What's Required in Wichita
- A site plan showing the shed's location, the property lines and any easements.
- A location permit from MABCD before installing any shed of 200 sq ft or less.
- A residential building permit for any shed over 200 sq ft.
- Anchoring to the earth or a permanent concrete foundation for sheds over 25 and up to 400 sq ft.
- A location clear of floodplains, floodways, easements and setbacks, which MABCD checks on the site plan.
- An MABCD-licensed contractor if someone else builds it for pay.
- A post-construction placement inspection for Wichita location permits.
Do I need a permit for a shed in Wichita?
Every shed in Wichita needs some filing with the Metropolitan Area Building and Construction Department (MABCD), the joint Wichita-Sedgwick County department that issues building permits for the city. What changes is which one. Under the Wichita-Sedgwick County Unified Building and Trade Code, a one-story detached storage building (occupancy Group S or U) is exempt from the building permit if its floor area does not exceed 200 square feet, but only if you get a location permit from MABCD before you put it up. Above 200 square feet you need a full residential building permit.
Two details trip people up. First, the 400 sq ft exemption you may read about applies in the Sedgwick County Jurisdiction, which is the unincorporated county and the small cities that contract with MABCD, not the City of Wichita. Second, only a movable storage cabinet with doors and a footprint of 25 square feet or less skips the location permit entirely.
What does the location permit check?
You submit a site plan. MABCD staff check before you build that the spot is not in a floodplain, floodway, easement or setback and does not cross onto a neighbor's lot. In Wichita, staff then come out after the shed is built to confirm it sits where the location permit says. The location permit costs $50 (Table C, item 14).
How much is a shed building permit in Wichita?
Table B prices accessory structures on residential property by floor area: 20 cents per square foot of unfinished space and 25 cents per square foot of finished space. MABCD's permits page repeats the 20-cent rate for detached accessory structures. Worked examples:
- A 240 sq ft unfinished shed: 240 × $0.20 = $48.
- A 400 sq ft unfinished workshop: 400 × $0.20 = $80.
- The same 240 sq ft shed finished as a studio: 240 × $0.25 = $60.
Table B also lets the MABCD Director temporarily reduce these fees by up to 20%, so your invoice can come in lower. A $50 re-inspection fee may be charged when an inspection is called before the work is ready. Table C also lists plan review at 60% of the building permit fee; MABCD's fee calculator labels that charge commercial and residential plans are reviewed at the counter with a permit writer, so ask whether it applies before you budget it.
| What you are doing | City filing | Rule |
|---|---|---|
| Movable storage cabinet with doors, 25 sq ft footprint or less | None | No location permit needed |
| Storage shed up to 200 sq ft, one story | Location permit, $50 | Site plan checked before; placement inspected after |
| Shed over 200 sq ft, unfinished | Building permit | 20 cents per sq ft |
| Finished studio or office building | Building permit | 25 cents per finished sq ft |
| Any shed over 25 and up to 400 sq ft | Anchoring | Tie down to the earth or set on a permanent concrete foundation |
| Adding power to the shed | Covered or electrical permit | Owner-occupants may wire after the homeowner exam |
Does my shed have to be anchored?
Yes. Every detached accessory structure larger than 25 and up to 400 square feet must be tied down to the earth using the City of Wichita's anchoring standards or be attached to a permanent concrete foundation. That applies to exempt sheds too: the exemption covers the paperwork, not the construction rules. Playhouses and tree houses are listed separately as exempt; ask MABCD whether a location permit applies.
Where can I put it?
Setbacks and how much of the rear yard an accessory building may use come from the Wichita-Sedgwick County Unified Zoning Code, which MABCD checks when it reviews your site plan. We could not retrieve the zoning code text, so confirm placement with MABCD at 316-660-1840 before you buy a kit.
Who can apply?
Homeowners can file location and residential building permit applications themselves on the MABCD Portal. A contractor building the shed for you must hold an MABCD contractor license; if a contractor asks you to pull the permit, MABCD calls that a red flag.
How to Get a Shed Permit in Wichita
Measure the floor area
Up to 200 sq ft means a location permit; over 200 sq ft means a building permit.
Draw a site plan
Show the shed, property lines, easements and distances to the house and lot lines.
Apply on the MABCD Portal
Homeowners can file location and residential building applications online at mabcdportal.sedgwickcounty.org or by appointment.
Pay and build
Pay $50 for a location permit or 20 to 25 cents per sq ft for a building permit, then build and anchor the shed.
Pass the inspection
Schedule the inspections MABCD requires on the portal, through final. For a location permit, MABCD checks the shed sits where the permit says.