What's Required in Honolulu

  • Sheds of 120 sq ft or less in total floor area, one story, accessory to a house, need no permit.
  • Larger sheds need a building permit with plans filed in HNL Build and uploaded to ePlans.
  • Keep the shed out of required yards: in general 10 ft front and 5 ft side and rear for a house lot.
  • Check flood zone and any DPP advisory on Property Search before you build, even an exempt shed.
  • Electrical or plumbing in a shed must be done by state-licensed contractors.
  • Plan review fee is 20% of the permit fee, paid when plans are accepted.

Do You Need a Permit for a Shed in Honolulu?

Not for a small one. The Department of Planning and Permitting (DPP) exempts tool or storage sheds not exceeding 120 square feet as accessories to dwellings. The ordinance behind it, ROH 18-3.1(b) as rewritten by Ordinance 23-13, covers one-story detached buildings accessory to a house and used as tool and storage sheds, playhouses and similar uses, provided that the aggregate floor area does not exceed 120 square feet. Aggregate is the word that catches people: an existing shed counts, so a second shed that pushes the total past 120 sq ft needs a permit.

Anything bigger, taller than one story, or used as living or work space is a building that needs a building permit. A shed is not on DPP's list of jobs that qualify for an instant online permit, so a shed over the limit goes in as a building permit with plans through HNL Build and ePlans.

Honolulu Shed Rules by Scenario

What you are doingCity filingRule
One storage shed, 120 sq ft or lessNo permitROH 18-3.1(b)(16)
Two sheds totaling more than 120 sq ftBuilding permit with plansLimit is aggregate floor area
Shed over 120 sq ftBuilding permit with plansNot on the instant permit list
Shed with wiring or a sinkBuilding permit, licensed tradesElectrical and plumbing work need permits
Shed up to 120 sq ft in a flood zoneAsk DPP firstThe 120 sq ft exemption has no flood-zone condition, but flood rules still apply to the work.
$5,000 shed needing a permit$122 + $24.40 plan reviewROH 18-6.1, 18-6.2
$12,000 shed needing a permit$276 + $55.20 plan reviewROH 18-6.1, 18-6.2

Where Can a Shed Go on a Honolulu Lot?

The exemption covers the permit, not zoning. DPP says that although a permit may not be required, all work must follow the city's laws and ordinances. For a house, DPP's general yards are 10 feet front and 5 feet side and rear (larger above FAR 0.6); check your district for sheds. The Land Use Ordinance (LUO 21-4.30) lists what may stand inside a required yard: utility poles, clotheslines, unroofed trash enclosures, fences and walls, small equipment and other structures not more than 30 inches high. A storage shed is not on that list, so plan to keep it out of the required yards and inside the lot's building area. Your parcel's zoning and yards are on DPP's Property Search.

How Much Is a Shed Permit in Honolulu?

Honolulu prices every building permit by the value of the work (labor and materials). For jobs from $1,000.01 to $20,000, DPP's fee calculator charges $12 plus $2.20 for every $100 of value, rounded up. A $5,000 shed is 50 × $2.20 + $12 = $122. A $12,000 shed is 120 × $2.20 + $12 = $276. Because a shed needs plans, add the plan review fee, which is 20% of the permit fee: $24.40 and $55.20, for totals of $146.40 and $331.20. Plan review is paid when the plans are accepted; the permit fee is paid at issuance, and DPP takes checks only for permits with plans.

Who Can Build It?

A homeowner can build a permitted shed under Hawaii's owner-builder exemption (HRS 444-2.5) for their own use, after registering for it, but any electrical or plumbing work must be done by licensed contractors. Exempt sheds need no permit, but zoning and any HOA rules still apply.

How to Get a Shed Permit in Honolulu

1

Measure your total shed area

Add up all existing and new sheds. At 120 sq ft or less in total you can build without a permit.

2

Check zoning and flood status

Look up your lot on DPP's Property Search for zoning, flood zone and any advisory, and place the shed outside required yards.

3

Apply in HNL Build

Create an HNL Build account and submit a building permit application, then upload plans to ePlans when emailed.

4

Pass plan review and pay

Pay the 20% plan review fee at acceptance, answer reviewer comments, then pay the permit fee by check at issuance.

5

Build and call for inspection

The contractor that signed the permit schedules the inspection, and the inspector closes the permit.

Frequently Asked Questions

Up to 120 square feet of floor area in total. ROH 18-3.1(b) exempts one-story detached sheds, playhouses and similar buildings accessory to a house, provided the aggregate floor area does not exceed 120 square feet. If you already have a shed, its floor area counts toward the limit.
Plan on no. A shed is a structure, and the Land Use Ordinance only lets a short list of items sit inside required yards, such as clotheslines, fences, small equipment and structures not more than 30 inches high. For a house, DPP's general yards are 10 feet in front and 5 feet at the sides and rear, larger above FAR 0.6.
No. DPP's instant permit list for single-family homes covers plumbing fixtures and piping, solar water heating, meter upgrades, rewiring, PV, EV chargers, split system air conditioning, new fences and some repairs. A shed over the limit needs a regular building permit with plans submitted through HNL Build and ePlans.
It depends on the value of the work. For $1,000.01 to $20,000 of work the fee is $12 plus $2.20 per $100. A $5,000 shed pays $122 plus a $24.40 plan review fee, $146.40 in all. A $12,000 shed pays $276 plus $55.20, $331.20 in all.
Yes. DPP says that although a permit may not be required, all work shall be in accordance with the laws and ordinances of the city. That includes zoning yards, the 75 percent cap on impervious surface for newer homes, and any deed or homeowner association rules.