How Much Does a Pool Permit Cost? 53 Cities Compared

The city's own worked example for an in-ground pool permit runs from $223 in Milwaukee to $3,200 in San Francisco across the 53 largest U.S. cities we cover, with a median of $587. Cities price it as a flat pool line, a valuation table, a rate per square foot or gallon, or an hourly review, and 43 exempt a small above-ground pool, sourced city by city.

Published October 2026 Research

Short answer: the city's own worked example for a residential in-ground pool runs from $223 in Milwaukee to $3,200 in San Francisco across the 53 largest U.S. cities we cover, and the median is $587. Eighteen are under $500: Baltimore, Corpus Christi, Denver, El Paso, Jacksonville, Kansas City, Louisville, Milwaukee, Nashville, New Orleans, New York, Orlando, Philadelphia, Raleigh, Tulsa, Virginia Beach, Washington, Wichita. Twenty-one are $500 to $1,000: Albuquerque, Austin, Boston, Chicago, Colorado Springs, Fort Worth, Fresno, Honolulu, Houston, Indianapolis, Irvine, Las Vegas, Miami, Phoenix, Pittsburgh, Riverside, San Antonio, St. Louis, Stockton, Tampa, Tucson. Ten are $1,000 to $2,000: Aurora, Charlotte, Cincinnati, Dallas, Los Angeles, Minneapolis, Portland, San Jose, Seattle, St. Paul. Four are over $2,000: Long Beach, Sacramento, San Diego, San Francisco. Fifteen cities charge a flat pool fee, 29 price the permit on the pool's value, Dallas, Jacksonville, Washington, Corpus Christi and Irvine price it by square foot or gallon, and Fort Worth, Raleigh and San Jose build it from per-trade or hourly pieces, and Houston has no pool line. An above-ground pool is exempt from the building permit in 43 cities if it is small or shallow (most often under 24 inches deep and 5,000 gallons), and 46 pages add an electrical permit for the pump and bonding. We read each city's fee schedule, exemption list and licensing rule and recorded the city's own reading.

18 / 21 / 10 / 4cities whose own in-ground example is under $500 / $500 to $1,000 / $1,000 to $2,000 / over $2,000
$223–$3,200the page's own total for an in-ground pool, Milwaukee to San Francisco; the median is $587
46pages require or bundle an electrical permit for the pump and bonding (3 fold it into one combination permit: Long Beach, Los Angeles and San Diego)
6cities send an in-ground pool to a second agency that charges its own fee: Charlotte, Houston, Sacramento, Seattle, Minneapolis and Cincinnati

Every row links to the city page that quotes the rule, so you can read the source language yourself. The table sorts by any column.

All 53 cities

CityIn-ground pool permitThe city's own in-ground exampleHow the fee is pricedAbove-ground poolSchedule the city cites, and notes
Albuquerque, NM $500 to $1,000 About $662 for a $40,000 pool: building permit $448.19 ($271.63 + $176.56 plan review) + electrical $107 + plumbing $107. About $803 at $60,000. UAC Table 112-A on the stated value, times 0.50, plus 65% plan review. Each trade permit is a $47 administrative charge + a $60 pool item. No building permit if prefabricated, under 54 in deep, up to 5,000 gallons and entirely above ground. A hard-wired pump needs an electrical permit ($47 + $60). 2024 Uniform Administrative Code (UAC) Table 112-A; Integrated Development Ordinance; city pool handout
Gunite needs engineered drawings and fiberglass an ICC-ES report. The owner-occupant may pull the building permit; trades need a licensed contractor or a 75% exam score. Plan review takes about two and a half weeks. The page says zoning and hydrology fees are collected with plan review but prices neither, so the $662 and $803 examples leave them out.
Aurora, CO $1,000 to $2,000 $1,890 for a $40,000 in-ground pool: $945 permit fee + $945 plan review, from the city's fee calculator (Adams County). A $75,000 pool is $2,811 ($1,405.50 + $1,405.50). For the $40,000 pool the calculator estimated $750 in taxes on top. Valuation: the city's permit fee calculator prices the permit fee on the pool's value and adds a plan review line of the same amount, which it labels if applicable; the page includes it as its reading of the chart that marks pools as needing a plan submittal. Pools are not on the flat-rate fee sheet. Exempt only if less than 24 inches deep (an inflatable or wading pool). An above-ground pool 24 inches deep or more needs a building permit with plans and framing, electrical and plumbing inspections; the page says to check the depth, since the chart line is 24 inches. City valuation-based permit fee calculator; Do It Right home improvement handbook (March 2019) and Building Division permit chart
A $10,000 hot tub is a $334 permit fee, and the chart lists no plan submittal for hot tubs, so the plan review line may not be charged. Use tax is 3.75% of materials cost, plus 0.25% in Arapahoe County, and paying online by credit card adds a fee of at least 2.25%.
Austin, TX $500 to $1,000 $146.15 Small Projects Plan Review is the one row that names pools; by the page's reading the $318.48 building base fee and the $183.69 electrical base fee at issuance bring the total to $648.32, or $761.08 with the $112.76 Application Processing Fee. An autofill or heater adds the $220.47 plumbing base fee: $868.79 ($981.55). The page names no pool size. Flat: Small Projects Plan Review at submittal, then flat permit base fees at issuance, not valuation (Texas Local Government Code 214.907 bars value-based residential fees). The schedule does not itemize a pool permit fee. Exempt only if prefabricated and less than 24 in deep. A deeper above-ground pool goes through the Pool and/or Uncovered Deck application like an in-ground pool. FY 2026-27 residential fee schedule (Small Projects Plan Review), effective October 1, 2026; list of work exempt from building permits; Pool and/or Uncovered Deck application (form dated April 5, 2023)
The review target is 5 business days. A tree of 19 inches or more adds tree review at $566.93, and erosion and sedimentation control violations carry fines of up to $2,000.00 per day.
Baltimore, MD Under $500 $228 for an in-ground pool with a water and sewer connection and 3 new circuits: $50 + $30 + $18 = $98, + $5 tax + $125 application. An above-ground pool over 24 in deep is $178. Flat $50 pool fee for a 1-2 family home, a $125 plan-review application fee, $30 for a water and sewer connection, $6 per new circuit and a 5% permit tax. Prefabricated or inflatable pools under 24 in deep need no building permit (check zoning). Deeper above-ground pools: $50 + $3 tax + $125 = $178. Building, Fire, and Related Codes of Baltimore City 109.5.7, 109.6.1(o), 109.6.2(b), 109.6.3(j), 109.7; DHCD exempt-work list
Electrical goes only to a licensed electrician and plumbing only to a licensed master plumber. Pools go through ePlans review and belong in the rear yard only. A CHAP-district house needs historic review of the excavation first.
Boston, MA $500 to $1,000 About $725 for a $60,000 in-ground pool on the long form with all permits: $650 building permit ($50 + 60 x $10), a separate $50 Use of Premises permit and about $25 for a pump and light circuit with five devices ($20 + 5 x $1). A prefabricated pool under 24 inches deep pays the $50 Use of Premises fee only. A flat $50 Use of Premises permit for every pool, plus a building permit for pools 24 inches deep or more and every in-ground pool: $50 plus $10 per $1,000 on the long form, or $20 plus $10 per $1,000 if ISD assigns the short form. Electrical work with no change in service is $20 plus $1 per fixture, plug or outlet. A prefabricated pool less than 24 inches deep is exempt from the building permit under the state code but still needs the $50 Use of Premises permit. A deeper above-ground pool and every in-ground pool need a building permit. ISD fee schedule (edition dated 5/15/23): Use of Premises permit; ISD long-form, short-form and electrical permit fees; 780 CMR R105.2
Pumps, heaters, lights and bonding need an electrical permit from a licensed electrician, and a gas pool heater needs a gas permit at $20 + $50 each + $0.09 per 1,000 BTU. Work must start within six months of issuance.
Charlotte, NC $1,000 to $2,000 ⚠ About $1,040 for a $60,000 in-ground pool: County building $687.47 + electrical $84.08 + plumbing $59.70 + $9 + $10, plus Health $75 and City LDIRL $115. A $4,000 above-ground pool is about $338. County LUESA valuation table priced per trade permit: $59.70 to $3,000, then $12.19 per $1,000. Plus a $75 Health fee and a $115 City LDIRL. Permit if more than 24 in deep, seasonal pools included: about $337.59 for a $4,000 pool with a pump circuit. The Health ordinance and the County brochure differ on storable pools. LUESA Fee Ordinance; Mecklenburg County Public Health FY2027 fee schedule; City LDIRL fee; UDO; 2018 NC Residential Code
Three offices: County Public Health approves first ($75), the City reviews zoning (LDIRL $115, about 15 days), and the County issues building, electrical and plumbing permits. A $10 Homeowner Recovery Fund charge applies when a contractor pulls the building permit.
Chicago, IL $500 to $1,000 ⚠ $550 to $750 for a permitted in-ground pool: $400 pool fee + $150 electrical, with a $600 non-refundable deposit collected at submission. The zoning review fee is not published. Flat Table 14A-12-1204.2 line: install private swimming pool, $400. Electrical is a separate express permit, $150 for up to 10 circuits. No permit at a 1-3 unit lot if no deeper than 48 in and 5,000 gallons at 90% full, at ground level without excavation over 5 ft. A hardwired pump is a $150 express electrical permit. Table 14A-12-1204.2 as amended 2026; DOB list of work not requiring a permit; DOB pool guidance
Pools deeper than 48 in need plans sealed by an Illinois architect or structural engineer. A permanent water connection is a separate express plumbing permit. Outdoor use is limited to June 1 through September 15.
Cincinnati, OH $1,000 to $2,000 About $1,002 for a $30,000 in-ground pool: building permit about $872 ($737 + $49 processing + surcharges) + IBI electrical $130. A $50,000 pool with plumbing is about $1,475. Valuation table rounded up to the next $1,000: $173 to $4,000, $1,065 at $50,000, then $11.59 per $1,000; $49 processing; five surcharges of about $11 per $100. Permit for any pool holding 24 in of water or more, above ground included (about $376 for a $3,000 pool with IBI electrical). Inflatable or kiddie pools under 24 in need none. Cincinnati B&I FY2027 fee schedule; Inspection Bureau, Inc. pool permit; swimming pool handout; zoning 1421-33
Electrical bonding and wiring is issued by Inspection Bureau, Inc. (IBI): $60 processing + $70. A plumbing permit for new drains or fill lines is $97 before surcharges. Pools get Tier 2 review, a 5 workday target. The page says a plan review fee is paid at application but prices only the $49 processing fee, so the $1,002 example may leave plan review out.
Colorado Springs, CO $500 to $1,000 $813.92 for a $60,000 in-ground pool in PPRBD's own fee calculator, priced as Other Accessory Structure: $514 + $143.92 plan check + $1 State Statute Letter + the city's $130 zoning fee + $25 city IT fee; the page adds $100 for electrical and plumbing attachments if Table B.1 applies ($913.92). A $5,000 above-ground pool is $289.12, or $339.12 with an attached electrical permit. Table A on job value ($80 for the first $2,000 plus $8 per $1,000 to $25,000; $464 for the first $50,000 plus $5 per $1,000 to $100,000) with a 28% plan check, priced as Other Accessory Structure because the calculator has no pool type; $50 per attached trade on Table B.1. Exempt only if the pool is above ground, less than 24 in deep and holds 5,000 gallons or less. A deeper or larger above-ground pool needs a permit; on-ground portable pools skip the stamped structural plan. PPRBD fee calculator (Other Accessory Structure), Table A and Table B.1; PPRBC 105.2 item 13; PPRBD pool handout
Building permits come from the Pikes Peak Regional Building Department, a regional authority; setbacks are zoning rules reviewed by the city's Development Review Enterprise. An in-ground pool needs a structural plan stamped by a Colorado-licensed design professional. County use tax is extra unless you sign the sales tax affidavit.
Corpus Christi, TX Under $500 $419.56 for a 450 sq ft in-ground pool: $65.70 of plan review plus $207.45 for the building permit, and $146.41 for the electrical permit. A 300 sq ft pool is $336.62 and a 600 sq ft pool $510.61. The figures use the pool's surface area, because the schedule has no pool line. Rate per square foot: plan review at $0.146 plus the building permit at $0.461 per sq ft with a $146.41 minimum, and an electrical permit at $0.075 per sq ft with a $146.41 minimum. The schedule does not say which area it uses for a pool. An above-ground pool needs a permit only if it holds more than 5,000 gallons or is more than 24 inches deep; prefabricated pools under both limits are exempt. Every in-ground pool needs a permit. FY 2026 Development Fee Schedule (no pool line); Homeowner's Guide to Permitting; 2021 International Swimming Pool and Spa Code as amended
A pool takes two applications, building and electrical. The 4.5% surcharge on starred fees is about $19 on the 450 sq ft example. The page reads the $146.41 minimum line under the trade permits as the residential floor for electrical, which is our reading, so confirm with Development Services before budgeting.
Dallas, TX $1,000 to $2,000 ⚠ About $1,395 for a 400 sq ft in-ground pool: $428 permit + $577 plan review minimum + $375 for building, electrical and plumbing inspections + $15 technology fee. No pool fee line, so the page applies the single-family new-work table, $1.07 per sq ft up to 700 sq ft, plus plan review and $125 per trade inspection. Exempt only if prefabricated, with the wall completely above grade, under 24 in deep and up to 5,000 gallons. Any above-ground pool 24 in or deeper needs a Residential Pool/Spa Permit. Chapter 52 Sec. 301.2.1 and Table A-I; Planning and Development fee schedule eff. 2025-07-01; Chapter 62 (ISPSC)
Electrical (registered Master Electrician) and plumbing (Master Plumber) permits are separate, and the barrier is its own accessory structure permit. A homeowner permit does not cover a pool, so a registered contractor files. Add 10% in PD, SUP or deed-restricted areas.
Denver, CO Under $500 About $495 for a $40,000 in-ground pool: $340 building permit + $100 express review + about $55 zoning. An $80,000 pool is about $896 ($630 + $126 + about $140). Electrical, plumbing and the Sewer Use and Drainage Permit are charged separately, and card payments add 2.5 percent. Valuation table: $220 for the first $25,000 plus $8 per additional $1,000 (a $40,000 pool pays $340), then $420 for the first $50,000 plus $7 per additional $1,000 (an $80,000 pool pays $630). Express review is 20% of the permit fee with a $100 minimum; zoning is $35 plus 50 cents per $1,000, or $100 plus 50 cents per $1,000 at $80,000. A prefabricated above-ground pool less than 24 in deep and not greater than 5,000 gallons is exempt from building permits, though the pool guide still lists a zoning permit for all outdoor pools. Any other prefabricated above-ground pool needs zoning and trade permits but no residential construction permit. Denver pool permitting guide; Denver Building Code exemption for prefabricated above-ground pools; valuation fee table and zoning permit fee
Building permits are not issued until the Sewer Use and Drainage Permit is approved, and that permit has its own fees. Electrical and plumbing permits are each priced from the value of that trade's work.
El Paso, TX Under $500 $426 before technology fees for a pool with electrical and plumbing permits on the lines the page maps: $160 building + $156 electrical ($110 base plus $46 for the pool) + $110 plumbing (line 602). The page states no pool size or value, and says to confirm whether a plumbing base fee is also charged. A gas heater adds $13.76 or more. Flat $160 building permit for a residential pool or spa (FY 2027 Schedule C), plus separate electrical and plumbing permits pulled by registered contractors, each plus a technology fee whose amount Schedule C does not state. A pool under 24 in deep and under 5,000 gallons is exempt, in-ground or above ground; both limits must be met. An above-ground pool 24 in deep or more, or 5,000 gallons or more, needs the $160 building permit. FY 2027 Schedule C (pool building line; lines 602, 605 and 613); City Code 18.10.040 (Ordinance 019528); 2021 International Swimming Pool and Spa Code
Plan for the local 3 ft slip-resistant perimeter deck around at least 65% of the pool or spa in your layout and budget; the page does not price it. A gas heater may need its own gas permit.
Fort Worth, TX $500 to $1,000 ⚠ About $540 for a typical in-ground pool: building permit $406.95 (3 trades at $119 + $33.08 application + $16.87 technology) + $133 for the separate electrical and plumbing permits. Per-trade residential schedule: $119 for one trade, $238 for two, $357 for three. Trade permits add a $33.08 application fee and item fees. No building permit for a prefabricated pool at a single house up to 5,000 gallons and entirely above ground; larger above-ground pools need one. New wiring still needs an electrical permit. Fee Ordinance 26-28781 eff. 2026-10-01; Administrative Code 105.2; residential pool packet; Local Government Code 214.907
Plans need an Oncor Electric stamp before submittal, and site-built pools need a suction entrapment form. Electrical and plumbing go to Texas-licensed trades or a homestead owner. A pool closer to the street than the rear wall needs a $591 variance.
Fresno, CA $500 to $1,000 About $577.04 for a $40,000 pool: $488.57 base building fee + $62.68 General Plan surcharge + $23.79 technology surcharge + $2.00 state surcharge, before any separate electrical permit. If the pool's electrical work is billed as its own permit the base is $488.57 + $138.58 = $627.15. Flat fee: Swimming Pool / Spa - Residential, $102.72 plan check plus $385.85 inspection, $488.57. A residential pool built from a standard plan is listed at $170.37 in the plan check column. No building permit for a prefabricated pool accessory to a house that is less than 24 in deep, holds no more than 5,000 gallons and sits entirely above ground. Any other pool, including a deeper or larger above-ground one, is not on the exemption list. Master Fee Schedule effective July 1, 2026 (Swimming Pool / Spa - Residential); Single Family Homes exemption list
Pool wiring is a $111.50 simple electrical item, and stand-alone electrical, mechanical and plumbing permits carry a $27.08 issuance fee, so separately billed electrical adds $138.58.
Honolulu, HI $500 to $1,000 $962.40 for a $40,000 pool: an $802 permit fee plus $160.40 plan review (20%). A $75,000 pool is $1,603.20. Water and wastewater agencies may add their own charges, and DPP's calculator covers only the building permit and plan review. Value of work under ROH 18-6.2: from $20,000.01 to $50,000 the fee is $82 plus $18 per $1,000; from $50,000.01 to $100,000 it is $286 plus $14 per $1,000. Plan review is 20% of the permit fee, paid when plans are accepted. No clear rule: DPP does not publish a separate rule for above-ground pools. The exemption list has no pool item, and the only water feature on it is an ornamental pond less than 24 inches in depth; the page says to ask DPP before installing a portable pool with wiring or plumbing. ROH 18-3.1(a) and (b); ROH 18-6.1 and 18-6.2
Pool plumbing must be installed by a licensed plumbing contractor and wiring by a licensed electrician; an owner-builder can manage the job but cannot do the plumbing or wiring. A pool is not on DPP's instant list, so it is a building permit with plans in HNL Build and ePlans.
Houston, TX $500 to $1,000 ⚠ About $500 for a typical in-ground pool: Health Department plan review $127.56 + Swimming Pool Permit of at least $124.62 + electrical and gas permits. The two filings alone are at least about $252. Flat $94.00 Health plan review + $33.56 admin. The pool permit fee comes from the city schedule, which has no pool line, so the page uses the $91.06 structural minimum + $33.56 admin. No clear rule: the Health review does not apply to above-ground pools or spas, and the page says to ask Structural Inspections whether the building permit applies. The pump circuit always needs an electrical permit. 2026 Building Code Enforcement fee schedule; HPWCODE 1141; HHD 1011; City Code Chapter 43
A Health Department plan review (10 business days) and Structural review (15 business days) both run first, with a separate health inspection. Electrical permit $91.06 minimum + $33.56; gas heater $45.53. Plan review is 25% of the estimated permit fee.
Indianapolis, IN $500 to $1,000 ⚠ $799 for an in-ground pool without a heater: $140 ILP + $490 structural + $169 electrical. With a gas or heat-pump heater ($153) it is $952. Flat DBNS schedule of 2026-01-05: ILP $32 + $108; structural $290 to $490 by subtype; electrical $169 up to 1,000 sq ft of house; heating $153. No structural permit if 30 in or less deep and 15 ft or less wide; no ILP at 200 sq ft of water or less or 18 in or less deep. Deeper or wider pools run $599 to $799. Sec. 536-201(b)(14) as amended; Zoning Ord. 740-801.A.3.c and 743-306.JJ; DBNS fee schedule of 2026-01-05
The ILP and the structural permit are separate applications. Electrical and heating permits go to licensed contractors unless an owner-occupant has board approval. No drainage permit unless an acre or more is disturbed.
Irvine, CA $500 to $1,000 About $921 for a 400 sq ft pool: $168.00 plan check plus $640.00 inspection is $808.00, plus $31.88 issuance and $80.80 automation. A 600 sq ft pool is about $1,365. Trade items such as $48.14 for pool piping and the pool's electrical work are extra. Schedule II item 8, effective August 15, 2026, prices pools and spas per square foot: plan check $0.42 with a $95.67 minimum and inspection $1.60 with a $107.63 minimum, plus the $31.88 residential issuance fee and the 10% automation fee on plan check and inspection (our reading of item 21). The page says the schedule does not state whether the square footage is water surface or another measure. A prefabricated pool whose walls are entirely above the adjacent grade and whose capacity does not exceed 5,000 gallons needs no permit for the pool, but pool equipment still needs a 2 foot minimum setback from the property line and any wiring or plumbing needs separate permits. Schedule II item 8 and Schedule V, effective August 15, 2026; Permits Not Required list
Each separate electrical, plumbing or mechanical permit adds its own $31.88 issuance fee. The page says to ask the Permit Processing Counter for an estimate. The state energy and access surcharge is disclosed, not added.
Jacksonville, FL Under $500 $272.50 for a 15,000-gallon in-ground pool: $152.50 building permit at the minimums + $120 electrical. A 40,000-gallon pool is $305. Per 1,000 gallons: $1.50 BID + $0.50 resource + $0.50 Development Services, plus a $25 debris fee; minimums of $45 BID, $15 and $60 plan review. Permit required. The flat above-ground line is $100 ($75 + $25) plus $60 electrical, $160 in all. The pool wall may serve as the barrier at 48 in. Ordinance Code 320.409 fee schedule; Building Inspection Division FAQ; FS 515.27 and 515.29
A gas heater is a separate mechanical permit ($60 minimum). A Notice of Commencement is required above $5,000. Owner-builders sign a notarized disclosure; repairs of an existing pool need a certified or registered pool contractor. The page's totals leave out Florida's 1% and 1.5% surcharges and a 12% landscape fee line that it says single-family accessory structures are exempt from.
Kansas City, MO Under $500 About $442 for a $60,000 in-ground pool: building $309.14 + electrical $70.99 + plumbing $62.33. A $4,000 above-ground pool is about $119. One valuation table applied to each permit: $52 up to $1,000, $58 for the first $2,000, then $4.33 per additional $1,000. The building value leaves out the electrical and plumbing work. No permit for a prefabricated pool at a 1-2 family home with fill under 24 in, walls entirely above grade and 5,000 gallons or less, or a temporary inflatable. Larger ones need building and electrical permits. KC Code Sec. 18-20(b)(2) and 18-16(b)(1)j; Information Bulletins 100, 119 and 152; Zoning 88-305-07
No plan review for residential pools, only a scaled site plan in CompassKC. A business license is the only city contractor license needed. An owner-occupant of a single-family home may pull electrical and plumbing permits personally.
Las Vegas, NV $500 to $1,000 $643 for an in-ground gunite, vinyl-lined or fiberglass pool or spa: $237 plan check + $406 inspection, a flat line not tied to pool size or value, plus a $2 technology fee. A manufactured spa is $298 ($139 + $159) and an excavation-only permit has a $46 plan check fee. The pool heater and fire features associated with the pool are included; a gas line not directly related to the pool, such as for a barbecue, fireplace or fire pit, needs a separate permit. Flat pool line in Table 3-E of the Building User Fees schedule dated July 1, 2021 (plan check + inspection), not a percentage of the pool's value. The pool permit covers the pool only; a fence, patio cover, barbecue or fire pit needs its own permit. Exempt only an on-ground storable pool accessory to a single-family home whose walls are entirely above the adjacent grade, and a portable spa whose heating and circulating equipment is integral and above grade. The page states no depth or gallon cap. Building User Fees schedule Table 3-E #116 (pool) and #122 (manufactured spa); Administrative Code 301.4.1 items 18 and 19; Pool Guideline
The Las Vegas Valley Water District must approve every residential pool permit before the city issues it and caps the combined water surface of pools, spas and water features at 600 sq ft per single-family parcel; a larger pool may be denied under its rules. Excavation before the soils report is in needs the excavation-only permit.
Long Beach, CA Over $2,000 ⚠ About $2,794 for a $60,000 pool: combination permit $1,329 + plan check $753 + zoning plan check $310 + NPDES $120 + $90, with processing, state and records fees. A $100,000 pool and spa is about $4,101. 150% of the valuation building fee ($786 to $50,000, then $10 per $1,000) + 85% plan check + 0.5% zoning plan check ($310 minimum) + NPDES + $115 processing. No permit for a prefab pool under 18 in deep, up to 5,000 gallons and with no plumbing, electrical or mechanical installation. Deeper above-ground pools need the combination permit. LBMC 18.04.020; IB-022, IB-058 and IB-029; fee schedule in force before 2026-10-01
The combination permit covers shell, electrical bonding, gas and plumbing. Long Beach Energy Resources must approve gas pipe sizing for a heater before issuance. Stamped plans, or a recognized standard plan; void if work does not start within 90 days.
Los Angeles, CA $1,000 to $2,000 About $1,472 for a $60,000 pool: combined permit $812.46 + plan check $659.70 per the city fee calculator, which includes a $65 noise inspection and surcharges. A $100,000 pool is about $2,053. Combined permit at 75% of the Table 1-A building fee, plan check at 90% of the permit fee, with surcharges on both. No permit for a pool up to 24 in deep and 250 sq ft. A deeper or larger above-ground pool needs the combined permit, even a prefab up to 5,000 gallons that skips structural design. LAMC 91.106.2; LADBS bulletin P/BC 2026-014; LADBS Permit Fee Calculator (Swimming-Pool/Spa)
The combined permit covers building, electrical, plumbing and gas. Two sets of plans stamped by a California engineer or architect, or a city Standard Plan. A grading permit is added on hillside lots. Cards add 2.7%.
Louisville, KY Under $500 ⚠ $350 for an $80,000 in-ground pool: $250 building ($50 + $2.50 per $1,000) + $100 electrical. The building permit alone is $150 on a $40,000 pool. $50 plus $2.50 per $1,000 of estimated cost, $75 minimum. Electrical is $75 or $100. Kentucky's code excludes pools constructed completely above grade, so the page points to no building permit; new pump wiring needs an electrical permit. LMCO 150.096 fee schedule (revised 2024-02-06); Kentucky Residential Code R101.2 and R326
Electrical work goes to a licensed contractor unless a homeowner files a notarized certification. Pools sit 6 ft from side and rear lines and 10 ft from a street line. Reactivating an expired permit within 180 days is $35.
Miami, FL $500 to $1,000 ⚠ $787.50 (about $790) for a $60,000 in-ground pool with $5,000 of electrical and $6,000 of plumbing: building permit $479.50 + two trade permits at $154 each. A $120,000 pool is about $1,227. 0.50 of the estimated cost of each permit's scope, $110 minimum, + $40 application fee each; state surcharges of 1% and 1.5%; solid waste $0.22 per $100 on the master permit. Permit if the pool holds more than 24 in of water; the City Code exempts no pool from permitting. The pool wall may serve as the barrier if it meets FS 515.29. City Code 10-5 and 10-18 (Ord. 14439); Florida Building Code, Residential; FS 515.27 and 515.29
An in-ground pool is a master building permit with subsidiary electrical and plumbing trade permits. A separate fence permit adds at least $180. Pool equipment other than a heater is exempt from a plumbing permit when a licensed plumbing contractor does it.
Milwaukee, WI Under $500 $222.96 for a new pool with a pump circuit: $86.20 pool permit + $110 electrical line + $1.76 + $25 processing. With a $60.40 fence permit it is $283.36. The page's worked example is an above-ground pool; the same permit covers in-ground. Flat $86.20 for a new pool ($158.40 for an existing one), 1.6% surcharge included. Electrical is a $110 line item under MCO 200-33-11. Permit only if at least 15 x 3 ft or 3,965 gallons; smaller pools need none. DNS Environmental Section pool packet; MCO 200-33-11 and 295-505-3-k
Pool permits come from the DNS Environmental Section, not the Permit Center, and need the electrical permit first, pulled by a licensed electrical contractor. A deck and a new fence are separate permits. Building first can cost up to 4 times the fee.
Minneapolis, MN $1,000 to $2,000 $1,593.33 for a $50,000 in-ground pool: building permit $950.50 + 65% plan review $617.83 + state surcharge $25. A $5,000 above-ground pool is $276.40. The state electrical permit is extra. Chapter 91 valuation schedule ($104.20 for the first $2,000, $20.60 per $1,000 to $25,000, then $578.00 + $14.90 per $1,000) + 65% plan review + 0.0005 x value. Exempt only if prefabricated, entirely above ground and not exceeding both 5,000 gallons and 24 in deep. Anything bigger needs a building permit with plans. MCO 89.110, 89.140 and Chapter 91; Minn. R. 1300.0120 subp. 4
Wiring and bonding go to the state Department of Labor and Industry: a $25 permit + $35 per separate bonding inspection. A barrier fence of any height needs its own building permit. Plans go through ProjectDox.
Nashville, TN Under $500 $465 for an $80,000 in-ground pool: $400 building fee + $40 tech fee + $25 zoning fee. A $6,000 above-ground pool is $58. The examples assume Metro values the job at its cost. Electrical, plumbing and gas heater permits are separate. Residential building permit at $5.00 per $1,000 of value, plus a codes tech fee of 10% of that and a $25 zoning examination fee. One- and two-family permits pay no plan review fee. Permit required for every pool, above or below grade, with no depth or size exemption: $58 for a $6,000 above-ground pool. Replacing a previously permitted pool with one of exactly the same size in the same location needs no new pool permit. Metro residential permit list; Metro pool permitting instructions; fee schedule 16.20.250
Each trade permit has a $75 minimum: electrical for the pump, lighting and bonding, plumbing (the fee schedule counts a pool as a plumbing fixture) and gas/mechanical for a gas heater. A receipt for a pool alarm under T.C.A. 68-14-804 goes in with the application.
New Orleans, LA Under $500 ⚠ $260 for a $40,000 in-ground pool: $60 + $200. A $60,000 pool is $360. Electrical, gas and plumbing permits are separate, and the historic-district surcharge is not included. Valuation: $60 plus $5 per $1,000 of the pool's value, the building permit formula. Starting work without the permit adds a penalty of 200% of all fees. Permit required for any type of swimming pool; the page finds no depth or size cutoff, so a permanent above-ground pool needs one. A $3,000 above-ground pool would be $75. For a temporary inflatable pool the page says to ask the Building Division at (504) 658-7130. City Swimming Pool permit page; Safety and Permits fee schedule and Guide to Building Permits
The electrical permit for the pump, lights and bonding is $40 plus $3 per new circuit plus $0.30 per amp of service. A gas heater is filed under a Gasfitting permit and water lines need a Sewerage and Water Board plumbing permit, each with its own fee. Excavation also needs Flood Protection approval.
New York, NY Under $500 About $273 for a $60,000 in-ground pool that must file: $130 for the first $5,000 + $2.60 per additional $1,000. An exempt pool pays $0 to DOB. The electrical permit and the PE or RA are extra. DOB alteration filing under Table 28-112.2 at a 1-3 family home: $130 minimum for the first $5,000, then $2.60 per $1,000. No DOB permit at a 1-2 family home up to 400 sq ft, with an in-ground pool's edge farther from buildings and lot lines than its depth and a slop sink present. A pump or lights still need an electrical permit. Admin. Code Table 28-112.2 (L.L. 128 of 2024); 1 RCNY 101-14 Table 1 item 3; 1 RCNY 101-03; BC 3109.5
Permits issue only to a Licensed General Contractor, plus a DCWP Home Improvement license for 1-4 family homes. The electrical permit is a $40 application plus per-unit fees. Co-ops, condos and HOAs also need a Health Department permit.
Orlando, FL Under $500 $315 or more for a $40,000 pool, from the page's fee range of $315–$412+: the $263.24 building permit plus the $51.50 Swimming Pool electrical line. A $60,000 pool has a $360.70 building permit. The engineering permit adds a fee the schedule does not show, so treat the total as a minimum. Building permit on construction cost: $66.24 for the first $1,000 plus $4.41 for each additional $1,000 or fraction, with surcharges of 1.5% ($2 minimum), 1% ($2 minimum), 5% concurrency and 3% technology, plus a $50 Swimming Pool electrical line ($51.50 with the 3% technology surcharge) and a staff-created engineering permit with an unpublished fee. No exemption stated. The city's fence rule covers any pool 2 ft or more deep with 36 sq ft or more of area, inflatable pools included, so it needs a permitted fence; Florida law defines a swimming pool as one holding water over 24 inches deep. The page says to ask Permitting Services which other permits an above-ground pool needs. City 2026 residential fee schedule; residential swimming pool and spa checklist; FBC Residential Chapter 45; Land Development Code Sec. 58.959
The schedule does not say whether the $50 line is the whole electrical permit or an add-on to the cost-based electrical fee. Pool barriers and electrical work are excluded from the state exemption for work under $7,500. The city says it is reviewing its fees under HB803.
Philadelphia, PA Under $500 $284 for an in-ground pool with $8,000 of electrical work: building permit $76.50 + electrical $207.50. An above-ground pool with the $63 minimum electrical permit is about $147. Flat $69 swimming pool line for a 1-2 family property ($253 elsewhere) + $3 city and $4.50 state surcharges. Electrical is $25 per $1,000, $63 minimum. No building permit for a prefabricated pool under 24 in deep and under 5,000 gallons. Deeper above-ground pools get an EZ building permit with no plans. L&I fee summary PG_012 (Rev 7.2026); EZ Pools and Spas standard PB_010; building permit page
No zoning permit is needed at a 1-2 family home. A licensed electrical contractor is required, and the owner pays a licensed inspection agency separately. The EZ filing fee is $25, applied to the balance; a decision takes about 5 business days. Plumbing for a permanent fill or drain line is a third permit that the page does not price, so the $284 example leaves it out.
Phoenix, AZ $500 to $1,000 About $541 for an in-ground pool on a standard plan: Table A permit $413 on the $21,000 minimum valuation + $30 aquatics surcharge + $98 plot plan review. A $40,000 custom pool is about $1,236. Table A on valuation ($303 on the first $10,000 + $10 per $1,000), $21,000 residential minimum, $234 minimum permit fee, $30 surcharge; custom pools add 100% plan review. Exempt only if prefabricated, under 18 in deep, up to 5,000 gallons and entirely above ground. A soft-sided pool holding 2 ft of water needs a permit. 2026 Development Fee Schedule Appendix A.2 (eff. 2026-01-20) Table A; 2024 PBCC 105.2; TRT 00913, 00914, 00916
A heater on a standard plan needs a separate gas line permit. A pool edge within 5 ft of a lot line needs a survey waiver. An owner-occupant may build under ARS 32-1121.A.5. Pre-gunite and pre-plaster inspections.
Pittsburgh, PA $500 to $1,000 ⚠ $576 for a $60,000 in-ground pool: building $374.50 + zoning $60 + electrical bonding $141.50. A $4,000 above-ground pool is $333. PLI 2026 residential base fee of $6.00 per $1,000 ($130 minimum) + $4.50 + $5.00 + a technology fee, repeated for the electrical permit; zoning review $1.00 per $1,000, $50 minimum. No application for a prefabricated pool under 24 in deep, up to 5,000 gallons and entirely above grade. Deeper ones need a BDA and an electrical permit, about $333. PLI 2026 fee schedule; PLI residential pool form; Work Not Requiring a Permit page
All pools and spas need an electrical permit for grounding and bonding, and PLI's rules require a city electrical trade license. Custom pools and in-ground pools deeper than 4 ft need architect or engineer drawings. 40% of each base fee is due at application.
Portland, OR $1,000 to $2,000 About $1,776 for a $40,000 in-ground pool with a gas heater: building permit $694.68 + plan review $451.54 + Development Services fee $163.91 + surcharge $83.36, plus the $194.88 electrical permit and the $187.04 mechanical permit. About $1,589 with an electric heat pump; a $60,000 pool is about $2,125. Valuation: $797.28 for the first $50,000 plus $6.81 per $1,000 above, + 65% plan review + a Development Services fee + the 12% state surcharge. Trade permits are per item. A prefabricated pool with walls entirely above grade needs no building permit, only a $194.88 electrical permit for one pump circuit. A kiddie pool or spa 24 in deep or less needs no permit. PP&D 2026 fee schedules; PP&D swimming pool permit page
An in-ground pool needs building, electrical and mechanical permits, and every pool barrier needs its own building permit, even under 7 ft. Trade permits bought on DevHub issue within 24 hours. Homeowner electrical work only in an owner-occupied home.
Raleigh, NC Under $500 ⚠ $332 for a pool with a building permit ($129) and an electrical permit ($129) at the $124 minimum each plus plan review of $74 at the city calculator's 57% rate; $461 with a plumbing permit ($129) for a house water connection. The pool's size and value are not stated. The guide's minimum-fee line would add $55 to each figure. No residential pool line in the guide: a commercial pool's building permit is $534, and a fee not listed is charged at the minimum permit fee of $124 per trade. The page reads that as covering a residential pool; the guide does not say so. Permit for above-ground and on-ground pools too: building and electrical permits. The page sets the line at pools holding more than 24 inches of water and tells readers to confirm a small pool with zoning staff; a wading pool holding 24 inches or less is outside the pool page's rule. City pool and spa page; FY27 Development Fee Guide (July 1, 2026 to June 30, 2027) minimum-fee line; city fee calculator
A residential zoning permit ($271) may also apply; ask at intake. A failed inspection that needs another visit is $127 per trade. Pools may not be built over a septic system or its repair area.
Riverside, CA $500 to $1,000 ⚠ About $587 for a fiberglass pool: $389 + $85 + $41 = $515, plus the 14% surcharge. A 600 sq ft gunite pool with its separate electrical permit is about $894. Flat pool lines: $389 for a fiberglass or vinyl pool, or $583 for the first 800 sq ft of a residential pool or spa plus $30 for each additional 100 sq ft, with a separate $85 pool plan check, a $41 issuance fee per permit and the 14% surcharge. No permit only for a prefabricated pool at a house that is less than 24 inches deep, holds no more than 5,000 gallons and sits entirely above ground. Every other pool or spa needs a building permit. Residential pool and spa and fiberglass/vinyl lines, FY 2026/27 Schedule of Fees and Charges (effective July 1, 2026); exempt-work list; Bulletin 140 (August 4, 2026)
The electrical line is $34 for a pool or a spa and $57 for both, and that permit carries its own $41 issuance fee. The page asks whether the flat line already includes plan check, because under its combined reading the $85 may double-count. Gas piping ($22), heater, plumbing and any Planning fee are extra.
Sacramento, CA Over $2,000 About $2,280 for a $60,000 contractor-built in-ground pool: $1,418.40 in building fees and surcharges + $132 Planning form + $730 Fire Department fees. A $5,000 above-ground pool is about $1,236. Valuation (contract price or ICC value, whichever is higher) on the 2026 residential schedule: permit, plan review, technology, General Plan, green building and strong motion fees; Fire fees of $294 minimum + $260 + $176. Exempt only if prefabricated and less than 18 in deep. A pool over 18 in deep, above-ground included, needs a permit: about $1,236 for a $5,000 owner-built pool. CDD-0257 (rev. March 2026); 2026 residential fee schedule; CDD-0054; City Code 15.64.070
Fire Department plan review ($260), inspection ($294 minimum) and administrative ($176) fees are listed on every pool permit. First-cycle plan review runs 10 working days. Lots outside the city go to the County.
San Antonio, TX $500 to $1,000 $543.09 before surcharges for an in-ground pool with no heater: $414.00 building + electrical $63.54 + plumbing $65.55. With a gas heater $621.29, about $671 after two 4% surcharges. Flat $414.00 Residential Swimming Pool Fee; each trade permit is a $57.50 base plus per-item charges. No permit for a prefabricated pool under 24 in deep, up to 5,000 gallons and entirely above ground. A deeper or larger above-ground pool pays the $414.00 building permit. DSD FY 2027 Development Fee Schedule (rev. Sept 2026); City Code 10-6(e)(1)i
Licensed contractors pull the electrical, plumbing and gas permits; a homeowner can pull the building permit if they will own the home 12 months after. Staff processing adds $11.50 per paper application and cards add 3%. Decision in three business days online.
San Diego, CA Over $2,000 ⚠ About $2,251 for a pool built to a City master plan: $971.73 plan check + $529.71 inspection + $737.00 General Plan Maintenance Fee + $12.16 mapping fee. A custom pool is about $3,928. Flat items on IB 501 Table 501C: master-plan pool $971.73 plan check, custom pool $2,649.60, each + $529.71 inspection. No building permit for a prefabricated pool on grade with walls entirely above grade and up to 5,000 gallons. New wiring or a gas line still needs trade permits. IB 501 Table 501C; IB 712; SDMC 129.0203(a)(11) and (b); IB 100
For a 1-2 family home the pool's electrical, plumbing and gas work is reviewed under the same combination permit. Every pool needs plans stamped by a California engineer or architect. Master-plan pools are limited to 6 ft of retained soil.
San Francisco, CA Over $2,000 ⚠ Between $3,200 and $4,000 in DBI fees for a typical in-ground pool. Plan review plus issuance alone is $2,552 at $60,000, plus a $305 electrical permit and plumbing at $320 or $519 an hour. Table 1A-A (eff. 2026-07-12): plan review $310 + $28.35 per $1,000 over $2,000 and issuance $266 + $8.56 per $1,000 up to $50,000, higher tiers above. Trade permits are flat. No building permit for a prefabricated pool at a 1-2 family home with walls entirely above grade and up to 5,000 gallons. A new pump circuit still needs the $305 electrical permit. DBI fee table 1A-A eff. 2026-07-12; Building Code 106A.2; Electrical Code 89.121(B); Health and Safety Code 115922
Pools are not on DBI's over-the-counter lists, so plan on in-house review; Planning's application fee applies if it reviews the location. State fees are extra. Homeowner trade permits only for a stand-alone single-family house.
San Jose, CA $1,000 to $2,000 ⚠ About $1,220 for a modest pool in Tier 2 with one electrical permit: $211 processing + $367.50 inspection + $325 plan check + $315. A Tier 4 pool with electrical and plumbing is about $2,480. No single pool price: $211 processing, a building permit at $315 per hour of inspection in 40, 70, 130 or 250-minute tiers, plan check at $325 per hour, each trade the greater of $315 or an itemized amount. No building permit for a prefabricated pool under 24 in deep, up to 5,000 gallons and entirely above ground. A hard-wired pump still needs an electrical permit. Schedule of Fees and Charges eff. 2026-07-01; SJMC 24.02.120 and Chapter 17.28; Health and Safety Code 115922
Any pool 18 in or deeper must be enclosed under Chapter 17.28, exempt or not. Digging before the permit costs two times the plan review and inspection fees. An owner-builder may file and hire licensed trades.
Seattle, WA $1,000 to $2,000 About $1,560 for an in-ground pool: SDCI permit $1,232.90 (4 x $292 + 5% + $6.50) + electrical about $138 + King County plumbing about $191. Flat Fee Subtitle Table D-2 line: 4 times the $292 base fee, $1,168, plus a 5% technology fee and a $6.50 state surcharge, whatever the pool costs. No building permit for a prefabricated pool or spa with walls entirely above grade and 5,000 gallons or less. A new circuit or hard-wired pump still needs an SDCI electrical permit. 2026 Fee Subtitle Table D-2 item 17a; SRC R105.2 item 9 and R327.1; Public Health Seattle and King County 2026 fees
Plumbing and gas permits come from Public Health Seattle and King County ($137 + $27 per fixture or outlet), not SDCI. A pool built from a standard plan pays 1.5 times the base fee. Reinspections cost half the base fee. Owner-occupants may take the electrical permit.
St. Louis, MO $500 to $1,000 ⚠ $510 for a $40,000 in-ground pool: building permit $425 ($25 application + $30 for the first $3,000 + $370 at $10 per $1,000 above that) + electrical $85. An $80,000 pool is $910. $25 application fee plus $30 for the first $3,000 of estimated cost and $10 per $1,000 or fraction above that; electrical is a $25 application + $60. No building permit for an above-ground pool, hot tub or spa set on a slab, or an in-ground pool under 24 in deep and 250 sq ft. The pump circuit needs an $85 electrical permit. Ord. 70795 Sec. 105.2 item 29; Building Code 3109 (Ord. 70794); Building Division fee table; pool handout
Plumbing is a separate permit if a water line or backflow device is added ($30 + $25 per tap + $10 per fixture). In-ground construction documents must be sealed by a Missouri design professional. Only the $25 application fee is due at filing.
St. Paul, MN $1,000 to $2,000 $1,366.40 for a $40,000 in-ground pool: $816 permit + $530.40 plan review + $20.00 state surcharge. A $3,000 above-ground pool over 5,000 gallons is $211.05. The pool fence review ($45 for the first 200 lineal feet) and the electrical permit ($85 per pool plus the circuit charge) are extra. Valuation (Table A, Legislative Code Section 33.04) + 65% plan review + 0.0005 x value state surcharge. Grading under the code starts at $39 for the first 100 cubic yards (DSI's older grading table shows $36). Exempt only if prefabricated, 24 in deep or less, no more than 5,000 gallons and entirely above ground. Any pool holding more than 5,000 gallons needs a building permit. Legislative Code Section 33.04, Table A; DSI pools and hot tubs handout (2017)
An in-ground pool also needs a grading permit, filed on the general building permit application. Ten percent of the estimated plan review fee, at least $85 and at most $5,000, is due before review begins; the ordinance does not say how it is credited.
Stockton, CA $500 to $1,000 $761 for a $40,000 pool: $575 + 0.0062 × $29,999, the pool line fee only. An $80,000 pool is $1,009 ($575 + 0.0062 × $69,999). The pool lines list no separate plan check fee, and percentage add-ons are not included. Valuation: private pool or spa lines in the FY 2026-27 Adopted Fee Schedule effective July 1, 2026: $261 for a pool valued at $1 to $1,000, $366 plus 0.0124 times the valuation above $1,001 from $1,001 to $10,000, and $575 plus 0.0062 times the valuation over $10,001. The schedule lists add-ons it does not say apply to a given permit: a building technology fee of 7.5% of the permit fee, a Community Rating System admin fee of 6% of the permit fee, a General Plan fee of 0.15% of valuation, a capital preservation fee of 0.1% of valuation and two state pass-throughs; the example leaves them out. No building permit for a prefabricated pool less than 24 inches deep; an in-ground pool, permanent spa or above-ground pool 24 inches deep or more needs one. The page states no gallon cap. FY 2026-27 Adopted Fee Schedule effective July 1, 2026 (private pool or spa lines); residential exemption handout (BLDG-0018, building item 7); Swimming Pool / Spa Permit Checklist (BLDG-0082)
The page names no electrical permit for a pool and says to ask the Permit Center whether spa wiring or a gas line needs its own; it says to ask for an estimate through the city's Virtual Assistant or the Permit Center because the pool lines list no plan check fee. Pool and spa permits can be over the counter for qualified projects.
Tampa, FL $500 to $1,000 ⚠ $733.90 for an in-ground pool or spa: the $716 flat fee plus the 2.5% state surcharge, the total the city's fee estimator returns. With a screen cage the city fees come to $1,057.80 ($733.90 + $323.90). The page gives no pool size or value because the fee is flat. Flat Miscellaneous Projects fee by pool type: in-ground $716, above-ground $292, screen enclosure $316, each plus the 2.5% Florida Building Permit Surcharge. Permit if the pool holds more than 24 inches of water, above-ground pools included: Pool Permit, $299.30 ($292 + 2.5%), with a barrier or other safety feature required. The page states no exemption for a small pool. City Code 5-105.2; Florida Statutes 515.25 and 515.29; Miscellaneous Projects fee schedule
A signed and sealed topographical survey is required with 1,000 sq ft or more of decking. The fee schedule was posted before pools had their own application type, so check the estimator if your invoice differs.
Tucson, AZ $500 to $1,000 About $849 for a typical pool with one hour of review: $730.28 + $100 + $18.54 digital filing fee. With a heater and two hours of review it is about $1,099. Flat $730.28 private pool fee + plan review at $100 an hour (one-hour minimum) + a 1% digital filing fee ($18.54 minimum). Trade items are $150 first, $50 each additional. A permit is needed for any above-ground pool holding more than 5,000 gallons or deeper than 18 in; a small shallow one needs none. Tucson lowered the model code's 24 in to 18 in. PDSD FY27 fee schedule (eff. 2026-07-01); 2024 building code as amended; A.R.S. 36-1681
Every new or remodeled outdoor pool must have a cover that limits evaporation before final. Pools are in the 15-day Fast Lane. A spa alone is $337.05 plus review. Owner-builders file an affidavit; rentals need a licensed contractor.
Tulsa, OK Under $500 $448 for a $30,000 fiberglass in-ground pool: the $213 building permit plus the flat $235 electrical permit. A $45,000 gunite pool is $505 ($270 building plus $235 electrical). Zoning, watershed fees and surcharges are not in the totals. Building permit by job value: $133 up to $5,000, $213 from $5,000.01 to $40,000 and $6 per $1,000 from $40,000 to $150,000, with the $64 application fee credited, plus a flat $235 electrical permit for a swimming pool. The page reads Section 302.B as $6 per $1,000 of the whole valuation and says to confirm the total with the Permit Center. No permit only for a prefabricated pool less than 2 ft deep. Any other above-ground pool is filed as Pool: Above Ground: $133 for a $3,000 pool, plus $235 if new wiring is run. Title 49 Section 302.B (building permit fee) and Section 404.B (swimming pool electrical); Tulsa residential building guidelines
The pool's electrical permit is issued only to a licensed electrical contractor registered with Development Services. Title 49 also lists a $75.50 zoning clearance fee and watershed fees of $64 and $207; ask which apply. An unsigned May 2026 amendment would make the $45,000 pool $278.10 plus $235.
Virginia Beach, VA Under $500 About $386 for a $45,000 in-ground pool with a new barrier fence: $50 + (45 x $5) = $275.00, plus $5.50 levy, $10.00 technology fee, $35.00 right-of-way fee and the $60.60 fence permit. Plan review is left out because the city does not say whether it applies to a pool. $50 plus $5 per $1,000 of construction value; the city's table runs from $55 for a $1,000 job to $110 at $12,000 and continues at the same rate. Adds a 2% state levy and a $10 technology fee; in-ground pools also pay a $35 right-of-way fee. A pool that can hold at least 24 in of water is permitted, above-ground included: about $76 for a $3,000 above-ground pool. Only a pool with a surface area of 150 sq ft or less that is under 24 in deep is exempt. City residential building permit list and pool fee list; Pool Barrier Affidavit (ISPSC Section 305); Virginia USBC 108.2 item 8
The pool fee list shows no plan review fee, but the residential fee sheet lists a $100 plan review fee and a $25 counter plan review fee; the city does not say whether either applies to a pool, so ask the permit technician. The pool may not be filled until the pool and barrier pass their final inspections.
Washington, DC Under $500 $286 for a pool up to 15,000 gallons: DOB's $260 pool fee plus the 10% technology fee. The pump and lighting need an electrical permit and the water connection may need a plumbing permit, so the trade permits are extra. By pool volume: $260 plus 10% up to 15,000 gallons; above that $260 plus $33 per 1,000 gallons, plus 10%. The schedule does not say whether the $33 counts every 1,000 gallons or only those above 15,000, so take the Permit Wizard estimate for a large pool. Exempt only if prefabricated, less than 24 in deep, 1,000 gallons or less, entirely above ground and not designed to connect to a circulation system. An above-ground pool with a filter pump needs the permit ($286). DOB fee schedule (swimming pool permit by volume, plus 10%); 2017 DC Building Code 105.2 item 9; 105.2.5 for historic properties
Half is due as the filing fee and the balance before the permit issues. Electrical permits are priced item by item from the same schedule with a $22 minimum including the 10% fee. On a historic-district or landmark property even the exempt prefabricated pool needs a permit with Historic Preservation Office review.
Wichita, KS Under $500 $488 for a $40,000 in-ground pool if MABCD prices it on the valuation schedule; a $60,000 pool is $668. MABCD publishes no pool fee basis, so the page says to ask which applies. A pool circuit adds $14 plus the $25 electrical permit issuance fee. Unpublished: MABCD's fee tables do not name pools. Table B's accessory-structure rate (20 to 25 cents per sq ft) and Table G's valuation basis are both possible. On valuation: $488 for the first $40,000 plus $9 for each additional $1,000 up to $100,000, and $70 plus $11 per $1,000 below $40,000. Exempt only if the pool is prefabricated, less than 24 in deep, holds no more than 5,000 gallons and has its walls entirely above ground; all three conditions must be met. An above-ground pool 24 in deep or more needs a permit, and a $20,000 one is $268 if priced on valuation. MABCD fee Tables B, G and I (electrical); Unified Building and Trade Code exempt-work list for prefabricated pools
The $14 pool circuit and $25 issuance fee apply when the electrician pulls a separate permit; Table I also says electrical work under a one- or two-family building permit is covered, so the page says to ask whether a pool counts. MABCD licenses swimming pool contractors as their own class.

The status is the band of the city's own worked example for an in-ground pool: every city fee the page includes in that example (the building permit, plan review, the trade permits it bundles and surcharges), using the lowest worked total on the page where it gives more than one in-ground example. The cell says the pool value or size the example assumes and what it leaves out; a pool value of $30,000 and one of $120,000 are not the same job, so compare the cell, not only the band. The fee-basis column sorts a flat pool line first, then a valuation table, then a rate per square foot or gallon, then per-trade or hourly pieces, then not stated. The above-ground column sorts cities that state an exemption for a small or prefabricated pool first (the cell gives the depth, gallon or area cap), then cities that permit every pool they define, then a page that gives no clear rule. A flag marks a row where the city has no published pool fee line, its documents disagree, or its example leaves out a charge the page names. Download the table as CSV.

What the comparison shows

The city's own in-ground example is under $500 in 18 cities and over $2,000 in 4

Under $500: Milwaukee $223, Baltimore $228, New Orleans $260, Jacksonville $273, New York $273, Philadelphia $284, Washington $286, Orlando $315, Raleigh $332, Louisville $350, Virginia Beach $386, Corpus Christi $420, El Paso $426, Kansas City $442, Tulsa $448, Nashville $465, Wichita $488 and Denver $495. $500 to $1,000: Houston $500, St. Louis $510, Fort Worth $540, Phoenix $541, San Antonio $543, Chicago $550, Pittsburgh $576, Fresno $577, Riverside $587, Las Vegas $643, Austin $648, Albuquerque $662, Boston $725, Tampa $734, Stockton $761, Miami $788, Indianapolis $799, Colorado Springs $814, Tucson $849, Irvine $921 and Honolulu $962. $1,000 to $2,000: Cincinnati $1,002, Charlotte $1,040, San Jose $1,220, St. Paul $1,366, Dallas $1,395, Los Angeles $1,472, Seattle $1,560, Minneapolis $1,593, Portland $1,776 and Aurora $1,890. Over $2,000: San Diego $2,251, Sacramento $2,280, Long Beach $2,794 and San Francisco $3,200. The median is $587. The examples are not the same pool: Cincinnati's and Tulsa's are $30,000 pools, Albuquerque's, Portland's, St. Louis's, New Orleans's, Denver's, Wichita's, Honolulu's, Aurora's, Fresno's, Stockton's and St. Paul's $40,000, Minneapolis's $50,000, most other valuation-priced examples $60,000, Louisville's and Nashville's $80,000, Dallas's and Irvine's a 400 sq ft pool, Corpus Christi's a 450 sq ft pool, Riverside's a fiberglass pool and Jacksonville's a 15,000-gallon one. Virginia Beach prices a $45,000 pool with a new barrier fence, Orlando a $40,000 pool, Washington a pool up to 15,000 gallons, El Paso a pool whose size and value the page does not state, and Las Vegas a flat line not tied to the pool's size or value. Houston's $500 is the page's own estimate, because the 2026 schedule has no pool line, and Austin's $648 is the page's reading of which schedule rows apply, since the schedule itemizes no pool fee. Tampa's, Raleigh's and Austin's pages state no pool size or value. What the example includes also varies: Raleigh includes building, electrical and plan review ($461 with a plumbing permit), Nashville, New Orleans and Denver leave out the trade permits, Louisville, Philadelphia and St. Louis include building and electrical permits only, Austin includes the building and electrical base fees, Boston adds a $50 Use of Premises permit to its building and electrical permits, El Paso includes building, electrical and plumbing permits (with a technology fee Schedule C does not state), Orlando adds its $50 Swimming Pool electrical line but not the engineering permit, whose fee the schedule does not show, Virginia Beach includes the $60.60 barrier fence permit, Washington leaves out the trade permits, Colorado Springs includes the city's $130 zoning fee and $25 IT fee, Kansas City adds plumbing, Minneapolis leaves out the state electrical permit, Tulsa includes the flat $235 electrical permit, Aurora adds a plan review line equal to the permit fee, Fresno and Wichita leave out a separately billed electrical permit, Stockton's pool line lists no plan check, St. Paul's leaves out the fence review and the electrical permit, Irvine's leaves out the trade items, Corpus Christi's includes the electrical permit, Riverside's adds an $85 pool plan check, and San Francisco's $3,200 to $4,000 is the page's range for a typical in-ground pool with trades. All four cities over $2,000 are in California: Long Beach, Sacramento and San Francisco stack valuation fees, plan check and add-ons, and San Diego charges flat plan check and inspection plus a $737.00 General Plan Maintenance Fee.

15 cities charge a flat pool fee, 29 price it on the pool's value

A flat pool line is used in Chicago, Seattle, San Antonio, San Diego, Philadelphia, Indianapolis, Baltimore, Milwaukee, Tucson, Tampa, Austin, El Paso, Las Vegas, Fresno and Riverside. Examples: Riverside $389 for a fiberglass or vinyl pool and $583 for the first 800 sq ft of a residential pool, Fresno $488.57 base ($102.72 plan check plus $385.85 inspection), El Paso $160 for the building permit ($426 with electrical and plumbing permits), Las Vegas $643 ($237 plan check plus $406 inspection), Austin $648.32 ($146.15 Small Projects Plan Review plus $318.48 building and $183.69 electrical base fees, by the page's reading), Tampa $733.90 ($716 plus the 2.5% surcharge), Baltimore $50 plus a $125 plan-review application fee, Philadelphia $69, Seattle 4 times the $292 base fee ($1,168 before surcharges), San Antonio $414.00, Tucson $730.28 plus $100 an hour of review, Chicago $400, Milwaukee $86.20 and San Diego $971.73 or $2,649.60 of plan check plus $529.71 of inspection. A valuation table sets the fee in New York, Los Angeles, Phoenix, Miami, Portland, Charlotte, San Francisco, Minneapolis, Sacramento, Louisville, Kansas City, St. Louis, Pittsburgh, Cincinnati, Albuquerque, Long Beach, Stockton ($575 plus 0.0062 times the valuation over $10,001, $761 on $40,000), St. Paul (Table A plus 65% plan review, $1,366 on $40,000), Virginia Beach ($50 plus $5 per $1,000), Orlando ($66.24 for the first $1,000 plus $4.41 per additional $1,000, about $263 on $40,000), Nashville ($5.00 per $1,000, $465 on $80,000), New Orleans ($60 plus $5 per $1,000, $260 on $40,000), Denver ($340 on $40,000), Boston ($50 plus $10 per $1,000 on the long form, plus a flat $50 Use of Premises permit), Colorado Springs (Table A with a 28% plan check, priced as Other Accessory Structure), Wichita ($488 on $40,000 if the valuation schedule applies, since MABCD publishes no pool fee basis), Honolulu ($82 plus $18 per $1,000 from $20,000 to $50,000, plus 20% plan review), Aurora (the city's calculator, a $945 permit fee plus an equal plan review line on $40,000) and Tulsa ($213 building permit for a $30,000 pool plus a flat $235 electrical permit). Albuquerque halves its Table 112-A fee (a 0.50 modifier) and adds 65% plan review; Long Beach charges 150% of the building fee for a combination permit; Los Angeles charges 75% of its Table 1-A fee. Dallas has no pool line and applies its single-family new-work table at $1.07 per square foot, Jacksonville charges per 1,000 gallons ($1.50 for the BID fee) and Washington charges $260 plus 10% up to 15,000 gallons and $33 per 1,000 gallons above that, though its schedule does not say whether the $33 counts every 1,000 gallons. Corpus Christi prices a pool by its surface area ($0.146 plan review plus $0.461 per sq ft with a $146.41 minimum) and Irvine at $0.42 plan check plus $1.60 inspection per sq ft with minimums. Fort Worth prices by trade ($119 for one, $357 for three), Raleigh at its $124 minimum per trade and San Jose bills hours: $211 processing, $315 an hour of inspection time and $325 an hour of plan check. Houston gives a flat Health Department review ($94.00 + $33.56) and no pool line for the building permit.

An above-ground pool is exempt from the building permit in 43 cities, but the cap varies

43 pages state an exemption for a small or prefabricated pool: New York, Los Angeles, Chicago, Phoenix, Seattle, Portland, Dallas, San Antonio, San Diego, Philadelphia, San Jose, Indianapolis, San Francisco, Minneapolis, Sacramento, Baltimore, Fort Worth, Milwaukee, Louisville, Tucson, Kansas City, St. Louis, Pittsburgh, Cincinnati, Albuquerque, Long Beach, Denver (a prefabricated pool under 24 inches deep and 5,000 gallons), Austin, Boston, Colorado Springs, Virginia Beach (150 sq ft or less and under 24 inches deep), El Paso (under 24 inches deep and under 5,000 gallons), Las Vegas (only an on-ground storable pool with walls entirely above grade), Wichita and Fresno (prefabricated, under 24 inches deep, 5,000 gallons or less and entirely above ground), Aurora (under 24 inches deep), Tulsa (a prefabricated pool under 2 ft deep), Washington (prefabricated, under 24 inches deep, 1,000 gallons or less and not connected to a circulation system), Stockton (a prefabricated pool under 24 inches deep), Riverside, St. Paul and Corpus Christi (prefabricated, under 24 inches deep, 5,000 gallons or less and, in Riverside and St. Paul, entirely above ground) and Irvine (walls entirely above grade and 5,000 gallons or less). Miami, Jacksonville, Charlotte, Tampa, Raleigh, Nashville and New Orleans permit every pool they define (Charlotte, Miami, Tampa and Raleigh from 24 inches of water, Nashville and New Orleans with no depth or size cutoff, Jacksonville with a flat $100 building permit and $60 electrical for an above-ground pool), and Houston's page gives no clear rule (as do Honolulu's, which says to ask DPP before installing a portable pool with wiring or plumbing, and Orlando's, which states no exemption and says to ask Permitting Services): the Health Department review does not apply to above-ground pools, and the page says to ask Structural Inspections. A 5,000-gallon cap appears on 25 pages. Depth caps run from under 54 inches (Albuquerque) and 48 inches (Chicago) through 30 inches (Indianapolis, for the structural permit) to under 24 inches in twenty-five cities (Austin, Aurora, Baltimore, Boston, Cincinnati, Colorado Springs, Dallas, Denver, El Paso, Kansas City, Los Angeles, Minneapolis, Philadelphia, Pittsburgh, San Antonio, San Jose, Virginia Beach, Washington, Wichita, Fresno, Stockton, Riverside, St. Paul, Corpus Christi and Tulsa, where it is 2 ft) and 18 inches in four (Long Beach, Phoenix, Sacramento and Tucson). Fort Worth, Portland, San Diego, San Francisco, Seattle, Louisville, Las Vegas and Irvine key the exemption to a pool whose walls are entirely above grade rather than to a depth. St. Louis exempts any above-ground pool set on a slab, Milwaukee any pool smaller than 15 by 3 feet, and New York a pool up to 400 sq ft at a one- or two-family home. An exempt pool usually still needs an electrical permit for a hard-wired pump: $194.88 in Portland, $305 in San Francisco, $85 in St. Louis and a $47 administrative charge plus $60 in Albuquerque. A permitted above-ground pool costs $58 in Nashville ($6,000 pool), $75 in New Orleans ($3,000 pool), about $76 in Virginia Beach ($3,000 pool), $119 in Kansas City ($4,000 pool), $133 in Tulsa ($3,000 pool), $147 in Philadelphia, $160 in Jacksonville, $211 in St. Paul ($3,000 pool over 5,000 gallons), $223 in Milwaukee, $268 in Wichita ($20,000 pool, if priced on valuation), $276 in Minneapolis ($5,000 pool), $286 in Washington (with a filter pump), $289 in Colorado Springs ($5,000 pool), $299.30 in Tampa, $333 in Pittsburgh, $338 in Charlotte, about $376 in Cincinnati ($3,000 pool) and $1,236 in Sacramento ($5,000 pool, mostly Fire and Planning fees).

Other permits and agencies: 46 pages add an electrical permit and 6 add a second agency

The pump, lights and bonding need an electrical permit, required or bundled, on 46 pages; Long Beach, Los Angeles and San Diego fold it into one combination permit. Seven pages name no electrical permit for the pool: Phoenix, Sacramento and Tucson name only a gas line permit, an electrical load calculation or trade items for heaters and lighting, Tampa lists electrical bonding only as an inspection stage, Las Vegas says only that the electrical work needs a licensed subcontractor, Aurora's page names no electrical permit for a pool, and Stockton's says only to ask the Permit Center whether spa wiring or a gas line needs its own. Plumbing for a fill line or drain is a separate permit in several cities (Albuquerque $107, Cincinnati $97, El Paso $110, Miami $154, San Antonio $65.55, Nashville $75, Raleigh $129, Austin $220.47 for an autofill or heater, Fort Worth, Philadelphia and St. Louis), and a gas heater adds a permit in Houston ($45.53), Jacksonville ($60 minimum), Nashville ($75 minimum), Boston ($20 + $50 + $0.09 per 1,000 BTU), San Antonio, Phoenix, Portland ($187.04) and New Orleans (a Gasfitting permit). Six cities send an in-ground pool to a second agency that charges its own fee: Charlotte (Mecklenburg County Public Health $75, then the City's $115 zoning review), Houston (a Health Department plan review at $127.56), Sacramento (Fire Department fees of $730), Seattle (Public Health Seattle and King County for plumbing, about $191), Minneapolis (the state Department of Labor and Industry for wiring and bonding, $25 plus $35 per inspection) and Cincinnati (Inspection Bureau, Inc. for electrical, $130). Fort Worth requires an Oncor Electric stamp on the plans, and Long Beach requires Energy Resources to approve gas pipe sizing for a heater. A separate zoning or site filing is priced in Indianapolis ($140 ILP), Pittsburgh ($1 per $1,000, $50 minimum), Charlotte ($115), Sacramento ($132), Nashville (a $25 zoning examination fee), Raleigh (a $271 residential zoning permit that may apply), Denver (about $55 in its $40,000 example), Colorado Springs (the city's $130 zoning fee plus a $25 IT fee) and Tulsa (a $75.50 zoning clearance, with $64 and $207 watershed fees). Plans sealed by an engineer or architect are required in Chicago (pools over 48 inches), Los Angeles, Long Beach, New York, San Diego, St. Louis, Pittsburgh (in-ground over 4 feet or custom) and Colorado Springs (in-ground). The barrier itself is a separate permit in Dallas, Portland, Minneapolis, Miami (at least $180), Milwaukee ($60.40), Chicago (over 5 feet), Virginia Beach ($60.60), Las Vegas, St. Paul ($45 fence plan review) and Tulsa (a fence permit). For fence heights, see How Tall Does a Pool Fence Have to Be? 53 Cities Compared.

Where the money goes: plan review, surcharges and the add-ons that outweigh the permit

Plan review is a share of the permit fee in several cities: 65% in Albuquerque, Minneapolis, Portland and St. Paul, 57% in Raleigh, 28% in Colorado Springs, 20% for express review or 50% for standard review in Denver, 85% in Long Beach (plus a zoning plan check of 0.5% of value with a $310 minimum and NPDES stormwater fees), 90% in Los Angeles, 25% in Houston, 20% in Honolulu and 100% for a custom pool in Phoenix, where a standard plan pays a $98 plot plan review. Others charge it by the hour (Tucson $100, San Jose $325) or as a minimum (Dallas $577, a larger line than the $428 permit itself in its 400 sq ft example). San Francisco's $60,000 pool pays $1,773 of plan review and $725.30 of issuance. Surcharges add to the base: Portland's 12% state surcharge ($103.85 on a $60,000 pool), about $11 per $100 in Cincinnati, Miami's 1% and 1.5% plus $0.22 per $100 of solid-waste charge on the master permit ($132 on $60,000), two 4% surcharges in San Antonio, a 2% levy, $10 technology fee and $35 right-of-way fee in Virginia Beach, four surcharges in Orlando, a 10% technology fee in Washington, a $2 technology fee in Las Vegas, a $62.68 General Plan surcharge plus a $23.79 technology surcharge in Fresno, 5% plus $6.50 in Seattle 1.6% in Milwaukee, 2.5% in Tampa, 10% in Nashville, 4% in Raleigh, 14% in Riverside, 4.5% on starred fees in Corpus Christi and a 10% automation fee plus a $31.88 issuance fee in Irvine. The biggest fixed add-ons are San Diego's $737.00 General Plan Maintenance Fee (about a third of its $2,251 example), Sacramento's $730 of Fire Department fees, Dallas's $577 plan review minimum, Charlotte's $75 Health and $115 zoning fees and Houston's $127.56 Health review. Chicago collects a $600 non-refundable deposit at submission, more than its $400 pool line.

Who may pull it: the owner in 25 of the 40 cities that record it, a licensed contractor only in 3

Of the 40 cities whose pages state who may pull the permit, twenty-five say an owner or owner-builder may file the building permit, often with conditions (the other 13, Austin, Boston, Colorado Springs, Denver, El Paso, Las Vegas, Nashville, New Orleans, Orlando, Raleigh, Tampa, Virginia Beach and Washington, are not counted here): Los Angeles, Chicago, Phoenix, Miami, San Antonio, San Diego, Philadelphia, San Jose, Jacksonville, San Francisco, Sacramento, Fort Worth, Tucson, Pittsburgh, Cincinnati, Albuquerque, Long Beach, Wichita, Honolulu, Aurora, Fresno, Tulsa, Riverside, St. Paul and Irvine. The conditions include owning the home for 12 months after completion in San Antonio, one homeowner permit per 12 months in Albuquerque, an owner acting as contractor on a primary residence once a calendar year in Chicago, a notarized disclosure in Jacksonville and an affidavit in Tucson and a principal residence occupied for 12 months in Fresno, a homesteading owner of a one- or two-family home in St. Paul, the Property Owner Package in Riverside and, in Irvine, an owner-builder exception the page calls very limited. Three pages say no: New York, Dallas and Baltimore. Dallas states that a homeowner permit does not allow you to build a swimming pool, even on your homestead; New York issues pool permits only to a Licensed General Contractor; Baltimore says construction on one- and two-family homes requires an MHIC-licensed contractor. The other twelve pages do not say who may pull the building permit: Houston, Seattle, Portland, Charlotte, Indianapolis, Minneapolis, Milwaukee, Louisville, Kansas City, St. Louis, Stockton and Corpus Christi. Trade permits are narrower than the building permit. Electrical goes only to licensed electricians in Baltimore, Dallas, Honolulu, Milwaukee, New York, Philadelphia, Pittsburgh (a city trade license) and Tulsa, to an owner after a test or board approval in Albuquerque, Indianapolis, St. Louis and Wichita, and to an owner-occupant in Charlotte, Kansas City, Portland, Seattle, Minneapolis and St. Paul. Plumbing goes to a master plumber in Baltimore, Dallas and New York and to a licensed plumbing contractor in Honolulu.

Where the city's documents disagree or leave a gap

Tampa: the Miscellaneous Projects schedule was posted before pools had their own Pool Permit application, so the invoice may differ from $733.90. Raleigh: the guide has no residential pool line and the page only reads its $124 per-trade minimum as covering one. New Orleans: the historic-district surcharge is read three ways and the page says to confirm the total when you apply. Albuquerque: zoning and hydrology fees are collected with plan review but not priced, so its examples leave them out. Charlotte: the Health ordinance excludes storable pools while the County brochure includes seasonal pools and spas. Chicago: a $600 deposit exceeds the $400 pool row, and the Title 17 zoning fee is not published. Cincinnati: a plan review fee is paid at application but only the $49 processing fee is priced. Dallas: Chapter 52 has no pool fee line, so the page estimates from the single-family table. Fort Worth: the page counts three trades but says the Accela invoice shows the number the city actually counts. Houston: the 2026 schedule has no pool line, so the $91.06 structural minimum is a floor and the $500 total is an estimate. Indianapolis: the structural permit has no pool line, and DBNS assigns a $290 or $490 subtype at intake. Jacksonville: the totals leave out Florida's 1% and 1.5% surcharges and a 12% landscape fee line. Long Beach: the fees are those in force before 2026-10-01, with a new schedule approved on 2026-09-08. Louisville: the in-ground pool guide was unreachable, so the page says to confirm the in-ground and above-ground readings. Miami: the residential rate is printed as 0.50 with no percent sign, read as 0.5%, and a county surcharge is unstated. Philadelphia: the fill or drain line plumbing permit is not priced. Pittsburgh: attached 1-2 family dwellings may fall in the commercial category with a $605 minimum. San Diego: a 2.5-hour impact-fee assessment charge may apply. San Francisco: no plumbing category names pool piping, so the typical total is a range. San Jose: no single pool price exists, and the Building Official sets the inspection tier. St. Louis: the 2001 handout and the Health page disagree on whether a residential pool needs a Health permit. Wichita: MABCD's fee tables do not name pools, so its $488 applies the valuation schedule and the page says to ask which basis applies. Aurora: the calculator labels the plan review line as applying if applicable, and the page includes it as its reading of the chart that marks pools as needing a plan submittal. Tulsa: the page reads Section 302.B as $6 per $1,000 of the whole valuation and says to confirm the total with the Permit Center. Riverside: the schedule marks only some lines with a caret for the 14% surcharge while the city's fee sheet applies it to all plan check and permit fees. St. Paul: the code's grading table starts at $39 where DSI's older table shows $36. Corpus Christi: the schedule has no pool line, so the page prices the pool's surface area and reads the $146.41 minimum line as the electrical floor. The table flags these rows rather than resolving them.

Method

The 53 cities are the ones whose BuildPermitGuide pages have been rewritten from primary sources as of October 2026: the city's adopted code and exemption list, its permit page or bulletin, its current fee schedule or ordinance and its contractor and owner-builder rules, each fetched and quoted on the city's pool permit page. The status in the table is the band of the city page's own worked example for an in-ground pool, using every city fee the page includes and the lowest worked in-ground total where it gives several; the pool value in the example differs by city and the cell says what it is. The pricing, above-ground and schedule columns are the page's fee section and scenario table, and the who-pulls-it counts come from its licensing paragraph. Contractors' own prices, engineering fees and the owner's cost of an outside inspection agency are never included. Nothing in this table is taken from a model code or another city's schedule; where a city publishes no pool fee line, its documents disagree or an example leaves out a charge the page names, the row carries a flag instead of a resolution. Each city page carries the date its sources were last verified, and the change log records when a cited document changes. A yes-or-no field in the data file, elec_sort, records whether the page requires an electrical permit for the pool wiring (separate, trade, state-issued or folded into a combination permit); it is read from the city page text and drives the electrical-permit counts.

Use this data. The table and CSV are published under CC BY 4.0. Cite it as:
BuildPermitGuide, “How Much Does a Pool Permit Cost? 53 Cities Compared” (2026), https://buildpermitguide.com/research/pool-permit-fees/
Questions, corrections or a city you want added: contact us.

Frequently asked questions

Across the 53 largest cities we compared, the city's own worked example for an in-ground pool runs from $223 in Milwaukee to $3,200 in San Francisco, and the median is $587. Eighteen are under $500 (Milwaukee, Baltimore, Jacksonville, New York, Philadelphia, Louisville, Kansas City, Nashville, Raleigh, New Orleans, Denver, Washington, Orlando, Virginia Beach, El Paso, Corpus Christi, Tulsa and Wichita), twenty-one are $500 to $1,000, ten are $1,000 to $2,000 and four are over $2,000 (San Diego, Sacramento, Long Beach and San Francisco). Contractors' prices and engineering are not included.
In 43 of the 53 cities a small or prefabricated above-ground pool is exempt from the building permit: most often under 24 inches deep and 5,000 gallons (twenty-five cities use 24 inches, 25 pages state a 5,000-gallon cap), under 18 inches in Long Beach, Phoenix, Sacramento and Tucson, and any pool set entirely above grade in Fort Worth, Portland, San Diego, San Francisco, Seattle, Louisville, Las Vegas and Irvine. Charlotte, Jacksonville, Miami, Tampa, Raleigh, Nashville and New Orleans permit every above-ground pool they define, and the pages for Houston, Honolulu and Orlando give no clear rule.
On 46 of the 53 pages, yes: the pump, lights and bonding need an electrical permit, from $85 in St. Louis and $130 at Cincinnati's IBI to $305 in San Francisco. Long Beach, Los Angeles and San Diego fold it into one combination permit. Even an exempt above-ground pool needs one for a hard-wired pump in Albuquerque, Chicago, Portland ($194.88), San Francisco, San Jose, Seattle and St. Louis ($85).
All four cities over $2,000 are in California. Long Beach charges 150% of its valuation fee plus 85% plan check, a zoning plan check and NPDES review (about $2,794 on a $60,000 pool); San Francisco charges plan review and issuance on valuation plus flat trade permits ($3,200 to $4,000); San Diego adds a $737.00 General Plan Maintenance Fee to flat plan check and inspection ($2,251); Sacramento adds $730 of Fire Department fees and a $132 Planning form to a valuation fee ($2,280). Los Angeles ($1,472), San Jose ($1,220), Irvine ($921), Stockton ($761), Riverside ($587) and Fresno ($577) are the six California cities under $2,000.
Fifteen cities charge a flat pool fee (Austin, Baltimore, Chicago, Indianapolis, Milwaukee, Philadelphia, San Antonio, San Diego, Seattle, Tampa, Tucson, El Paso, Las Vegas and Riverside) and 29 price it on the pool's value. Dallas, Jacksonville, Washington, Corpus Christi and Irvine charge per square foot or per 1,000 gallons, Fort Worth by trade ($119 each) and San Jose by the hour. Houston's schedule has no pool line, so the page uses the $91.06 structural minimum plus a $127.56 Health Department review.
Of the 40 cities whose pages state who may pull the permit, twenty-five say an owner or owner-builder may file the building permit, with conditions such as 12 months of ownership afterward in San Antonio or one permit a year in Albuquerque and Chicago. Dallas, New York and Baltimore allow only licensed contractors, and twelve of the 40 pages do not say (the other 13 cities are not recorded here). Wiring and plumbing are narrower: Baltimore, Dallas, Milwaukee, New York, Philadelphia and Pittsburgh limit electrical work to licensed electricians.
Only on two pages for a backyard pool: Charlotte requires Mecklenburg County Public Health approval first ($75), and Houston requires a Health Department plan review ($127.56) plus a health inspection. Seattle's plumbing permit comes from Public Health Seattle and King County. New York, Miami, Chicago and St. Louis send only public, commercial or shared pools to a Health agency, and St. Louis's 2001 handout still says all pools do.

The city pages behind this table

Each page quotes the code section, exempt-work list and fee schedule it relies on and records the date they were last verified.

Related: Permit fee calculator: 43 cities · Pool Permit Guide · Pool permits in all 50 cities · Pool barrier heights compared · Which cities changed their permit fees in 2026 · Permit fee change log · Open data exports

Stay up to date
Get notified when we add new cities or update permit fees.