adds $1 per $1,000 with a $60 minimum on the fee schedule and $120 on the city's estimator page. | No zoning fee stated; the page adds no zoning line to the total. Zoning limits apply to every shed: at least 3 feet from every lot line and 14 feet at most inside a required yard. | An owner-occupant may file for the personal residence with the notarized State Exemption Form R-1364 and the Affidavit Claiming Exemption from Licensure; it does not cover property for sale or rent. Wiring to the shed needs a separate permit that only a city Class A electrician can pull. | Safety and Permits fee schedule and Guide to Building Permits; city fee-estimator page; Comprehensive Zoning Ordinance, Article 21.6 The city's exempt-work list sets no size below which a shed is exempt, so the page says to call the Building Division at (504) 658-7130 before skipping a permit for a small prefab shed. Building first adds a penalty of 200% of all fees. |
| New York, NY | Under $150 | About $149 to file a $12,000 shed that must be permitted: the $130 minimum covers the first $5,000 of job cost plus $2.60 per $1,000 above it. An exempt shed pays $0 to DOB. The PE or RA who prepares the filing is extra. | DOB alteration filing under Table 28-112.2 at a 1-3 family home: $130 minimum for the first $5,000, then $2.60 per $1,000. | No zoning fee stated. Zoning Resolution rear-yard rules apply even to an exempt shed. | An exempt shed can be installed by the owner. A shed that needs a permit is filed by a PE or RA, and the work permit goes to a Registered General Contractor. | Admin. Code Table 28-112.2 (L.L. 128 of 2024); 1 RCNY 101-14 Table 1 item 1; DOB Fences and Backyard Sheds page Exempt up to 120 sq ft and 7 ft 6 in, 3 ft from lot lines, one shed per tax lot. Power to the shed needs a separate electrical permit from a Licensed Master Electrician. |
| Orlando, FL | Under $150 ⚠ | $85.06 for a $3,000 prefabricated shed: the $75.06 building permit ($66.24 plus 2 × $4.41) plus $2 + $2 + $3.75 + $2.25 in surcharges, all four assumed to apply. An $8,000 shed is $108.88. | Building permit on construction cost, the ICC Building Valuation Data figure or the contract price, whichever is greater: $66.24 for the first $1,000 plus $4.41 for each additional $1,000 or fraction, with four surcharges on the building permit fee: 1.5% ($2 minimum), 1% ($2 minimum), 5% concurrency and 3% technology. The page assumes all four apply because the schedule does not say which jobs they cover. | No zoning fee stated. Sheds are accessory structures under Land Development Code Chapter 58, Part 5, which decides whether and where one can go on the lot. | Yes: owner-builders sign the Owner/Builder Declaration in person at the Permitting Services office. The shed page states no further owner conditions. | City 2026 residential fee schedule; accessory structure checklist; Land Development Code Chapter 58, Part 5; FS 553.79(1)(g) No size exemption is published, and the state exemption for work under $7,500 is by written request only. A wired shed needs a separate electrical permit, $68.23 for the first $1,000 of work. The city says it is reviewing its fees under HB803, so these figures may change. |
| Philadelphia, PA | $150 to $299 ⚠ | $189 for a zoning permit for a shed up to 130 sq ft in a side or front yard ($25 filing fee up front, $164 on approval). A building permit for a shed over 200 sq ft would add about $82.50 for 240 sq ft, but only once a variance is in hand. A rear-yard shed up to 130 sq ft pays $0. | Flat zoning fee of $189 for residential new construction; the building permit is $75 for the first 500 sq ft plus $56 per extra 100 sq ft. | A separate zoning permit is charged for a shed in a side or front yard: $189, with the $25 filing fee applied to it. | An owner who lives in the building may do the work only if no electrical or plumbing permit is needed. Electrical work needs a licensed electrical contractor. | L&I zoning fee summary PZ_008 (July 2026); L&I fee summary (eff. 2026-10-01); shed FAQ PG_011 Sheds over 130 sq ft at a 1-2 family home are not permitted by the Zoning Code, so L&I issues a refusal and only a ZBA variance helps; the variance cost is not stated. An electrical permit is $25 per $1,000 with a $63 minimum plus $7.50. |
| Phoenix, AZ | $700 or more ⚠ | About $746 for a 240 sq ft shed: permit fee $373 + 100% plan review $373. A 320 sq ft shed is about $866. An exempt shed (200 sq ft or less, no utilities) pays $0. | Table A of the 2026 Development Fee Schedule on a valuation of $69.64 per sq ft (240 sq ft = $16,714). | A $98 plot plan review is listed for single-family permits; whether it is charged on a shed depends on how the counter logs the application. | Owner-occupants may build under ARS 32-1121.A.5 if the home will not be sold or rented within a year. Otherwise use an ROC-licensed contractor. | Development Fee Schedule Appendix A.2 (eff. 2026-01-20); 2024 Phoenix Building Construction Code 105.2 The city uses the higher of its calculation and your contract price. Unaltered shipping containers up to 320 sq ft are also exempt. Building without a permit costs an investigation fee of $250 or the permit fee, whichever is greater. |
| Pittsburgh, PA | $150 to $299 ⚠ | $191.50 for an $8,000 shed over 200 sq ft: $130 minimum base fee + $2 technology + $4.50 state fund + $5 digital record + $50 zoning review minimum. The same total holds up to about $21,600 of value. | Valuation: PLI residential base fee of $6.00 per $1,000 with a $130 minimum, plus a zoning review fee of $1.00 per $1,000 ($50 minimum). | A separate zoning review fee is charged by City Planning: $1.00 per $1,000, $50 minimum. | PLI lets the homeowner do the work on a primary residence. Anyone doing permitted electrical work needs a city electrical trade license. | PLI 2026 fee schedule; City Planning zoning fee schedule; Zoning Code 912.04 Forty percent of the base fee is due, non-refundable, at application. An electrical permit is about $142. |
| Portland, OR | $700 or more ⚠ | About $835 for a 240 sq ft shed declared at $12,000: permit $359.95 + plan review $233.97 + Development Services fee $73.14 + 12% state surcharge $43.19 + zoning inspection $125. A 400 sq ft workshop at $30,000 is about $1,309. | Valuation-based building permit (new sheds valued at 50% of the ICC utility figure, or the stated value if greater), $167 minimum, plus 65% plan review. | A $125 zoning inspection is in the total. A zoning permit for an exempt shed is optional at $48. | Owners may build their own shed; a hired contractor's CCB number goes on the application. Owner electrical work needs an owner-occupied home not sold or rented within six months. | PP&D building, plan review and Development Services fee schedules; Oregon 12% surcharge; Zoning Code 33.110 Exempt up to 200 sq ft and 15 ft. The first electrical branch circuit is $194.88 with the surcharge. Starting early adds an investigation fee of at least $167. |
| Raleigh, NC | $150 to $299 ⚠ | About $203 for a 12 x 16 shed (192 sq ft) valued at $11,954: the building permit is $129 (the $124 minimum with the 4% technology fee) and plan review at the city calculator's 57% rate is $74. A shed under 12 ft in every direction is a zoning permit instead, about $271 ($261 per review plus the 4% technology fee). The guide's minimum-fee line would make the 12 x 16 total $258. | Building permit at 0.38% of a value from the ICC square-foot table reduced 12.4% for Raleigh ($62.26 per sq ft for a utility building, assuming type VB), $124 minimum, plus plan review at 57% of the building fee; a small shed is billed under the guide's residential zoning permit. | A residential zoning permit ($271) may also apply; ask at intake. For a shed under 12 ft the page reads it as the only fee, because the guide lists no shed-specific line. | A homeowner acting as their own contractor files the notarized Owner Exemption Affidavit, which commits the owner to occupy the home for twelve months after the work. | City accessory structure page; UDO Sec. 6.7.2; FY27 Development Fee Guide (July 1, 2026 to June 30, 2027); city fee calculator The page words the 12 ft line both ways, so a shed of exactly 12 ft in any direction needs a call to the Permit Helpline, 919-996-2500. Adding a circuit adds an electrical permit at about $129 (minimum). |
| Riverside, CA | $300 to $699 ⚠ | About $323 for a 200 sq ft shed: 200 x $0.80 = $160, plus $41 issuance and $82 planning, then the 14% surcharge. If the 400 sq ft minimum in the division's fee sheet still applies, the same shed is about $505. | Accessory structures (occupancy U) at $0.80 per sq ft for building permit and inspection, each line read as plan check and permit combined (our reading of the March 2026 fee sheet), plus a $41 issuance fee per separate permit and the 14% surcharge (10% General Plan Maintenance plus 4% Technology). | A separate Planning fee: $82 for over-the-counter single-family work, which names accessory structures, is in the example. Planning clears most building permits first. | Yes. Riverside issues many permit types to the property owner or an authorized agent; an owner-builder signs the city's Property Owner Package at the counter or before a notary. | FY 2026/27 Schedule of Fees and Charges (effective July 1, 2026); exempt-work list; Bulletin 140 (August 4, 2026) No permit to 120 sq ft. The schedule's separate $341 Building Plan Check line may be added, so ask. Wiring to an exempt shed is a separate electrical permit. |
| Sacramento, CA | $300 to $699 ⚠ | About $508 for a 10x14 shed built by the owner ($9,750 valuation): permit $308 + plan review $129 + surcharges $71.32. A 12x20 contractor-built workshop is about $679 before Planning fees and about $1,074 with them. | Residential New Building permit on a valuation of $69.64 per sq ft or the contract price if higher, plus technology, General Plan, green building and strong motion surcharges. | Planning fees come on top: a $132 Site Plan and Design Review exemption form fee and Planning review at 15% of plan review with a $263 minimum. | Property owners may pull the permit with an owner-builder verification. State law requires living in the home for the 12 months before the work is completed. | 2026 residential fee sheet (CDD-0245 valuation); CDD-0417 accessory structures handout; CDD-0025 A contractor applicant also pays a business operations tax. Construction Excise Tax and Fire Department fees ($260 + $294 + $176) may be routed on a storage shed; ask at intake. A minor electrical permit is $105. |
| San Antonio, TX | $150 to $299 | $162.00 for an unfinished shed over 300 sq ft filed online ($150.00 flat + two 4% surcharges). A finished 400 sq ft workshop is $186.30. | Flat fee by size on the FY 2027 schedule: $150.00 unfinished, $172.50 for 0 to 500 sq ft, $488.80 for 501 to 1,000 sq ft. | No zoning fee stated. UDC setbacks and the side or rear yard rule apply to every shed. | Owners may file if they will own the home for 12 months after the project is finished (City Code 10-115(a)(1)); otherwise a city-registered contractor. | FY 2027 Development Fee Schedule (revised Sept. 2026); City Code 10-6(e)(1)a Exempt up to 300 sq ft. A paper application adds an $11.50 convenience fee and card payments add 3%. A foundation engineer's letter of inspection is needed to close the permit. An electrical permit is $57.50 base plus items. |
| San Diego, CA | $700 or more ⚠ | About $2,427 for a 200 sq ft workshop with one inspection hour: $1,501.42 plan check + $737.00 General Plan Maintenance Fee + $12.16 mapping fee + $176.84 inspection. Two inspection hours is about $2,604. | Flat Garage and Storage plan check line of IB 501 Table 501C ($1,501.42 per building) plus inspection billed at $176.84 per hour. | No separate zoning fee. The $737.00 General Plan Maintenance Fee is charged on plan-reviewed work and is in the example. | Owner-builders may file with the signed Owner-Builder Verification Form DS-3042 after living in the home for 12 months. Tenants cannot sign it. | IB 501 Table 501C; SDMC 129.0203(a)(1); IB 100 Exempt up to 120 sq ft of projected roof area. The state strong-motion and building standards fees and a $17.11 collection charge are small extras. Wiring is a no-plan Simple Permit filed online. |
| San Francisco, CA | $700 or more ⚠ | About $1,460 for a 150 sq ft shed valued near $10,650: DBI plan review about $565 + issuance about $343 + Planning's building-permit fee about $550. A 250 sq ft workshop is about $2,090. | DBI Table 1A-A (eff. 2026-07-12): plan review $310 for the first $2,000 plus $28.35 per $1,000, issuance $266 plus $8.56 per $1,000, on $71 per sq ft. | Planning's building-permit application fee is charged on top: $504 for work under $10,000, or $516 plus 5.274% of cost above $10,000. | Property owners may pull the permit and do the work, or hire a licensed B contractor. An owner may pull electrical only for a stand-alone single-family house they occupy and wire themselves. | DBI Table 1A-A; DBI cost schedule; Planning Department building-permit fee One detached storage shed per lot is exempt. An electrical permit for up to 10 outlets is $305. Habitable use is never exempt. |
| San Jose, CA | $300 to $699 ⚠ | About $585 for a simple prefab shed in Tier 1: $211 processing + $210 inspection tier + $162.50 plan check. A site-built workshop in Tier 2 is about $740. | Hourly schedule: $211 processing, building permit billed at $315 per hour of inspection time in tiers (40 to 250 minutes), plan check at $325 per hour. | No zoning fee stated. Title 20 zoning rules apply whether or not a permit is issued. | The owner may pull the permit. The owner-builder exemption needs 12 months of residence and work done before sale. | FY2026-27 Schedule of Fees and Charges (eff. 2026-07-01); SJMC 24.02.120 Exempt up to 120 sq ft. A permitted shed is not an online permit type and is filed at the Permit Center. Work without a permit costs two times the plan review and inspection fees. Residential electrical permits are $315 per hour. |
| Seattle, WA | $700 or more | About $701 for a 10x14 shed ($472.20 index + 40% plan review + 5% technology fee + $6.50 state fee = $700.63). A 12x16 shed is about $788. | Table D-1 index on a value of $72.18 per sq ft: permit at 100% of the index plus 40% plan review for an STFI permit. | No zoning fee stated. The 12 ft height cap and setbacks apply whether or not a permit is needed. | Not stated for the building permit. The page says owner-occupants may do their own wiring. | 2026 SDCI Fee Subtitle Table D-1; Director's Rule 5-2025; SRC R105.2 item 3 Fees rose 18% on 1/1/2026. A shed that does not qualify for STFI (over 750 sq ft, long spans, critical area) pays 100% plan review, about $1,120 for a 12x16. An electrical permit starts at $105.12 plus a $55.48 admin fee. |
| St. Louis, MO | Under $150 ⚠ | $85 for a $6,000 prefab shed over 120 sq ft ($25 application + $60 permit fee). An $8,000 shed is $105 and a $12,000 shed $145. Card payments add 2.55%. | Building Division fee table on estimated cost: $44 to $55 up to $3,000, then $10 per $1,000 or fraction above that. | No zoning fee stated. Zoning side-yard and front-yard-line rules apply to every shed. | An owner-occupant can register an account, draw the plans and have the permit issued in the owner's name. Wiring needs a licensed contractor or a tested owner-occupant. | Building Division fee table and Permit Cost Estimator; Ord. 70795 Sec. 105.2 item 26 Exempt only up to 120 sq ft and under 12 ft, anchored to a 4 in concrete slab. An electrical permit is $85 ($25 + $60). Starting early adds a $30 to $90 surcharge. |
| St. Paul, MN | $300 to $699 | $316.50 for a 240 sq ft shed valued at $6,000: $190 permit + $123.50 plan review + $3.00 state surcharge. A $10,000 shed is $457.10. Sheds of 200 sq ft or less need no building permit. | Valuation (Table A, Legislative Code Section 33.04): $106 for the first $2,000 plus $21 for each additional $1,000, plus 65% plan review and a 0.0005 x value state surcharge. | No zoning fee stated. Every shed, permitted or not, must meet the zoning setbacks and lot coverage, and a shed on a Heritage Preservation District property needs Heritage Preservation Commission approval whatever its size. | Yes. The homesteading owner of a one- or two-family home can pull the permit with DSI's Homeowner's Building Permit Affidavit and needs no city license. Owner electrical permits are limited to a single-family home or one side of a side-by-side duplex or townhome with rated walls. | Legislative Code Section 33.04, Table A (DSI schedule dated February 25, 2023; Ordinance 25-41 carries the same figures) DSI values detached garages at $28 per square foot on its garage schedule, so the valuation may be set by size rather than your quote. Ten percent of the estimated plan review fee, at least $85 and at most $5,000, is due before review begins; the ordinance does not say how it is credited, so the totals are the schedule's figures. |
| Stockton, CA | $300 to $699 | $327 for a $5,000 shed over 120 sq ft: $230 permit fee + $97 plan check, from the Residential Fees Fixed Table. A $10,000 shed is $462 ($325 + $137). A shed up to 120 sq ft needs no building permit. | Valuation: no shed line in the FY 2026-27 Adopted Fee Schedule effective July 1, 2026, so it is priced from the Residential Fees Fixed Table, a building permit fee and a plan check fee for each $1,000 band of valuation set from the ICC valuation table. The schedule lists add-ons it does not say apply to a given permit: a building technology fee of 7.5% of the permit fee, a Community Rating System admin fee of 6% of the permit fee, a General Plan fee of 0.15% of valuation, a capital preservation fee of 0.1% of valuation and two state pass-throughs; the example leaves them out. | No zoning fee stated. A shed must still meet the Development Code's accessory structure placement rules, which the page could not read online; it says to call Planning at (209) 937-8266 before you pour a pad. | Yes: you can hold the permit yourself with the Owner/Builder Declaration, and the city will not issue it until you have initialed, signed and returned it. The page states no residency period or limit on how often an owner may do this. Hiring anyone other than licensed contractors on work worth $500 or more may make you an employer under state and federal law. | FY 2026-27 Adopted Fee Schedule effective July 1, 2026 (Residential Fees Fixed Table); Work Exempt From Permit handout for homes (BLDG-0018) Wiring or a water line to any shed, exempt or not, needs its own permit. Building without a permit costs a double permit fee, and a re-inspection is $195 an hour. The city sets valuation from the ICC valuation table, so it may not match your receipt. |
| Tampa, FL | $150 to $299 ⚠ | $181.43 for a shed of up to 500 sq ft: the $177 residential accessory-structure fee plus the 2.5% Florida Building Permit Surcharge, the same total the city's fee estimator returns. An exempt shed of 120 sq ft or less pays $0. For lights or outlets, ask whether the $177 fee covers the wiring or an electrical trade permit ($124.00 standalone) is needed. | Flat residential accessory-structure line ($177) in the Miscellaneous Projects fee schedule, plus the 2.5% state surcharge ($4.00 minimum). The fee does not change with the price of the shed. | No zoning fee stated. Exempt sheds must still meet zoning setbacks from property lines. | Yes. An owner may act as the contractor under Florida Statutes 489.103(7) and signs the city's Owner-Builder Acknowledgement Form; the fee is the same either way. Corporations and LLCs must hire a licensed contractor. | City Code 5-105.2(1)(g); Miscellaneous Projects fee schedule; Florida Statutes 489.103(7) Exempt up to 120 sq ft, one story and detached, with setbacks still required. Above 500 sq ft a detached building is priced as new construction by square footage. A contract over $5,000 needs a recorded Notice of Commencement before the first inspection. |
| Tucson, AZ | $300 to $699 ⚠ | About $359 for a 240 sq ft shed ($7,094 valuation): permit $227.15 + 50% plan review $113.58 + 1% filing fee $18.54. The page estimates about $108 for a site-plan-only shed. | Valuation table: detached storage at $29.56 per sq ft; permit $89.45 for the first $2,000 plus $22.95 per $1,000; plan review 50%; 1% filing fee. | Zoning and engineering review is part of the permit. A Design Development Option for setback or height relief is $278.07. | A homeowner or contractor may apply. Owner-builders file the Owner/Builder Affidavit under A.R.S. 32-1121.A.5 and must not sell or rent the home for a year. | PDSD FY27 fee schedule (eff. 2026-07-01); Construction Valuation Table Every shed needs a permit; there is no size exemption. A detached shed under 200 sq ft with no utilities needs only a site plan and zoning review, with no building inspections. A shed in a Historic Preservation Zone also needs design review. |
| Tulsa, OK | Under $150 | $75.50 for a 10x12 shed (120 sq ft), which needs only a residential zoning clearance. Title 49 sets an $80 minimum for any permit, which on a literal reading also covers the $75.50 zoning clearance; the page says to ask the Permit Center. A shed over 200 sq ft needs a building permit: $133 for a $4,000 shed kit and slab and $213 for a $9,000 built-on-site 12x20. | Flat zoning clearance for a shed up to 200 sq ft. Above that, the Title 49 building permit by job value: $133 up to $5,000 and $213 from $5,000.01 to $40,000, with the $64 application fee credited. | The $75.50 residential zoning clearance is the shed's permit up to 200 sq ft. For a shed over 200 sq ft Title 49 also lists that $75.50 fee and watershed fees, $64 for a watershed permit application and $207 for a residential stormwater impact review; the page says to ask the Permit Center which apply. | Yes. The owner, a contractor, an architect or an authorized agent can file, and homeowners building on their own single-family or duplex structure can sign the city's affidavit of exemption from the insurance requirement. Wiring a shed is a separate electrical permit pulled by a licensed, registered electrician. | Title 49 Section 303.G (residential zoning clearance) and Section 302.B (building permit fee); Tulsa residential building guidelines; Section 103 and Section 117 add-ons The building-permit exemption needs a one-story detached shed up to 200 sq ft that stands at least 5 ft from other structures, projections included; a zoning clearance is still required. Sheds on skids between 200 and 300 sq ft must be blocked and anchored. An unsigned May 2026 amendment would raise the building tiers to $137 and $219. |
| Virginia Beach, VA | Under $150 | About $98 for a 300 sq ft shed reviewed at the counter: $62.00 permit + $1.24 levy + $10.00 technology fee + $25.00 plan review. With the $100 online plan review the same shed is about $173. A one-story shed of 256 sq ft or less needs no building permit. | Non-heated space rate in the city fee sheet: $50.00 plus $4.00 per 100 sq ft or fraction thereof, then a 2% state levy on the permit fee, a $10 technology fee and plan review ($25 at the counter, $100 online). | No zoning fee stated. The application needs a Zoning Office approved site plan, and setbacks come from the zoning district. | The owner may apply, giving name, address, approximate cost of materials and signature. State law exempts one primary residence in any 24-month period from contractor licensing; a contractor files with a Class A, B or C state registration number. | City fee sheet (non-heated rate); city residential permit list; Virginia USBC 108.2 item 2 The page applies the 2% levy to the permit fee only: the fee sheet does not say whether it also applies to plan review, which would add 50 cents on $25 or $2 on $100. A shed in a flood hazard area may need a permit even when otherwise exempt, so ask first. |
| Washington, DC | Under $150 | $71.50 for a shed over 50 sq ft: DOB's flat $65 new-shed fee plus the 10% technology fee every DC permit carries. A single shed up to 50 sq ft and under 10 ft tall pays $0. Half is paid as the filing fee when you apply and the rest at issuance. | Flat new garage or new shed line in DOB's fee schedule: $65, plus 10%. The page finds no shed line for repairs and says to expect the alteration and repair rates on the cost of the work. | No zoning fee stated. The page says the Subtitle D accessory building rules still apply: not in front of the house, counted toward lot occupancy, capped at two stories and 22 feet. | A homeowner of a single-family or two-family home can apply through the Permit Wizard and attest to being the contractor of record. Wiring in the shed needs a DC-licensed master electrician. | DOB fee schedule (new garage or new shed, $65, plus 10%); 2017 DC Building Code 105.2 item 8; DOB Permit Wizard Whether a Green Building Fee is added to a shed permit is not published, so check the Permit Wizard estimate. A shed in a historic district or on a landmark needs a permit with Historic Preservation Office review, and the page says to confirm that fee when you apply. |
| Wichita, KS | Under $150 | $48 for a 240 sq ft unfinished shed that needs a building permit (over 200 sq ft): 240 × $0.20 under Table B. A 400 sq ft unfinished workshop is $80, and the same 240 sq ft shed finished as a studio is $60. A shed of 200 sq ft or less needs only the $50 location permit instead. | Table B accessory-structure rate on residential property: 20 cents per sq ft of unfinished space and 25 cents per sq ft of finished space. A shed of 200 sq ft or less pays a flat $50 location permit (Table C, item 14). | No zoning fee stated. Setbacks and rear-yard coverage come from the Unified Zoning Code, which the page could not retrieve; MABCD checks the site plan against them. | Homeowners can file location and residential building permit applications themselves on the MABCD Portal. A contractor building the shed for pay must hold an MABCD contractor license, and MABCD calls it a red flag if a contractor asks you to pull the permit. | Wichita-Sedgwick County Unified Building and Trade Code (exempt work); MABCD fee Table B, Table C item 14 and Table G The 400 sq ft exemption sometimes quoted applies in the Sedgwick County jurisdiction, not the City of Wichita. A shed over 25 and up to 400 sq ft must be anchored whether or not it needs a permit. Table G sets a civil penalty of twice the permit fee, up to $5,000, for starting without a permit, while the residential code says up to the permit fee, so the page says to confirm. |
The status is the band of the city's own worked example for a shed that needs a permit: the total the page states for the cheapest shed it prices on the ordinary path, including every city fee the example bundles (the building permit, plan review, surcharges and any zoning or planning line the page folds into the total). A lower figure the page gives only if a reviewer waives a step, a variance is granted or a fee is unpublished is noted in the cell, not used. The shed or value the example assumes differs by city, and the cell says what it is, so compare the cell, not only the band. A zoning or planning fee that the page names but leaves out of its total is described in the zoning column. The fee-basis column sorts a flat shed or accessory line first, then a valuation table, then square-footage tiers, then hourly or itemized pieces. The zoning column sorts cities with no fee stated first, then a separate zoning or planning fee, then zoning review inside the permit, then unclear. The who-pulls-it column sorts an owner first, then limited or conflicting, then licensed contractor only, then not stated. A flag marks a row where the city's own documents disagree or the page calls a figure an estimate or says to confirm it. Download the table as CSV.
What the comparison shows
The city's own example is under $150 in 18 cities and $700 or more in 8
Under $150: Nashville $47, Wichita $48, Boston $50, New Orleans $70, Kansas City $71, Washington $72, Louisville $75, Tulsa $76, Baltimore $78, Jacksonville $85, Orlando $85, St. Louis $85, Albuquerque $92, Virginia Beach $98, El Paso $110, Fort Worth $111, Honolulu $146 and New York $149. $150 to $299: Miami $154, San Antonio $162, Corpus Christi $181, Tampa $181, Milwaukee $188, Philadelphia $189, Pittsburgh $192, Raleigh $203, Houston $213, Denver $222, Charlotte $239, Cincinnati $246, Irvine $246, Las Vegas $264 and Colorado Springs $269. $300 to $699: Minneapolis $311, St. Paul $317, Riverside $323, Stockton $327, Aurora $332, Tucson $359, Los Angeles $366, Dallas $397, Sacramento $508, San Jose $585, Chicago $602 and Indianapolis $630. $700 or more: Seattle $701, Phoenix $746, Fresno $807, Portland $835, Long Beach $931, Austin $989, San Francisco $1,460 and San Diego $2,427. The median is $213. The examples are not the same shed. Nashville prices a $4,000 prefab shed, New Orleans a $2,000 prefab shed, Denver an $8,000 shed over the 200 sq ft exemption, Boston a $4,000 shed of 200 sq ft or less, Colorado Springs a $3,000 shed over 200 sq ft, Tampa a shed of up to 500 sq ft, Raleigh a 12 x 16 shed (192 sq ft), Kansas City a $5,000 shed, Stockton a $5,000 shed over 120 sq ft, Los Angeles a $5,000 one, St. Louis and Miami a $6,000 kit, Minneapolis and St. Paul a 240 sq ft shed valued at $6,000, Cincinnati a shed valued up to $4,000, Charlotte and Pittsburgh an $8,000 shed, Portland a 240 sq ft shed declared at $12,000, Albuquerque, Sacramento and Seattle 140 sq ft sheds, Long Beach, San Francisco and Irvine 150 sq ft sheds, Baltimore a 12x14, Jacksonville a small shed under 150 sq ft and $5,000, Fort Worth a shed up to 175 sq ft, Houston, Milwaukee, San Diego and Riverside 200 sq ft sheds, Phoenix, Tucson, Dallas, Louisville, Indianapolis, Corpus Christi and Austin (by its page's reading) 240 sq ft sheds and San Antonio a 360 sq ft unfinished shed. Virginia Beach prices a 300 sq ft shed reviewed at the counter (about $173 with the online plan review), Orlando a $3,000 prefabricated shed (with four surcharges the page assumes all apply), Las Vegas the first Utility Structure size row at 200 sq ft (the page's reading, since the schedule has no shed line), El Paso a permit with one inspection (its Schedule C has no shed line and the technology fee is unstated), Washington a shed over 50 sq ft, Wichita a 240 sq ft unfinished shed, Honolulu a $5,000 shed, Aurora a $3,000 shed over 120 sq ft, Fresno the first row of its garage and carport table (333 sq ft, since the schedule has no shed line) and Tulsa a 10x12 shed (120 sq ft) that needs only a zoning clearance. New York's $130 is the minimum filing fee (a $12,000 shed files for about $149), and Philadelphia's $189 is the zoning permit for a small shed in a side or front yard. Seven examples sit at a stated minimum fee: New York $130, Miami $110, Louisville $75, Pittsburgh $130, Raleigh $124 (its building permit), Chicago $602 and Corpus Christi $146.41 (its building permit). Of the eight at $700 or more, six are on the West Coast (Seattle, Portland, Long Beach, San Francisco, San Diego and Fresno), one is Phoenix and one is Austin; San Diego's $2,427 is mostly a flat $1,501.42 plan check line and a $737.00 General Plan Maintenance Fee.
27 cities price the permit on the shed's value, 11 charge a flat line, 14 price by square footage
A valuation table sets the fee in New York, Los Angeles, Phoenix, Seattle, Miami, Portland, Charlotte, San Francisco, Minneapolis, Sacramento, Tucson, Kansas City, St. Louis, Pittsburgh, Cincinnati, Albuquerque, Long Beach, Nashville, Raleigh, New Orleans, Denver, Colorado Springs, Orlando, Honolulu, Aurora, Stockton and St. Paul. The valuations differ: $72.18 per sq ft in Seattle, $71.07 in Long Beach, $71 in San Francisco, $69.64 in Phoenix and Sacramento, $34.99 in Albuquerque and $29.56 in Tucson; Portland values a new shed at 50% of the ICC utility figure; Kansas City, St. Louis and Pittsburgh work from the stated cost ($4.33, $10 and $6.00 per $1,000 of cost), as do Nashville ($5.00 per $1,000), New Orleans ($60 plus $5 per $1,000) Denver ($35 for the first $2,000 plus $8 per additional $1,000) and Colorado Springs ($80 for the first $2,000 plus $8 per additional $1,000, with a 28% plan check) and Orlando ($66.24 for the first $1,000 plus $4.41 per additional $1,000, with four surcharges), Honolulu ($12 plus $2.20 per $100 up to $20,000, with 20% plan review), Aurora (its fee calculator, $166 plus an equal plan review line on a $3,000 shed), Stockton (its Residential Fees Fixed Table, $230 plus $97 plan check on $5,000) and St. Paul ($106 for the first $2,000 plus $21 per additional $1,000, with 65% plan review); Raleigh uses 0.38% of an ICC-table value ($62.26 per sq ft for a utility building) with a $124 minimum. A flat shed or accessory line is used in San Antonio, San Diego, Philadelphia, Jacksonville, Indianapolis, Baltimore, Tampa, Boston, El Paso, Washington and Tulsa: Boston charges a flat $50 Use of Premises permit on every shed, Tampa charges $177 plus the 2.5% surcharge, Baltimore charges $50 for a shed over 100 sq ft, Jacksonville $85 for a small shed, San Antonio $150.00 for an unfinished one, Indianapolis $140 plus $490, San Diego a $1,501.42 plan check line, El Paso $110 for one inspection or $160 for two plus a technology fee, Washington $65 plus 10% and Tulsa a flat $75.50 zoning clearance for a shed up to 200 sq ft. Square-footage pricing is used in Chicago, Houston, Dallas, Fort Worth, Milwaukee, Louisville, Austin, Virginia Beach, Las Vegas, Wichita, Fresno, Riverside, Corpus Christi and Irvine: Riverside's $0.80 per sq ft, Corpus Christi's $0.146 plan review plus $0.461 per sq ft with a $146.41 minimum, Irvine's nearest line at $0.54 plan check plus $0.66 inspection per sq ft, Austin's $591.69 plan review plus $1.972 per sq ft over 200 and a $318.48 base fee, Houston's tier table, Dallas's $1.07 per sq ft, Fort Worth's $61.01 up to 175 sq ft, Milwaukee's $0.45 per sq ft above 150 sq ft, Louisville's $.13 per sq ft with a $75 minimum, Chicago's area formula, where the $602 minimum controls, Virginia Beach's $50.00 plus $4.00 per 100 sq ft, Las Vegas's Utility Structure row ($264 at 200 sq ft), Wichita's 20 cents per sq ft of unfinished space and Fresno's U-1 Garage, Carport table, whose first row is $806.86. Dallas cites Texas law barring value-based residential fees, and Houston, Fort Worth, Austin and Corpus Christi cite it too. San Jose is the one hourly schedule: San Jose bills $211 processing, $315 an hour of inspection time and $325 an hour of plan check.
14 cities add a separate zoning or planning fee on top of the building permit
Fourteen pages name a zoning or planning charge that sits beside the building permit: Portland, Philadelphia, Charlotte, Indianapolis, San Francisco, Sacramento, Pittsburgh, Albuquerque, Long Beach, Nashville, Denver, Colorado Springs, Tulsa and Riverside. The amounts are Portland's $125 zoning inspection (included in its $835), Philadelphia's $189 zoning permit, Charlotte's $65 zoning and $50 stormwater review (a shed 12 ft or less pays only a City zoning use permit, $330 on the FY2025 sheet), Indianapolis's $140 Improvement Location Permit, San Francisco's $504 or more from Planning (about $550 in its example), Sacramento's $132 exemption form fee and Planning review at 15% of plan review with a $263 minimum (left out of its $508), Pittsburgh's $1.00 per $1,000 with a $50 minimum, Albuquerque's $25 or $45 zoning review (left out of its $92), Long Beach's zoning plan check of 0.5% of valuation ($237 in its example), Nashville's $25 zoning examination fee and Denver's zoning permit of $35 plus 50 cents per $1,000 (about $41 on $12,000), both in their totals, Colorado Springs's $130 city zoning fee plus $25 IT fee, also in its total, Riverside's $82 Planning over-the-counter fee, in its total, and Tulsa's $75.50 residential zoning clearance, which is the whole permit for a shed up to 200 sq ft (with $64 and $207 watershed fees above that). Tucson folds zoning review into the permit. Three more cases are unclear: Phoenix lists a $98 plot plan review that may or may not be charged on a shed, Cincinnati charges a $158.55 Zoning Certificate of Compliance on a shed under 100 sq ft that skips the building permit, with no zoning fee stated for a permitted shed, and Raleigh lists a $271 residential zoning permit that may also apply. The other 35 pages state no zoning fee; they still apply setbacks, height caps and lot coverage, but without a priced filing.
Plan review, surcharges and fixed add-ons are often most of the total
Plan review is a share of the permit fee in several cities: 20% in Honolulu, 25% in Houston, 40% in Seattle, 50% in Tucson, 57% in Raleigh, 28% in Colorado Springs, 65% in Albuquerque, Minneapolis, Portland and St. Paul, 85% in Long Beach (plus the zoning plan check), 90% in Los Angeles and 100% in Phoenix, where it doubles a $373 permit fee to $746. Milwaukee charges a flat $50 or $75 review, San Diego a $1,501.42 plan check line, New Orleans $1 per $1,000 with a $60 minimum on the fee schedule and $120 on its estimator page, and Denver 20% ($100 minimum) for express review or 50% for standard review. Surcharges add to the base: Portland's 12% state surcharge ($43.19 on its example), two 4% surcharges in San Antonio, 1.6% in Milwaukee, 5% plus $6.50 in Seattle, about $11 per $100 of fee in Cincinnati, a 0.0005 state surcharge in Minneapolis and St. Paul, four percentage-based surcharges in Sacramento ($71.32 on its $508) a 2.5% Florida surcharge in Tampa, a 10% codes tech fee in Nashville, a 4% technology fee in Raleigh and $4 of state surcharges in Miami on top of a county surcharge the code does not quantify, a 2% state levy plus a $10 technology fee in Virginia Beach, four surcharges in Orlando that the page assumes all apply, a 10% technology fee in Washington a $2 technology fee in Las Vegas, a 12.83% General Plan surcharge plus a $23.79 technology surcharge in Fresno, a 14% surcharge in Riverside, a 10% automation fee plus a $31.88 issuance fee in Irvine and a 4.5% surcharge on starred fees in Corpus Christi. Jacksonville's $85 leaves out Florida's 1% and 1.5% surcharges. The biggest fixed add-ons are San Diego's $737.00 General Plan Maintenance Fee (about 30% of its $2,427), Dallas's possible $577 minimum plan review (which would take its $397 to about $974), Chicago's $602 minimum for a shed whose area formula gives $33, and the Fire Department fees in Sacramento ($260 + $294 + $176) that may be routed on a storage shed. New York's filing fee is only the DOB part: a PE or RA's fee to prepare the filing is extra.
Wiring adds its own permit on 26 pages that price it; 8 cities permit every shed
Most pages say a light or outlet in the shed needs an electrical permit even when the shed itself is exempt, and 26 put a price on it: Albuquerque ($47 administrative charge plus $1.50 per outlet), Baltimore ($6 per circuit), Chicago ($75 or $150), Cincinnati ($121.20 from the Inspection Bureau, Inc.), Colorado Springs ($50 attached to the building permit), Corpus Christi ($0.075 per sq ft with a $146.41 minimum), El Paso ($110 plus $1.17 per outlet), Houston ($91.06 minimum), Indianapolis ($169), Kansas City ($52), Long Beach ($100 minimum), Louisville ($75 up to $750 of work, $100 above), Miami (at least $110 plus $40), Milwaukee ($100 minimum plus $25), Minneapolis ($55 + $25 + $1 on the state homeowner form), Nashville ($75 minimum), Orlando ($68.23 for the first $1,000 of work), Philadelphia ($63 minimum plus $7.50), Pittsburgh (about $142), Portland ($194.88), Raleigh (about $129 minimum), San Antonio ($57.50 base), Sacramento ($105), Seattle ($105.12 plus a $55.48 admin fee), San Francisco ($305) and St. Louis ($85). Eight cities have no size exemption at all, so every shed there needs a permit: Miami, Jacksonville, Fort Worth, Tucson, New Orleans, Orlando, Raleigh and Nashville (Nashville's permit list starts at 100 sq ft and does not address a smaller shed). Los Angeles has no size rule either but exempts work valued at $2,500 or less. Their examples are Nashville $47, New Orleans $70, Jacksonville $85, Orlando $85, Fort Worth $111, Miami $154, Raleigh $203 and Tucson $359 (a 240 sq ft shed). For the size limit in the other 45 cities, see the size exemption page.
Who may pull it: the owner in 44 cities, licensed contractors only in 2
44 pages say an owner may pull the building permit, usually with a condition: Los Angeles, Chicago, Houston, Phoenix, Miami, Portland, San Antonio, San Diego, San Jose, Jacksonville, Charlotte, Indianapolis, San Francisco, Sacramento, Fort Worth, Milwaukee, Tucson, Kansas City, St. Louis, Pittsburgh, Cincinnati, Albuquerque, Long Beach, Tampa, Nashville, Raleigh, New Orleans, Denver, Austin, Colorado Springs, Virginia Beach, El Paso, Orlando, Las Vegas, Washington, Wichita, Honolulu, Aurora, Fresno, Tulsa, Stockton, Riverside, St. Paul and Corpus Christi. The conditions include 12 months of residence in San Jose, San Diego, Sacramento and Fresno, owning the home for 12 months after the project in San Antonio, living in the home for a year in Cincinnati, not selling or renting for a year in Phoenix and Tucson, not selling or leasing in Miami, one homeowner permit per 12 months in Albuquerque, once a calendar year in Chicago and owner-occupancy in Jacksonville, Charlotte, Kansas City, Milwaukee, St. Louis and Pittsburgh, a primary residence the owner lives in for Colorado Springs, and a primary residence under NRS 624.031(5) with a Contractors Board affidavit in Las Vegas. El Paso issues a homestead permit with a notarized homeowner affidavit (electrical work stays with a registered contractor), Orlando owner-builders sign a declaration in person, Washington lets a one- or two-family homeowner attest to being the contractor of record, and Virginia Beach lets the owner apply with name, address and materials cost. Nashville allows a self permit with two notarized affidavits (an LLC, trust or rental owner only for work under $25,000), Raleigh the notarized Owner Exemption Affidavit that commits the owner to occupy the home for twelve months, Tampa an Owner-Builder Acknowledgement Form (corporations and LLCs must hire a licensed contractor), New Orleans Form R-1364 and an affidavit that does not cover property for sale or rent, and Denver an owner of a one-family house through Admin 131.4. Stockton asks for the Owner/Builder Declaration, Riverside the Property Owner Package, St. Paul DSI's Homeowner's Building Permit Affidavit from a homesteading owner of a one- or two-family home and Corpus Christi a homestead owner. Two pages say licensed contractors only for the permitted shed: New York and Dallas. New York files a shed that needs a permit through a PE or RA and issues the work permit to a Registered General Contractor; Dallas lets a homestead owner act as contractor only for portable accessory buildings, so a permanent shed over 200 sq ft goes through a contractor registered with the city. Philadelphia, Baltimore, Boston and Irvine are limited or conflicting: Philadelphia's owner may do the work only if no electrical or plumbing permit is needed, Baltimore's code lets an owner apply while DHCD says an MHIC-licensed contractor is required, and Boston lets only the owner of an owner-occupied one- or two-family home file, though ISD recommends a licensed contractor, and Irvine permits home work to state-licensed contractors with one very limited owner-builder exception. Seattle, Minneapolis and Louisville do not say who may pull the building permit. Electrical and plumbing are narrower: Chicago, Philadelphia and Pittsburgh limit electrical work to licensed electrical contractors or trade-licensed workers, and Houston issues electrical permits only to registered master electricians.
Where the city's documents disagree or the page calls the figure an estimate
Albuquerque: zoning review is $25 in one city document and $45 in another, and the $34.99 valuation may rise for applications from 2026-07-01. Baltimore: the building code lets the owner or lessee apply, while DHCD says one- and two-family construction needs an MHIC-licensed contractor. Charlotte: the $330 zoning use permit for a shed 12 ft or less is the FY2025 figure, and the FY2026 sheet was not found. Chicago: the scenario table lists $300 but the 2026 tables state a $602 minimum, which the page budgets. Dallas: Chapter 52 has no shed fee line, so the $397 is an estimate. Long Beach: the fees are those in force before 2026-10-01, with a new schedule approved on 2026-09-08. Miami: the rate is printed as 0.50 with no percent sign and read as 0.5%, and the county surcharge is unquantified. Philadelphia: the building code exempts sheds to 200 sq ft but L&I's FAQ says sheds over 130 sq ft are not permitted by zoning, so the building fee applies only after a variance. Phoenix: the $98 plot plan review may or may not apply to a shed. Pittsburgh: PLI says 200 sq ft is exempt, City Planning's FAQ says 120, and attached 1-2 family houses may fall in the commercial category with a $605 minimum. Portland: the example uses a declared $12,000 valuation because the ICC table is paid. Sacramento: one handout says a permit is needed at 120 sq ft or greater while the exempt list says not greater than 120, and the $508 leaves out Planning fees. San Diego: a 2.5-hour impact-fee assessment charge may or may not apply to a shed. San Francisco: DBI's FAQ says 120 sq ft and 10 ft, while its summary page and the code say 100 sq ft and 8 ft. San Jose: the Building Official can adjust the tier, so the totals are published arithmetic, not a quote. St. Louis: the ordinance printed $6 per $1,000, the Division charges $10, and the web list still says 50 sq ft. Tampa: City Code 5-105.2(1)(g) exempts sheds of 120 sq ft or less while a 2020 Construction Services sheet says 150, and the page budgets the code's 120. Raleigh: the page budgets plan review at 57% ($203 in all) while the guide's minimum-fee line would make it $258. New Orleans: the plan-review minimum is $60 on the fee schedule and $120 on the estimator page, and the historic-district surcharge is read three ways. Nashville: the permit list starts at 100 sq ft and does not address a smaller shed. Tucson: PDSD does not publish its fee for a site-plan-only shed, so the page's $108 low end is an estimate. Virginia Beach: the fee sheet does not say whether the 2% levy also applies to plan review, so the page applies it to the permit fee only. El Paso: Schedule C has no shed line and does not state the technology fee, and prints value-tiered electrical lines (503-508) beside the itemized ones the page uses. Orlando: the city's older accessory structure checklist says a recorded Notice of Commencement is needed above $2,500 while its residential requirements page says $5,000 (the page budgets $5,000), and the schedule does not say which jobs the four surcharges cover, so the page assumes all four. Las Vegas: the Administrative Code exempts a shed that does not exceed 200 sq ft while the homeowner guide says 200 sq ft or larger needs a permit, and the schedule has no shed line, so the page reads the Utility Structure line. Washington: whether a Green Building Fee is added to a shed permit is not published. Wichita: the 400 sq ft exemption sometimes quoted applies in the Sedgwick County jurisdiction, not the City of Wichita. Fresno: the schedule has no shed line and does not say how a smaller building is priced, so the $807 is the first row of the U-1 Garage, Carport table. Tulsa: Title 49 sets an $80 minimum for any permit that may also cover the $75.50 zoning clearance, and the page says to ask the Permit Center. Aurora: the handbook and the chart word the 120 sq ft line differently. Colorado Springs: the Pikes Peak Regional Building Code exempts a shed that does not exceed 200 sq ft while PPRBD's homeowner page words the limit as less than 200 sq ft, and the page says a shed at exactly 200 is worth a call. Riverside: the schedule marks only some lines with a caret for the 14% surcharge while the city's fee sheet applies it to all plan check and permit fees, and the division's 400 sq ft minimum may still apply. Corpus Christi: the schedule's period has ended and it is still the newest posted. Irvine: the schedule has no shed line, so the page prices item 6 and says the plan checker decides. The table flags these rows rather than resolving them.
Method
The 53 cities are the ones whose BuildPermitGuide pages have been rewritten from primary sources as of October 2026: the city's adopted code and exemption list, its permit page or bulletin, its current fee schedule or ordinance and its contractor and owner-builder rules, each fetched and quoted on the city's shed permit page. The status in the table is the band of the city page's own worked example for a shed that needs a permit, using the total the page states for the cheapest shed it prices on the ordinary path and every city fee the example bundles; the shed size or value differs by city and the cell says what it is. Where a page also gives a lower figure that depends on a reviewer's waiver, a variance or a fee the city does not publish, the cell notes it and the status does not use it. The pricing, zoning and owner columns are the page's fee section and scenario table, and the owner counts come from its licensing paragraph. Contractors' own prices, engineers' and architects' drawing fees and the cost of an outside inspection agency are never included. Nothing in this table is taken from a model code or another city's schedule; where a city's documents disagree or a page calls a figure an estimate, the row carries a flag instead of a resolution. Each city page carries the date its sources were last verified, and the change log records when a cited document changes.
BuildPermitGuide, “How Much Does a Shed Permit Cost? 53 Cities Compared” (2026), https://buildpermitguide.com/research/shed-permit-fees/Questions, corrections or a city you want added: contact us.
Frequently asked questions
The city pages behind this table
Each page quotes the code section, exempt-work list and fee schedule it relies on and records the date they were last verified.
- Albuquerque, NM
- Aurora, CO
- Austin, TX
- Baltimore, MD
- Boston, MA
- Charlotte, NC
- Chicago, IL
- Cincinnati, OH
- Colorado Springs, CO
- Corpus Christi, TX
- Dallas, TX
- Denver, CO
- El Paso, TX
- Fort Worth, TX
- Fresno, CA
- Honolulu, HI
- Houston, TX
- Indianapolis, IN
- Irvine, CA
- Jacksonville, FL
- Kansas City, MO
- Las Vegas, NV
- Long Beach, CA
- Los Angeles, CA
- Louisville, KY
- Miami, FL
- Milwaukee, WI
- Minneapolis, MN
- Nashville, TN
- New Orleans, LA
- New York, NY
- Orlando, FL
- Philadelphia, PA
- Phoenix, AZ
- Pittsburgh, PA
- Portland, OR
- Raleigh, NC
- Riverside, CA
- Sacramento, CA
- San Antonio, TX
- San Diego, CA
- San Francisco, CA
- San Jose, CA
- Seattle, WA
- St. Louis, MO
- St. Paul, MN
- Stockton, CA
- Tampa, FL
- Tucson, AZ
- Tulsa, OK
- Virginia Beach, VA
- Washington, DC
- Wichita, KS
Related: Permit fee calculator: 43 cities · What size shed can you build without a permit · Shed Permit Guide · How much does a building permit cost · Pool permit fees compared · Shed permits in all 50 cities · Which cities changed their permit fees in 2026 · Permit fee change log · Open data exports