What's Required in Corpus Christi

  • A shed larger than 200 square feet needs a building permit; one of 200 square feet or less does not.
  • Detached accessory buildings must sit behind the front face of the house.
  • All accessory buildings together may not exceed 50% of the house's square footage (75% in the FR district).
  • No accessory structure may be placed in an easement.
  • A permitted shed is filed on Form 1003 with a site plan, floor plan and foundation plan.
  • The accessory construction checklist asks for a TDI WPI-1 form and a sealed windstorm plan; ask whether your shed needs them.
  • New circuits or lights in a shed need a separate electrical permit.
  • The city cannot issue a building permit on unplatted property.

Do you need a permit for a shed in Corpus Christi?

Only if it is larger than 200 square feet. The Development Services Department's Homeowner's Guide to Permitting lists accessory structures of 200 square feet or less among the jobs that need no permit, and says a storage shed needs a permit if it is larger than 200 square feet. The city builds to the 2021 International Residential Code with local amendments effective August 1, 2023. An exempt shed is exempt from the building permit only: new circuits or lights in it still need an electrical permit, and it must still meet the zoning rules below.

Where can a shed go on your lot?

The Unified Development Code (UDC) applies whether or not you need a permit. Detached accessory buildings must sit behind the front face of the house, and all accessory buildings together may not exceed 50% of the main structure's square footage (75% in the FR district). No accessory structure may sit in an easement, and none may be built before construction of the house has started. On waterfront property an accessory structure must be set back at least 20 feet from the mean high water line. Check your zoning district's side and rear yards before you choose a spot.

How much does a shed permit cost in Corpus Christi?

It is priced by square foot. Texas Local Government Code 214.907 (H.B. 852) bars cities from basing residential permit fees on the value or cost of the work, and the city says it prices residential permits on square footage. The FY 2026 Development Fee Schedule, effective October 1, 2025 to September 30, 2026, charges plan review at $0.146 per square foot and the building permit at $0.461 per square foot with a $146.41 minimum. For a 240 sq ft shed that is $35.04 of plan review plus the $146.41 minimum permit (240 x $0.461 = $110.64 falls below it), or $181.45. A 400 sq ft shed is $58.40 plus $184.40, or $242.80. Both lines are starred in the schedule, which adds a 4.5% surcharge to starred fees (about $8 on the 240 sq ft shed), and the schedule also lists a $100.00 residential floodplain review where it applies. The schedule bases these fees on the project's square footage; we used the shed's floor area. A wired shed also needs an electrical permit at $0.075 per square foot. The schedule prints a $146.41 Minimum Permit Fee line under each trade permit, below the commercial row; we read it as the residential floor too, so confirm with Development Services before budgeting. The schedule does not say which area it uses for trade permits; we used the work area. The schedule's period ended on September 30, 2026 and it is still the newest one posted, so confirm the rates when you apply.

What you are doingCity filingRule
Shed or storage building of 200 sq ft or lessNo permitMust still meet the UDC placement rules
Shed larger than 200 sq ftBuilding permit$0.146 plus $0.461 per sq ft, $146.41 minimum permit
Adding circuits or lights to a shedElectrical permit as well$0.075 per sq ft, $146.41 minimum
Shed in front of the houseNot allowedDetached accessory buildings go behind the front face
Shed in a utility easementNot allowedNo accessory structure in an easement
Shed on a waterfront lotBuilding permit if larger than 200 sq ftAt least 20 feet from the mean high water line
Building a permit-size shed without onePenalty fee2 times the permit cost plus the $658.85 investigative fee

What do you submit for a shed permit?

File the Residential Building Permit Application (Form 1003, which has a Shed/Storage box) through the Dynamic Portal, the city's online permit portal, with a site plan of existing and new structures and setbacks; a survey may suffice. Development Services' checklist for accessory construction, which lists storage buildings, also asks for a floor plan, a foundation plan and an elevation certificate in a flood plain, and asks for a TDI WPI-1 form and a sealed windstorm plan; ask the plan reviewer whether your shed needs them. Expect layout/setback, foundation (engineer report), frame and final inspections. The city cannot issue a building permit on a property that is not platted.

How to Get a Shed Permit in Corpus Christi

1

Measure the shed and pick the spot

Check whether it is over 200 square feet and place it behind the front face of the house, outside easements.

2

Ask about windstorm paperwork

For a permitted shed, ask the plan reviewer whether you need the TDI WPI-1 form and a sealed windstorm plan before you apply.

3

Apply in the Dynamic Portal

Upload Form 1003 with the site plan, floor plan and foundation plan, and add an electrical permit if the shed is wired.

4

Pay the square-foot fee

Pay plan review at $0.146 and the permit at $0.461 per square foot, with a $146.41 minimum permit, plus the surcharge.

5

Pass the inspections

Schedule layout/setback, foundation, frame and final inspections in the portal.

Frequently Asked Questions

Up to 200 square feet. The city's Homeowner's Guide to Permitting exempts accessory structures of 200 square feet or less and requires a permit for a storage shed larger than that. An exempt shed must still sit behind the front face of the house, stay out of easements and keep all accessory buildings within half the size of the house.
It is priced by square foot under the FY 2026 fee schedule: $0.146 for plan review plus $0.461 for the permit, with a $146.41 minimum permit fee. A 240 square foot shed comes to $181.45 and a 400 square foot shed to $242.80, before the 4.5 percent surcharge the schedule adds to starred fees.
Possibly. Development Services' checklist for accessory construction, which lists storage buildings, asks for a TDI WPI-1 form and a sealed windstorm plan; ask the plan reviewer whether your shed needs them. Nueces County is on the list of coastal counties where TDI issues WPI-8 certificates of compliance.
Yes. The residential permit application has a signature line for the owner when the owner is the builder, and the city's residential code lets it issue permits to owners for work on a single-family home they own and occupy as their homestead. Wiring the shed takes a separate electrical permit, which a homestead owner may also obtain.
No. The Unified Development Code requires detached accessory buildings to be located behind the front face of the main structure. The code lets in-ground pools sit in front of the house in water-oriented subdivisions, but it makes no such exception for sheds.