Short answer: the permit for a 100-to-200-amp service upgrade costs the city fee shown in each city's own worked example, and across the 53 largest U.S. cities we cover that runs from $42 in Wichita, $57 in Baltimore, $64.90 in Washington, $70.99 in Kansas City and $72.61 in Fort Worth to $321 in Dallas, $364.85 in Seattle and $450 in San Francisco, with a median of $116. What sets the fee differs more than the fee itself: seventeen cities price by service amperage (New York, Seattle, Portland, Jacksonville, Baltimore, Fort Worth, San Diego, San Francisco, Boston, New Orleans, Virginia Beach, Wichita, Fresno, Tulsa, Riverside, Irvine and Phoenix through a fixed valuation per size), seventeen charge one flat fee whatever the amperage, eleven price on the stated value of the job and eight add up itemized components. Twenty-five cities let an owner-occupant pull the permit, thirteen more after an exam, with limits or unclear, and fifteen issue it only to a licensed electrician. A like-for-like breaker swap needs no permit in twenty cities, usually up to a stated amperage, and needs one in nine. We read each city's fee schedule, exemption list and licensing rule and recorded the city's own figure.
Every row links to the city page that quotes the rule, so you can read the source language yourself. The table sorts by any column.
All 53 cities
| City | What sets the fee | The city's own figure for a 100 to 200 A upgrade | May the homeowner pull it? | Breaker swap exempt? | Schedule the city cites, and notes |
|---|---|---|---|---|---|
| Albuquerque, NM | Itemized | $95 for a 100 to 200 A upgrade with a new meter loop: $47 administrative charge + $40 meter loop + $8 panel. A same-size panel replacement is $55 ($47 + $8); an EV charger circuit adds $8 for a fixed appliance of 30 A or more. No plan review on a residential panel change. | Yes, for an owner-occupant who passes the city's written electrical exam at 75% (four hours, two attempts, one passing exam a year); rentals need a licensed contractor. | Yes: UAC 109.2.3 exempts the current-carrying parts of switches and control devices and same-type receptacle swaps. | 2024 Uniform Administrative Code Table 112-B, 109.2.3, 111.1, 113.5.2 Service upgrades and replacements must be inspected within 180 days; re-inspections $47; the utility's own service drop and metering are outside the city permit. |
| Aurora, CO | Flat fee ⚠ | $190 flat for a residential electrical service upgrade, whatever the amperage or contract price. Use tax: $56.25 on $1,500 of panel and breakers. A panel replacement the Permit Center does not class as a service upgrade is not named on the flat sheet; the valuation calculator returns a $166 permit fee for a $3,000 job. | Not stated for the electrical work: homeowners can obtain permits for work on their primary home, but the page says to ask the Permit Center whether an owner may do their own electrical service work. An electrician needs a State of Colorado master's and contractor's license on file with the Building Division. | Replacing a switch or outlet in place needs no permit unless a new device is installed where none existed; breakers are not listed, so ask the Permit Center. | City 2026 flat-rate fee sheet; Building Division permit chart; 2026 National Electrical Code, effective 8-1-2026 Related flat fees on the same sheet: EV charger $99, home battery $191, residential solar PV $500. Use tax is 3.75% of materials cost, plus 0.25% in Arapahoe County. The city does not publish a turnaround time. |
| Austin, TX | Flat fee | $85.91 for a service upgrade, for example 100 to 200 amps, that changes the service load: the $73.81 stand-alone trade permit fee (the page's reading, since the schedule lists no panel fee) plus the $12.10 Electric Service Application Processing/DGPA fee the schedule names. A panel swap with no load change is $73.81. Amperage and job cost do not change either figure. | Probably not for the main service panel. Stand-alone trade permits go only to a licensed contractor registered with Building and Trade Contractor Services or a qualified homestead owner, and the Homestead Permit excludes the main electric service. Other work, like a subpanel, may qualify. | Yes, in kind: replacing a branch-circuit breaker of the required capacity in the same location is exempt. A panel replacement, a service upgrade or a new subpanel is not. | FY 2026-27 residential fee schedule (Inspections for Standalone Projects; Electric Service Application Processing/DGPA), effective October 1, 2026; list of work exempt from permits; Texas Occupations Code 1305.151 Extra inspections beyond two are $28.01 each, a failed-inspection return visit is $83.85, and card payment in AB+C adds a 2.35% service fee ($2.00 minimum). Austin Energy needs an ESPA or DGPA form when its meter is involved, and its own charges are not in this schedule. |
| Baltimore, MD | By amperage | $57 for a 100 to 200 A upgrade: $30 service fee (over 100 to 200 A) + $25 application fee + 5% permit tax rounded up. Up to 100 A is $25 ($52 all in); over 200 to 400 A is $40 ($67); each new or replaced branch circuit adds $6, so a 200 A upgrade with four circuits is $82. | No. Electrical permits issue only to master, master restricted, restricted or maintenance electricians licensed in the City (Section 2706.2). | No. The city marks the model code's same-location breaker exemption Not Adopted, so even a like-for-like breaker swap is permit work. | BFRCBC 109.6.2(a) and (b), 109.5.7, 109.7; Part X R105.2 electrical item 3 A $10 electrical certificate is required before the service is energized; services up to 400 A need no plan review; unpermitted work pays the greater of $1,000 or 50%. |
| Boston, MA | By amperage | $70 for a 200 amp upgrade at 240 volts ($20 + 200 x $0.25); $45 for 100 amps and $120 for 400 amps. With no change in service the fee is $20 plus $1 per fixture, plug or outlet. A short-form building permit is added if non-structural walls are opened. | No. ISD's electrical permit is for licensed contractors only and the applicant must be the electrician performing the work; homeowners cannot apply. | No exemption stated: the permit covers installations, alterations and repairs, so a same-size panel swap needs one, with the fee line not stated (on the cost line, $50 on a $3,000 job). The page tells readers to treat breaker and panel work as a licensed electrician's job. | ISD electrical permit fees; ISD service upgrade guide Work must start within six months of issuance and the licensed contractor must be on site for the inspection. ISD lists no renewal for electrical permits. |
| Charlotte, NC | By job value | About $87.08 for a $5,000 service upgrade on Mecklenburg County's valuation table ($59.70 up to $3,000 + $12.19 per $1,000 + $3 technology charge); about $74.89 for a $3,500 panel swap. An owner-occupant doing the work pays $60 + $45 per inspection trip + $3, about $108. | Yes, under G.S. 87-43.1(5a) for the owner on the tax records who lives in the home and will not sell within a year, with a homeowner account, bond and certificate. | Like-kind receptacle, switch and fixture swaps are exempt only when a licensed electrician does them; breakers are not named and a panel is never exempt. | LUESA Fee Ordinance rev. 2026-07-01; G.S. 160D-1110; G.S. 87-43.1 Mecklenburg County Code Enforcement issues it, not the City; contractors buy it instantly through TIP; the County urges a contractor for service equipment. |
| Chicago, IL | Flat fee | $75 express permit for a service or panel under 400 A, whatever the amperage; $225 with up to 10 new branch circuits; $300 for a service of 400 to under 1,000 A; plus a $25 review fee if the application needs review. | No. All permitted electrical work must be performed by a Chicago-licensed electrical contractor; no owner-occupant exception. | No. A breaker swap is not on the exemption list (lamps, cord-and-plug, low voltage); it is a $75 express permit under the repair-or-alter subtype. | Table 14A-12-1204.2; DOB list of work not requiring a permit; Express Permit Program An annual CPI adjustment starts with the 2027 schedule; owners 65 and older meeting income and residency tests can have the fee waived. |
| Cincinnati, OH | Flat fee ⚠ | $100 for a panel replacement or 100 to 200 A upgrade: the Inspection Bureau, Inc.'s $60 processing and certificate fee + $40 service-entrance line (one inspection trip); IBI's pre-calculated list rounds it to $101. With added wiring the line is $85, so $145 ($146.45). A two-family house adds $30. | Ask IBI: the city requires an OCILB-licensed contractor for permit work, but its contractor chapter exempts an owner-occupant of a one- to three-family home and IBI says it serves do-it-yourselfers. | Yes: a breaker of the required capacity and type in the same location is exempt under RCO 102.10, and IBI treats minor repair as exempt. | Cincinnati Building Code 1101-17.4 and 1106-5; IBI fee schedule (eff. 2025-01-01) The permit is a private agency's, not the city's, filed in CAGIS ezTrak since 2026-09-14; starting early doubles the fee. |
| Colorado Springs, CO | By job value | $161.50 for a $4,000 service upgrade: $132.50 for the first $2,000 + 20 x $1.45. A $2,500 panel replacement is $139.75. The fee follows the job cost on Table C, and the page gives no fee by amperage. There is no plan check or city zoning fee on a stand-alone electrical permit. | Yes, in the home you own and live in, under a homeowner permit, and you must pass every inspection. Not for a rental, and not for a hired contractor; an electrical contractor needs a Colorado license and PPRBD registration and pulls the permit. | Not addressed on the page: it lists panel change-outs, panel upgrades and new sub panels as needing a permit and says nothing about swapping a breaker. | PPRBD fee schedule Table C and PPRBD fee calculator; 2023 NEC as adopted through the 2023 Pikes Peak Regional Building Code Electrical permits come from the Pikes Peak Regional Building Department, a regional authority. A panel inside a permitted remodel attaches at $50 (Table B.1). A $1,500 job such as a sub panel is $105. County use tax is extra unless you sign the sales tax affidavit. |
| Corpus Christi, TX | Flat fee | About $146.41 for replacing a panel or meter loop: the $0.075 per sq ft rate with the $146.41 minimum line, read as the floor (our reading), covers any area up to about 1,952 sq ft; if the city counts a 2,500 sq ft house, the fee would be $187.50. The page says the schedule does not state which floor area applies to a stand-alone panel change. | Yes, on a homestead: the owner may pull the electrical permit with a notarized Homeowner's Work Affidavit, and only the resident owner may do the work. Otherwise a Texas-licensed electrical contractor registered with the city. | Not addressed for breakers by name. Replacing a meter loop or panel needs an electrical permit, and the page lists low-voltage, cable or phone wiring under 25 volts as exempt. | FY 2026 Development Fee Schedule; Homeowner's Guide to Permitting; 2020 National Electrical Code with local amendments; Texas Local Government Code 214.907 The residential rate is starred, so the 4.5% surcharge applies (about $7 on $146.41); whether it reaches the unstarred minimum line is not stated. A failed inspection can add a $117.13 re-inspection fee after the second inspection. Service equipment needs fault current protection of at least 22,000 amps, and a service masthead must extend at least 42 inches above the roof. |
| Dallas, TX | Flat fee ⚠ | $321 for any panel replacement or service upgrade: $181 Table B-II alteration fee + $125 inspection fee (one trade) + $15 technology fee; $339.10 in a planned development, SUP or deed-restricted area. Amperage and job price do not change it. | Only on a homestead after passing the city's oral or written exam; the permit is issued at the field office. | Yes, for branch or feeder breakers and fuses rated 30 A or less, and device repairs under $1,000 with no service change. | Chapter 52 Table B-II and Sec. 301.2.4; fee schedule eff. 2025-07-01 Only Master Electricians registered with the city obtain the permit; a failed inspection is $75. |
| Denver, CO | By job value | $59 for a $5,000 service upgrade ($35 for the first $2,000 plus three times $8); $43 for a $3,000 panel replacement and $35 for $1,800. An electrical quick permit pays only the building permit fee, with no plan review fee, for single-phase services of 400 A or less. | After an exam: an owner-occupant of a one-family house who passes Denver's free homeowner electrical exam (a state license can substitute) and applies by email, not in E-permits; otherwise a Denver-registered electrical contractor. Duplexes, townhouses and condos do not qualify. | Not addressed for breakers on the page: it says electrical permit exemptions follow the state electrical code and state statute rather than a Denver list. A panel or subpanel replacement needs the quick permit. | Denver electrical quick permit list and valuation fee table; 2026 National Electrical Code as adopted by Denver A service over 400 A, or a second separate service to a detached structure, needs stamped engineered plans and plan review. Card payments add 2.5 percent; work started without a permit pays double fees, with a $100 minimum. |
| El Paso, TX | Itemized | $157 for replacing one main panel ($110 base + $47), and $204 for a service upgrade with a subpanel ($110 + 2 × $47), each plus a technology fee whose amount Schedule C does not state; the page gives these as its reading. A $30 item applies to a temporary service or service release, and service entrance charges are capped at $130. | No. Only contractors licensed by the state and registered with the city can obtain electrical permits, under a Texas master electrician; the homeowner affidavit says a homeowner may not obtain electrical permits unless licensed and registered. | Not addressed for breakers by name. The exempt list covers only replacing switches, receptacles and fuses and adding fans, light fixtures or outlets onto an existing circuit with capacity; a panel or service change is not on it. | FY 2027 Schedule C (itemized lines 511 and 515); City Code 18.10.040; 2020 National Electrical Code Schedule C also prints value-tiered electrical lines (503-508); the page prices a panel change on the itemized lines and says to confirm the total with the department. A standby generator is $51 and solar panels $14 each on the same base fee. |
| Fort Worth, TX | By amperage ⚠ | $72.61 for a 200 A upgrade ($33.08 application fee + $39.53 service item for over 150 A), or $89.48 if the $16.87 technology fee is added; a 100 A panel is $52.83 ($19.75 item) and 125 to 150 A is $62.25 ($29.17). New devices add $0.54 each. | Not the main panel: the homestead permit covers only work after the first main breaker, so subpanels and circuits, never the service. | Yes: replacing an overcurrent device of the required capacity in the same location is exempt, as are like-for-like switches, outlets and fixtures. | Fee Ordinance 26-28781 (eff. 2026-10-01); Administrative Code 105.2 (Ord. 25387-03-2022) 2026 NEC with city amendments since 2026-09-01; the utility reconnects only after the city's release; reinspection $66.15. |
| Fresno, CA | By amperage | About $177 to $180 for a 200-amp main panel upgrade valued at $4,500: $111.50 + $27.08 = $138.58 base, plus about $14 General Plan surcharge on the permit fee (about $18 if also applied to the $27.08 issuance fee) and the $23.79 technology surcharge. A service over 400 amperes up to 1,000 amperes is a complex item at $935.79 plus the $27.08 issuance fee, $962.87. | Yes, with limits: the page's affidavit step has the Permit Affidavit Form carry the license or owner-builder declaration, and the city's permit affidavit cites Business and Professions Code 7044 (work done personally or with your own employees, principal residence of 12 months, no more than two structures in any three-year period). | No. Nothing electrical is on the city's list of exempt work, and the city quotes the rule that anyone who installs, alters, repairs or replaces an electrical system needs the permit; the page does not name a breaker swap. | Master Fee Schedule effective July 1, 2026 (services of 600 volts or less and not over 400 amperes; complex electrical items); building code rule quoted by the city The simple permit covers any combination of simple items, so new circuits do not add a second simple fee. The schedule also lists a workers' compensation insurance verification charge of $33.84 per transaction in the trade-permit section; the page says to ask whether it applies. Contact PG&E about service work. |
| Honolulu, HI | By job value | $78 for a $3,000 panel and meter upgrade at a house on an instant online permit; a $6,000 service upgrade is $144. An instant permit has no plan review fee; if the job needs a permit with plans, add 20% for plan review. A job of $1,000 or less pays a flat $20 up to $500, or $8 plus $2.50 per $100 above that, so at most $33. | No. Only a Hawaii-licensed electrical contractor can do the work, and the contractor must accept the project in HNL Build. DPP's FAQ says the owner-builder exemption in HRS 444-2.5 excludes electrical work unless the owner holds the license. | Not for service equipment: a panel, meter base or service upgrade always needs a permit. The one repair exemption, for a licensed electrician's repairs valued at $2,500 or less in any 12-month period, does not apply to work that involves service entrance equipment. The page does not name a like-for-like breaker swap. | ROH 18-3.1(a) and 18-6.2; DPP's instant online permit list (meter replacement or upgrade); HRS Chapters 444 and 448E Houses outside flood zones with no DPP warning qualify for the instant permit; townhome, apartment and flood-zone work needs a building permit with plans. The electrician requests the inspection by fax at least 48 hours ahead, and Hawaiian Electric's metering release may only be obtained after a valid permit is issued. |
| Houston, TX | Flat fee | $127.56 for the Electrical Meter and Loop Service permit on a 200 A upgrade ($94.00 up to 50 kW + $33.56 administrative fee); a panel permit alone is $124.62 ($91.06 minimum + admin). Amperage does not change either figure. | No. Electrical permits are issued only to registered master electricians; Houston has no homeowner electrical permit. | No exemption listed: the Top 10 sheet says any work to repair, replace, alter or install electrical equipment requires a permit. | 2026 Building Code Enforcement fee schedule; HPC Circuit Panel (HPWCODE 1062) and Meter and Loop (1055) pages A panel plus a meter loop are two permits; CenterPoint's meter and service-drop charges are separate. |
| Indianapolis, IN | Flat fee | $169 for a panel replacement or 100 to 200 A upgrade in a house of up to 1,000 sq ft, plus $23 per additional 500 sq ft ($192 at 1,500, $215 at 2,000, $238 at 2,500). No application fee on craft permits; amperage does not change it. | Only an owner who occupies a one- or two-family home, with the electrical board's written approval through DBNS's homeowner exam (Sec. 875-222). | Yes: breaker replacement and plug-in appliances on existing circuits are exempt under Sec. 536-201(b)(18) and (b)(20). | DBNS fee schedule 2026-01-05; Sec. 536-201(b)(29); Sec. 875-222; Sec. 536-404 A same-size meter base, riser or weatherhead repair is exempt; a $22 self-certification tag lets a licensed contractor have power reconnected before the city inspects. |
| Irvine, CA | By amperage | About $107 for a 200 amp service upgrade: $68.60 plus $31.88 issuance plus $6.86 automation. With a subpanel at $63.56 it is about $177: $132.16 in items plus $31.88 and $13.22 automation. A service of 401 to 800 amps is $171.59 before issuance and automation. | Limited: Bulletin 222 permits home work to a state-licensed contractor, with one very limited exception, an owner-builder who signs the city's Property Owner's Package; PermitsDIRECT! accepts homeowner applications for panel upgrades. | Only repairs: resetting or repairing a breaker of the same rating in the same location needs no permit; replacing or upsizing the panel is permit work. | Schedule V and Schedule II item 21, effective August 15, 2026; Permits Not Required list; PermitsDIRECT! Electrical Panel Upgrades; Bulletin 222 (owner-builder exception) The page says the schedule does not state whether a panel swap is priced as a service, a panel board or both; it priced a main panel on the service line, so confirm with the Permit Processing Counter. The residential minimum inspection fee is $63.77, and each permit includes one re-inspection at no charge. |
| Jacksonville, FL | By amperage | $100 for a 101 to 200 A service upgrade (the residential service charge); $80 up to 100 A; $20 per additional 50 A, so $180 at 400 A. A panel replacement with no service change is the $60 repairs line. Florida's 1% and 1.5% surcharges ($2 minimum each) are extra. | Yes, under FS 489.503(6) for an owner-occupied single-family or duplex home: on the deed, in person, with proof of homestead exemption. | Like-for-like fixtures, switches, fans and receptacles get a no-inspection permit under 320.408(f); breakers are not on that list. | Ordinance Code Sec. 320.409 and 320.408(f); FS 489.503(6) A job over $5,000 needs a recorded Notice of Commencement; a failed inspection is $45; 2020 NEC. |
| Kansas City, MO | By job value | $70.99 for a $5,000 upgrade to 200 A on the one- and two-family valuation table ($58 for $1,001 to $2,000 + $4.33 per additional $1,000); a $2,000 panel swap is $58; the minimum is $52. No drawings for a service under 400 A. | Yes, for an owner who lives in a single-family home and does the work personally with family or friends, on the IB146 affidavit; two-family homes are contractor-only. | Switch, receptacle and fixture swaps on an existing circuit are exempt under 18-16(b)(5); breakers are not listed. | KCBRC 18-20(b)(2) and 18-16(b)(5); Information Bulletin 160 Starting before the permit triples the fee; a utility-requested inspection of an existing service is $54, credited toward a permit; 2017 NEC. |
| Las Vegas, NV | Flat fee | $199 for a service change or upgrade, for example to a larger service: $102 plan check + $97 permit. An exact panel change-out or meter tag is $96 ($0 + $96), and a new service of any voltage and amperage is $242 ($102 + $140). Each permit adds a $2 technology fee. | Yes, on the owner's own primary residence under NRS 624.031(5) with an approved Contractors Board owner-builder affidavit, mainly single-family homes. The homeowner guide says only licensed electricians, along with homeowners working on their own homes, may do electrical work in Nevada. | Yes: the homeowner guide exempts replacing a defective breaker like for like, a broken outlet that is not GFCI-required, light bulbs and an existing appliance of 30 amps or less. Changing out, upgrading or relocating the main panel is not exempt. | Building User Fees schedule Table 3-D #44 (meter tags and exact panel change-outs), #57 (new service) and #58 (service change); homeowner guide electrical items; Online Permits List Exact change-outs, meter tags and service changes are issued online without plans, and a service change needs a 231 inspection. An alteration needs a load calculation unless 12 devices or less are added, and a pool needs one if the main service is under 200 amps or there are two or more pumps. |
| Long Beach, CA | Flat fee ⚠ | About $215 for a 200 A changeout or upgrade: $23 service item + $17 panel item, lifted to the $100 permit minimum, + $115 processing fee; a like-for-like 400 A replacement is also $215 ($34 + $17). An upgrade above 200 A adds electrical plan check at a $216 minimum, about $431 to $466. | Yes, for a one- or two-family principal residence occupied 12 months, at most twice in three years (IB-029); otherwise a CSLB contractor with a Long Beach business license. | Yes: breaker swaps and same-type receptacle, switch and fixture replacements are exempt under LBMC 18.04.020.D. | Electrical Permit and Plan Check Fee schedule; IB-058 items E1, E10, E11; IB-002; LBMC 18.04.020.D Panel changeouts are issued online through the Customer Portal at any hour; express service is not available in the Coastal Zone or a Historic District. |
| Los Angeles, CA | Flat fee | $107.91 on the city's calculator for a 200 A service plus panel ($16 + $16, lifted to the $99 minimum subtotal with the issuing fee and surcharges); a 400 A service plus panel is the same $107.91. Four new circuits make it $118.10; $206.01 if LADBS charges plan check. | Yes, after 12 months of residence, as owner-builder; otherwise a CSLB C-10 contractor. | Not addressed on the page; LADBS lists no small-job exemption for panel or service work. | LADBS electrical fee schedule; Express Permit list; Permit Fee Calculator The items are tiered by amperage ($34 service and $38 panel for 201 to 600 A) but the $90 minimum makes a 200 A and a 400 A job cost the same. |
| Louisville, KY | By job value | $100 for a panel replacement or 100 to 200 A upgrade, the fee for work costing over $750 ($75 at or under $750), one inspection included and $50 for each extra. Amperage does not change the fee on a one- or two-family home. | Yes, in a home the owner lives in or will live in, on a notarized homeowner certification that the home is not for sale and the owner does all the work. | Yes: a breaker of the required capacity in the same location is exempt under KRC R105.2. | LMCO 150.096 (rev. 2024-02-06); KRS 227.480; Kentucky Residential Code R105.2 Electrical work started without a permit carries a $1,000 minimum penalty; contractors file in the Louisville Metro Business Portal. |
| Miami, FL | By job value ⚠ | About $180 for a service upgrade over $2,500: the $110 minimum (0.5% of cost) + $40 application + $26 minimum solid-waste surcharge + about $4 in state surcharges. A panel swap under $2,500 pays the fixed $45 instead, about $115. A county surcharge of unstated rate is extra. | Yes, as owner-builder of an occupied single-family or duplex home under FS 489.503(6), appearing in person to sign. | Only by a licensed electrical contractor: City Code 10-5(b) exempts replacement of damaged breakers, receptacles, switches and lights when a licensed contractor does it. | City Code 10-5(b) and 10-18(b)(1); FS 489.503(6) No engineer-sealed drawings unless the residential service exceeds 600 A; unpermitted work pays double plus $110 on a homestead. |
| Milwaukee, WI | Itemized | $157.08 for a 100 to 200 A upgrade: the $130 line for a service with one service switch up to 400 A + 1.6% surcharge + $25 processing fee. A subpanel's $55 feeder line is lifted to the $100 one- or two-family minimum ($126.60); a duplex's second service switch adds $35 ($192.64). | No. The homeowner exemption covers only replacing a switch, receptacle or fixture rated 20 A or less; panels go to a state-licensed electrical contractor. | No. Correctly sized fuses may be replaced without a permit; breakers are not on the list, so a licensed electrician pulls a permit. | MCO 200-33-11; MCO 222-1 and 222-13 Starting before the permit can quadruple the fee; missed inspections cost $110 and reinspections $110, $140 then $220. |
| Minneapolis, MN | Itemized | $101 for a 200 A upgrade that reconnects 20 circuits, with one inspection: $35 for a service up to 400 A + $2 per reconnected circuit + $25 permit fee + $1 surcharge (the itemized $75 beats the $55 trip minimum); $136 if a rough-in inspection is also required. The smallest permit is $81. | Yes, for an owner who occupies a single-family home with its own electrical service; never on a duplex, condo or rental. | Not addressed on the page. | Minn. Stat. 326B.37; Minneapolis Code 91.300; DLI homeowner application The permit comes from the Minnesota Department of Labor and Industry, not the city; it is void 12 months after filing; new circuits are $12 each. |
| Nashville, TN | Itemized ⚠ | $75 for a 200-amp panel and service upgrade: $12 + $10 = $22, below the $75 minimum. A 400-amp service with a service release is $150: $12 + $20 = $32, raised to the minimum, plus a $75 service release. | Unclear. Licensed contractors file electrical permits online in ePermits; anyone who is not a licensed contractor applies at the department, and the page says whether a homeowner may permit their own panel work is a question for Permit Issuance. | Not addressed on the page: it lists no small-job or breaker-swap exemption, and a subpanel needs an electrical permit. | Metro Code 16.20.250 electrical fee schedule; Metro permit list; Metro amendments to the 2023 NEC Metro, not the State Fire Marshal, permits electrical work in Davidson County. A re-inspection is $50, and a panel upgrade in an existing home brings interconnected smoke alarms. |
| New Orleans, LA | By amperage ⚠ | $100 for a 200-amp panel or service change with no new circuits: $40 + $60 ($0.30 per amp). A 100-amp service is $70 and a 400-amp service is $160; each new circuit adds $3, so a 200-amp upgrade with four new circuits is $112. | No. Only an electrical contractor holding a City of New Orleans Class A Electrical License can obtain the permit; a homeowner cannot pull one even for the home they live in, and the electrician files in the One Stop App. | Not exempt: the page lists only two exceptions to the electrical permit, replacing light bulbs and fuses, so a panel or breaker replacement needs a permit. | City electrical permit application (service amperage and new circuits); Class A Electrical License rule The city's fee schedule lists its historic-district surcharge for building, plan review, demolition and sign permits, not electrical permits. Some electrical permits also need a building permit; ask Permit Intake at (504) 658-7299. The permit stays valid only through 6 months of inactivity. |
| New York, NY | By amperage | About $150 in DOB fees for a 200 A upgrade: $40 application + $30 service switch (101 to 200 A) + $45 for a set of 4/0 or 250 MCM service cables + $37.50 for a panel over 20 spaces. The switch is $8 up to 100 A and $105 for 201 to 600 A. | No. Only a NYC Licensed Master Electrician may file and perform electrical work; there is no homeowner exemption. | No. Replacing a breaker of 30 A or less is minor work: a $15 permit by a Licensed Master Electrician, no DOB inspection. The main disconnect is general work. | 1 RCNY 101-03; DOB electrical owner and registrant requirements The electrician's price and Con Edison's service work are separate; the rule caps additional per-unit fees at $5,000. |
| Orlando, FL | By job value | $90.95 for a $3,000 panel swap ($66.24 + 2 × $11.03 = $88.30, plus a $2.65 technology surcharge) and $113.67 for a $5,000 service upgrade. The schedule also lists a $50 Change of Service line; the page says to ask which applies. | Yes. Florida Statutes 489.503(6) lets an owner do electrical work on a single-family or duplex home for his or her own use and occupancy, not intended for sale; the owner signs the Owner/Builder Declaration in person and must pass the city's inspections. | Not addressed for breakers on the page. A panel replacement or service upgrade needs an electrical permit, and electrical work is excluded from the state exemption for jobs under $7,500 regardless of cost. | City 2026 residential fee schedule; Electrical Permit Application (Repair and Change of Service subtypes); FS 713.135; FS 489.503(6) A recorded Notice of Commencement is filed before the first inspection when the cost is over $5,000 and the work is not part of a building permit. A failed inspection adds $150, and work started without a permit costs an additional 100% of the permit fee. |
| Philadelphia, PA | By job value ⚠ | $107.50 for a $4,000 service upgrade ($25 per $1,000 of electrical cost + $3 city and $4.50 state surcharges); a panel replacement at the $63 minimum is $70.50. Service equipment up to 200 A is an EZ permit with no plans, auto-issued; over 200 A takes plans and 20 business days. | No. A licensed electrical contractor must perform all electrical work; an owner who applies must attach the contractor's letterhead statement and contract. | Yes: replacing lamps, circuit breakers, fuses, switches and receptacles is exempt under Title 4-A-301.2.3. | L&I fee summary PG_012; EZ Residential Service Equipment standard PB_028; Title 4-A-301.2.3 The owner also hires a licensed third-party electrical inspection agency whose rates the city does not publish; new and upgraded services need an outdoor emergency disconnect. |
| Phoenix, AZ | By amperage | $219 for a 200 A service: Table A ($195 on the first $1,000 + $12 per additional $1,000) on the city's fixed valuation of $2,620. A 100 A service is valued at $1,750 ($207), 400 A at $3,850 ($231); a higher contract price is used instead. | Yes, for a home the owner will occupy, under ARS 32-1121.A.5; the city licenses no electrical journeymen. | Yes, in kind up to 125 A, and devices up to 60 A; the service disconnect is excluded from both exemptions. | 2026 Development Fee Schedule App. A.2; Valuation Guide TRT 00001; 2024 PBCC 105.2 No plan review fee under $5,000 with a counter review; 2023 NEC; 20 ft of #4 copper Ufer and #4 bonding on services of 200 A or less. |
| Pittsburgh, PA | By job value ⚠ | $141.50 for any panel or service job valued up to about $21,600: the $130 minimum ($6 per $1,000 of construction value) + $4.50 state training fund + $5 digital record + $2 technology fee; a $25,000 service relocation is $161.50. Over 400 A needs stamped drawings. | Plan on no: anyone performing work that needs an electrical permit must hold a City of Pittsburgh electrical trade license, and panels are excluded from the EZ work homeowners may do. | No. PLI's exempt list covers lamps, portable equipment, test systems, communications wiring and utility equipment; breakers are not on it. | PLI 2026 Fee Schedule; PLI electrical permit scopes and EZ Permit pilot Panels are not EZ-eligible, so standard review takes 15 to 30 business days; 40% of the base fee is due at application. |
| Portland, OR | By amperage | $237.44 for a 200 A service ($212 + Oregon's 12% surcharge); $333.76 for 201 to 400 A ($298); $391 before surcharge for 401 to 600 A. Branch circuits bought with the service are $21 each; a reconnect-only permit is $212.80. | Yes, for the recorded owner (not an LLC) who lives in the home and is not selling, renting or leasing it; never on a rental or an ADU. | Fuse replacement and appliance swaps are exempt; breakers are not listed on the page. | PP&D 2026 electrical fee schedule; ORS 479.540 Trade permits issue within 24 hours on DevHub; a 25% plan review fee applies only when plans are required; reinspections $161. |
| Raleigh, NC | Flat fee ⚠ | About $129 for a residential panel or service change: the guide's $124 minimum trade fee plus the 4% technology fee. The guide's $198 service repair or replacement fee is a commercial line, and the guide has no residential panel line, so unlisted fees are charged at the minimum. | Yes: a homeowner on a home they own and do not intend to rent, lease or sell files the notarized Owner Exemption Affidavit and applies by email, then passes the city inspection; otherwise a licensed North Carolina electrical contractor registered in the Permit and Development Portal. | Not for panels. Only like-for-like replacement of light fixtures and devices such as receptacles and switches in a one- or two-family home needs no permit, when a licensed electrician does it at the same voltage and the same or lower amperage. | G.S. 160D-1110; FY27 Development Fee Guide (July 1, 2026 to June 30, 2027) minimum permit fee; Electrical Work permit type Re-inspections cost $127 each. The application asks for your total electrical cost, and the final fee is on the portal invoice. A permanently installed generator also needs a zoning permit and must meet house setbacks. |
| Riverside, CA | By amperage ⚠ | About $149 for a 200 amp main panel replacement: $90 + $41 = $131, plus the 14% surcharge. A service in the 201 to 1,000 amp band is about $229; above 1,000 amps the line is $352. A 200 amp upgrade with a new subpanel and an EV charger circuit is about $271. | Likely, as owner-builder, but the page says to ask the counter whether a panel permit is one of the permit types; a hired electrician needs a CSLB license and a City of Riverside business license. | Not clearly: Bulletin 140's electrical exemptions cover only minor repair and maintenance such as replacing lamps, and the page says to ask about breakers. | Electrical service lines by amperage, FY 2026/27 Schedule of Fees and Charges (effective July 1, 2026); Bulletin 140 (August 4, 2026) Residential service meter upgrades can be issued same day over the counter. A stand-alone panel swap may not go through plan check, so ask the counter. A Bulletin 251 load calculation worksheet, if used, goes in the plan set. |
| Sacramento, CA | Flat fee ⚠ | About $134.50 for a $6,000 contractor-filed 100 to 200 A upgrade: the flat $105 Residential Minor Electrical fee + 10% technology surcharge + $2.60 per $1,000 General Plan fee + $1 green building fee + the business operations tax. An owner-builder's $3,000 panel swap is about $124.30. Same $105 at any amperage. | Yes, as owner-builder, but by email with forms CDD-0200, CDD-0220 and CDD-0035; homeowners cannot pull electrical permits online. | Not addressed on the page. | Table B.1 (eff. 2025-07-19); Planning Express form CDD-0035 No plans; a relocated exterior panel must be screened from the street; a $107 safety inspection may be needed before SMUD reconnects. |
| San Antonio, TX | Itemized | $69.29 for a 200 A upgrade with CPS Energy work ($57.50 base + $3.74 service rating 0 to 200 A + $5.58 panelboard + $2.47 CPS item), $74.83 with the two 4% surcharges. A panel swap without CPS work is $66.82; a 400 A service with two panels $78.61 ($84.90). | No. Homeowners must use licensed trade contractors for electrical work; only homestead plumbing is open to owners. | Possibly, as minor repair or maintenance by a licensed electrical contractor under 10-6(e)(2)a; the page says confirm with DSD. | DSD FY2027 Development Fee Schedule (rev. Sept 2026); City Code 10-6 Paper applications add $11.50 and cards 3%; PE-sealed drawings only over 600 A; CPS reconnects after the final inspection. |
| San Diego, CA | By amperage | $176.57 Simple Permit for a panel replacement or upgrade up to 200 A, online with no plans. A service of 225 to 400 A uses the $353.13 line; over 400 A needs plans. Five new circuits add $176.57. | Yes, as owner-builder with form DS-3042, issued in about two business days; tenants cannot sign. | Yes: same-size, same-type replacement of breakers, switches, fixtures and receptacles is exempt under SDMC 129.0303(a). | IB 103 Table 2; SDMC 129.0302, 129.0303, 129.0306 No plan check, so the $737 General Plan Maintenance Fee does not apply; historic properties file a plan permit instead. |
| San Francisco, CA | By amperage | $450 flat for a panel or service replacement with equipment rated 225 A or less (Category 3, two inspections included); $709 for 250 to 500 A. When the panel is part of a rewiring job, Category 1's $580 tier for up to 40 devices includes a 200 A upgrade. | Only the owner of a stand-alone single-family house, for work done personally, after meeting an inspector at the Permit Center; LLC-owned homes excluded. | Yes, for a defective breaker of the same type and rating up to 100 A; replacing the main service disconnect is permitted and inspected at any rating. | SF Electrical Code 89.120 and 89.121; DBI Table 1A-E (permits issued on or after 2026-07-12) Fees are paid in full before DBI grants permission to energize; a return inspection costs $259 per half hour. |
| San Jose, CA | Flat fee ⚠ | $315 minimum (one hour of inspection time at $315) for a service change up to 200 A, an online permit with no plans; about $526 with the $211 processing line the FY2026-27 schedule lists for a counter-filed permit. The online checkout shows the exact amount. | Yes, as owner-builder of a principal residence occupied for 12 months; contractors must be CSLB-licensed for jobs of $1,000 or more. | Yes, in a one- or two-family home: a breaker of the required capacity in the same location is exempt under SJMC 24.02.150.6. | FY2026-27 Schedule of Fees and Charges (eff. 2026-07-01); SJMC 24.02.100, 24.02.150 2025 California Electrical Code since 2026-01-01; the utility reconnects only after the city inspection. |
| Seattle, WA | By amperage | $364.85 for a 150 to 200 A service ($292 + $55.48 administrative fee + 5% technology fee), issued instantly online. Up to 125 A is $211.55 ($146 base); 225 to 350 A is $441.50 ($365 base); 400 A and up is plan review priced on the value of the work. | Yes, for an owner who occupies the home and does the work; contractors need a Washington electrical license and a Seattle business license. | Yes: like-in-kind branch-circuit breakers, thermostats and controls are exempt under 80.50(B)(3); service equipment is not. | 2026 Fee Subtitle Table D-15 item 6; Seattle Electrical Code 80.50 Fees rose 18% on 2026-01-01; Seattle City Light must be coordinated for a service change; the service inspection passes before energizing. |
| St. Louis, MO | Flat fee ⚠ | $85 for a panel replacement or 100 to 200 A service change ($25 application fee + $60 service-only line); $125 when the service change comes with other alterations ($100 line). The fee page's note prices a new-service-only job at $100, so budget $125. | No. The homeowner permit (owner-occupied single-family, written test) excludes electrical service changes; panels go to a contractor licensed by the City. | Yes, for lamps, fuses and breakers up to 60 A, and like-for-like outlets, switches and single fixtures, under Electrical Code 80.3.2.1. | Electrical fee table (Ord. 70802); Electrical Code 80.3.1, 80.6.2.1, 80.8.1 Most trade applications are approved in 1 to 3 business days; a house without service for six months needs a $30 re-inspection before reconnection. |
| St. Paul, MN | Itemized ⚠ | $86 for a straight panel swap ($85 service permit + $1 state surcharge); a service upgrade that adds four new circuits is $145 plus the surcharge ($85 + 4 x $15). The $85 service permit covers the new service and all existing circuits reconnected to the new breakers; each additional or modified circuit or feeder adds $15. | Yes, for a homesteading owner of a single-family home, one side of a side-by-side duplex or a townhome with rated walls, who signs DSI's homeowner affidavit and does the work personally; never on property rented, leased or occupied by others. Otherwise a licensed electrical contractor. | Not addressed for a single breaker swap. The page says every service upgrade, panel replacement or change-out needs a city electrical service permit, and prices adding or changing circuits at $15 per circuit with an $85 minimum. | Legislative Code Section 33.04; DSI residential service upgrade handout (July 2023); 2026 NEC Saint Paul runs its own electrical permits through DSI, not the Minnesota Department of Labor and Industry. Electrical permits of $250 or less are void 12 months after issue if the final has not passed, and the code doubles the fee as a penalty if work starts before the permit. |
| Stockton, CA | By job value | About $209 for a panel job valued at $2,000 and about $327 for a service upgrade valued at $5,000, read from the Residential Fees Fixed Table ($147 permit + $62 plan check if it applies; $230 + $97). This is the page's estimate: the FY 2026-27 Adopted Fee Schedule effective July 1, 2026 has no electrical line, and another plausible reading is the flat $314 Residential Minor Remodel line. Percentage add-ons are not included. | Yes: the city has no panel-specific handout, but its electrical handouts issue permits to the property owner with a completed Owner/Builder form or to a California licensed C-10 contractor with a current City of Stockton business license. The page states no residency period or limit on owner permits. | Yes for a breaker: replacing a breaker with one of the required capacity in the same location needs no permit. A new or replacement panel, a service upgrade, a subpanel or new circuits are not on the exemption list. | Residential exemption handout (BLDG-0018, electrical item 3); Electrical Service Questionnaire (BLDG-0010); FY 2026-27 Adopted Fee Schedule effective July 1, 2026 (no electrical line) A permit issued solely for electrical service needs the Electrical Service Questionnaire for a residential service in excess of 200 amps, and service cannot be provided to substandard or unpermitted structures. The Load Calculation Worksheet (BLDG-0073) shows whether an existing service can carry added loads; the page says to ask whether your project needs it, and the EV charger checklist asks for it when the existing service is under 150 amps. Confirm the figure with the Virtual Assistant or the Permit Center. |
| Tampa, FL | Flat fee | $124.00 for a panel replacement or service upgrade, whatever the amperage: the $120 residential Service Upgrade fee (the same $120 as general electrical work) plus the 2.5% Florida Building Permit Surcharge with its $4.00 minimum. No plans are needed. | Yes, for the owner's own single-family or duplex home that the owner occupies and does not plan to sell, under Florida Statutes 489.503(6); the owner must do or directly supervise the work and cannot subcontract electrical work under the owner's own permit. | Not addressed for breakers on the page: Tampa's exempt-work list has no electrical exemption for homes, and its minor-repair rule expressly excludes alterations, replacement or relocation of electric wiring systems. | Trade Permit Fee Schedule (Service Upgrade; Electrical general); City Code 5-105.2 and 5-105.2.2; Florida Statutes 489.503(6) The fee does not depend on amperage or job price. A failed inspection costs $120 per discipline plus the surcharge ($124.00) to re-inspect, and a permit extension is $41. |
| Tucson, AZ | Flat fee ⚠ | About $169 for a panel replacement or upgrade up to 400 A: the $150 first trade item (half an hour of review and two inspections) + the 1% digital filing fee at its $18.54 minimum. Each added item, such as a new circuit, is $50, so about $219 with one circuit. Same at any amperage to 400 A. | Yes, for a home the owner occupies, on the Owner/Builder Affidavit under ARS 32-1121.A.5; rentals need a licensed contractor. | Yes, for a breaker, fuse or switch of the same type and rating in the same location; a main-breaker swap may skip the city inspection under Policy 2016-01 if every condition is met. | PDSD FY27 fee schedule (eff. 2026-07-01); PDSD Policy 2016-01 Residential electrical permits run in the same-day Express Lane; 2023 NEC as amended for applications from 2026-07-01. |
| Tulsa, OK | By amperage | $116 for a 200-amp upgrade: $98 for the first 100 amps plus $18 for each additional 100 amps or portion. A 100-amp service is $98 and a 400-amp service $152. With the $5 surcharge, the $5.50 plus 8 percent fee and the $4.50 state fee if it applies, the page puts a 200-amp upgrade at about $140. | No. Tulsa issues electrical permits to licensed contractors registered with Development Services, and the city's forms page says only a licensed tradesperson may apply for trade permits, as did its 2019 guide. State law lets an individual do electrical work on their own residence except as local ordinances require. | Not addressed on the page, which lists no breaker-swap exemption. Added circuits, outlets or fixtures are charged on the electrical equipment line, $81 for 1 to 25 items. | Title 49 Section 404.A (electrical service fee by amperage); Section 103 and Section 117 add-ons Title 49 lists an $81 electrical reconnect fee and does not say when it applies; ask your electrician whether the utility must disconnect. The $80 minimum for any permit is already exceeded by the service fee, and a failed inspection costs $75 to repeat. |
| Virginia Beach, VA | By amperage | About $76 for a 100 to 200 A upgrade with no new circuits: $65.00 change of service up to 200 amps + $1.30 levy + $10.00 technology fee. Up to 100 amps is $45.00 and up to 400 amps $105.00; a panel swap on the same 200 amp service is about $61. Circuits added or extended cost $50.00 plus $5.00 per circuit. | Yes. The city issues electrical permits to owners, who list name, address, approximate cost of materials and signature; the panel must pass the city's final inspection. An electrical contractor files with a Class A, B or C registration number and the registered master tradesman's signature. | Not addressed for a single breaker. The state exemption stops at swapping switches, 15 or 20 amp receptacles and light fixtures, and relocating or replacing a panel box needs an electrical permit. | City electrical permit list and electrical fee schedule (change of service at half the new-service fee); Application for Electrical Permit The schedule does not say whether the $50 panel item is charged in addition to a change of service; ask the permit technician. A failed inspection costs a $75 re-inspection fee, and the city releases the meter to Dominion Energy automatically after the final passes. |
| Washington, DC | Itemized | $64.90 for the Electrical Heavy-Up Instant Permit ($59 + 10%), which lets a licensed contractor upgrade one existing system to a maximum of 200 A online. Itemized instead, service and meter equipment up to 200 A is $42.90 and one panel board is $22; 201 to 400 A is $57.20. | No. Only a DC-licensed master electrician, or someone acting on the master's behalf, can apply, and DOB's Homeowner's Center states that homeowners cannot apply for trade permits. | Yes, for replacing a branch circuit breaker of the required capacity in the same location. Adding circuits, changing the panel or changing the service needs an electrical permit. | DOB supplemental permit schedule, electrical lines plus 10%; 2017 DC Building Code 105.2 electrical item 8; DOB Electrical Heavy-Up Instant Permit The minimum electrical permit fee is $22. The Heavy-Up Instant Permit does not authorize service or meter boxes in public space. DC's code ties a trade permit to a building permit unless the code official decides otherwise (105.4.3), and supplemental permits cannot be issued online for a historic or fine arts district address. |
| Wichita, KS | By amperage | $42 for a 200-amp service upgrade: $11 + (100 × $0.06) + $25 issuance. A 400-amp service is $54. Table I prices a new or changed service at 480 volts or less at $11 per meter for 100 amps or less plus $0.06 for each additional amp. | Probably not. Owner-occupants may take a permit for load-side work in a detached single-family home they own and live in after passing the $50 homeowner electrical exam, but the service entrance conductors, meter base, grounding and service panelboard go to a licensed electrical contractor. The page reads service and main-panel work as a licensed electrician's job and says to ask MABCD. | Not addressed by name. The only electrical exemptions are listed cord-and-plug temporary decorative lighting and communication wiring, and any replacement of an electrical system needs a permit. | Wichita-Sedgwick County Unified Building and Trade Code electrical article; MABCD fee Table I; 2023 NEC as amended locally Every electrical permit carries a $25 issuance fee. A panel change under a one- or two-family remodel building permit is covered, unless the work starts more than 180 days after that permit. If power has been off 6 months or longer, MABCD must inspect before the meter is reset. |
The status says what the city's fee schedule keys the electrical permit to, as the city page reads it on the date it was last verified: a tier by service amperage, one flat fee at any size, a percentage or table on the job's stated value, or itemized components (application charge, service switch, panel, meter loop, circuits). The fee column is the city's own worked example for a residential 100-to-200-amp upgrade, all city add-ons included where the page includes them, and sorts by that figure; other sizes are quoted where the city prices them. The homeowner column sorts yes, then exam or limited, then no; the breaker column sorts exempt, then conditional or not addressed, then not exempt. Prices from the electrician and the utility are never included. A flag marks a row where the city's documents disagree or a figure is superseded. Download the table as CSV.
What the comparison shows
What sets the fee: amperage in seventeen cities, a flat fee in seventeen, value in eleven, items in eight
Baltimore, Boston, Fort Worth, Fresno, Irvine, Jacksonville, New Orleans, New York, Phoenix, Portland, Riverside, San Diego, San Francisco, Seattle, Tulsa, Virginia Beach, Wichita tier the fee by service size. New York's service switch is $8 up to 100 A, $30 for 101 to 200 A and $105 for 201 to 600 A, on top of a $40 application, cable and panel items; Seattle's base is $146, $292 and $365 for its three residential tiers; Portland charges $212, $298 and $391; Jacksonville $80, $100 and $20 per extra 50 A; Baltimore $25, $30 and $40; Fort Worth $19.75, $29.17 and $39.53; San Diego $176.57 to 200 A and $353.13 for 225 to 400 A; San Francisco $450 to 225 A and $709 for 250 to 500 A; Boston $20 plus $0.25 per amp ($45 at 100 A, $70 at 200 A, $120 at 400 A); Virginia Beach $45 up to 100 A, $65 up to 200 A and $105 up to 400 A; Phoenix fixes the valuation itself at $1,750, $2,620 and $3,850 and runs Table A on it; New Orleans charges $40 plus $0.30 per amp ($70 at 100 A, $100 at 200 A, $160 at 400 A) and $3 per new circuit; Wichita $11 per meter for 100 A or less plus $0.06 per additional amp ($42 at 200 A with the $25 issuance fee); Tulsa $98 for the first 100 A plus $18 for each additional 100 A ($116 at 200 A); Riverside about $149 for a 200 A main panel ($90 plus a $41 issuance fee, plus the 14% surcharge); Irvine about $107 for a 200 A service ($68.60 plus $31.88 issuance and $6.86 automation); and Fresno about $177 to $180 for a 200 A main panel upgrade ($111.50 plus $27.08 issuance, plus General Plan and technology surcharges). Aurora, Austin, Chicago, Cincinnati, Corpus Christi, Dallas, Houston, Indianapolis, Las Vegas, Long Beach, Los Angeles, Raleigh, Sacramento, San Jose, St. Louis, Tampa, Tucson charge one fee whatever the amperage: Chicago's $75 express permit under 400 A, Dallas's $321, Houston's $127.56 meter-loop permit, Sacramento's $105 minor permit, Tucson's $150 item to 400 A, Las Vegas's $199 service change ($102 plan check plus $97 permit), San Jose's $315 hour of inspection, Cincinnati's $100, St. Louis's $85, Indianapolis's $169 by house size, Tampa's $124 (the $120 Service Upgrade fee plus the 2.5% surcharge), Raleigh's about $129 (the $124 minimum trade fee plus the 4% technology fee), Austin's $85.91 (the $73.81 stand-alone trade permit fee plus a $12.10 service application fee, by its page's reading), Aurora's $190 whatever the amperage or contract price, Corpus Christi's $146.41 minimum line (the page's reading), and Los Angeles and Long Beach, whose amperage-tiered items are flattened by a permit minimum so a 200 A and a 400 A job cost the same. Charlotte, Colorado Springs, Denver, Honolulu, Kansas City, Louisville, Miami, Orlando, Philadelphia, Pittsburgh, Stockton price on the job's stated cost: Philadelphia at $25 per $1,000 ($63 minimum), Charlotte and Kansas City on valuation tables, Miami at 0.5% with a $110 minimum, Louisville at $75 or $100 either side of $750, Pittsburgh at $6 per $1,000 with a $130 minimum that every ordinary panel job sits under, Denver on its valuation table ($35 for the first $2,000 plus $8 per additional $1,000, $59 on a $5,000 service upgrade), Orlando at $66.24 plus $11.03 per additional $1,000 ($90.95 on a $3,000 panel swap), Colorado Springs on Table C ($161.50 on a $4,000 service upgrade), Honolulu on the value of work ($78 on a $3,000 panel and meter upgrade at an instant online permit) and Stockton on its Residential Fees Fixed Table ($209 on a $2,000 panel job, the page's estimate). Albuquerque, El Paso, Milwaukee, Minneapolis, Nashville, San Antonio, St. Paul, Washington add up components: Albuquerque's $47 + $40 meter loop + $8 panel, San Antonio's $57.50 base + $3.74 + $5.58, Milwaukee's $130 service switch + $25 processing, Minneapolis's $35 service + $2 per reconnected circuit, set by the state, Nashville's itemized lines ($12 + $10 on a 200 A upgrade) raised to its $75 minimum, El Paso's $110 base plus $47 per panel ($157 for one main panel, on the page's reading) Washington's $42.90 service line plus a $22 panel board ($64.90) and St. Paul's $85 service permit plus $15 per added or changed circuit ($86 with the $1 state surcharge).
The fee runs from $42 to $450, and the expensive cities are expensive for different reasons
Eighteen cities come in under $100 for a 200 A upgrade: Wichita $42, Baltimore $57, Denver $59, Washington $64.90, Boston $70, Kansas City $70.99, Fort Worth $72.61, Chicago $75, Nashville $75, San Antonio $74.83 with surcharges, Virginia Beach $76, Honolulu $78, St. Louis $85, Austin $85.91 by its page's reading, St. Paul $86, Charlotte $87.08, Orlando $90.95 and Albuquerque $95. Twenty-seven sit between $100 and $199: Cincinnati, Jacksonville, Louisville and New Orleans at $100, Minneapolis $101, Irvine about $107, Los Angeles $107.91, Philadelphia $107.50, Tulsa $116, Tampa $124, Houston $127.56, Raleigh $129, Sacramento $134.50, Pittsburgh $141.50, Corpus Christi about $146, Riverside about $149, New York about $150, El Paso $157 by the page's reading, Milwaukee $157.08, Colorado Springs $161.50, Indianapolis and Tucson $169, San Diego $176.57, Fresno about $177, Miami about $180, Aurora $190 and Las Vegas $199. Four are in the $200s: Stockton about $209, Long Beach $215, Phoenix $219 and Portland $237.44. Four are $300 or more, each for its own reason: San Jose prices the permit as an hour of inspection time at $315; Dallas adds a $125 per-trade inspection fee and a $15 technology fee to a $181 flat alteration fee, so the permit costs $321 whether the panel is 100 or 400 A; Seattle's $292 tier for 150 to 200 A carries a $55.48 administrative fee and a 5% technology fee, $364.85; and San Francisco's DBI charges a flat $450 for service equipment up to 225 A with two inspections included. The cheapest is Wichita's amperage table, $11 per meter plus $0.06 per additional amp; next come the schedules that have not moved: Baltimore's 2024 code, Kansas City's 2016 table, Louisville's 2024 revision.
Application charges and surcharges are where the small fees grow
Thirty-eight of the 53 cities add something to the line item. Fixed charges on every permit: Austin $12.10, Houston $33.56, Fort Worth $33.08 (plus a $16.87 technology fee the page cannot confirm applies), Albuquerque $47, Cincinnati's $60 processing and certificate fee, Baltimore $25, St. Louis $25, Milwaukee $25, Wichita $25, Minneapolis $25 + $1, New York $40, Miami $40, Seattle $55.48, Long Beach $115 and San Jose $211 for a counter filing, with $41 issuance in Riverside and $31.88 in Irvine. Percentages: Riverside's 14% surcharge, Oregon's 12% state surcharge, Corpus Christi's 4.5% surcharge on starred fees, Irvine's 10% automation fee, San Antonio's two 4% surcharges, Sacramento's 10% technology surcharge, Baltimore's 5% permit tax, Seattle's 5% technology fee, Milwaukee's 1.6%, Florida's 1% and 1.5% in Miami and Jacksonville, Tampa's 2.5% Florida surcharge ($4.00 minimum), Raleigh's 4% technology fee, Tulsa's $5 system surcharge and $5.50 plus 8 percent system development fee, Fresno's General Plan surcharge and $23.79 technology surcharge, and Philadelphia's $7.50 and Pittsburgh's $11.50 in flat add-ons. Virginia Beach adds a 2% state levy and a $10 technology fee, Orlando a $2.65 technology surcharge on a $3,000 swap, Las Vegas a $2 technology fee and Washington 10% on every permit line, and El Paso adds a technology fee whose amount Schedule C does not state. The permit is not always the city's: Minneapolis sends electrical permits to the Minnesota Department of Labor and Industry (St. Paul runs its own through DSI), Cincinnati to the Inspection Bureau, Inc., a private agency, Charlotte to Mecklenburg County Code Enforcement and Colorado Springs to the Pikes Peak Regional Building Department, a regional authority; Philadelphia issues the permit but the owner pays a licensed third-party inspection agency whose rates the city does not publish. No page includes the electrician's price or the utility's reconnection charge, and every page says the utility reconnects only after the city's inspection or release.
Twenty-five cities let the homeowner pull the panel permit, fifteen do not
An owner-occupant may take out the permit and do the work in Charlotte (with a bond and the County's certificate), Jacksonville and Miami (Florida's FS 489.503(6), in person), Kansas City (single-family only, IB146 affidavit), Tampa (the same statute, for an owner-occupied single-family or duplex home the owner will not sell), Raleigh (a notarized Owner Exemption Affidavit on a home the owner will not rent, lease or sell), Long Beach, Los Angeles and San Jose (12 months of residence), Louisville (notarized certification), Minneapolis (a home with its own service), Phoenix and Tucson (ARS 32-1121.A.5), Portland (the recorded owner, not an LLC), Sacramento (by email, not online), San Diego (form DS-3042), Seattle, Virginia Beach (the owner lists name, address and cost of materials), Orlando (FS 489.503(6), the declaration signed in person), Las Vegas (an approved Contractors Board owner-builder affidavit under NRS 624.031(5), mainly single-family homes), Colorado Springs (a homeowner permit for the home you own and live in, not a rental), Fresno (the owner-builder declaration on the permit affidavit, Business and Professions Code 7044), Stockton (the Owner/Builder form), St. Paul (a homesteading owner who signs DSI's affidavit and does the wiring personally) and Corpus Christi (a homestead, with a notarized Homeowner's Work Affidavit). Thirteen cities add a test or a limit or leave it unclear: Albuquerque's written exam at 75%, Dallas's homestead exam at the field office, Denver's free homeowner electrical exam (one-family houses only), Indianapolis's electrical board approval, Wichita's $50 homeowner exam (the service entrance and panelboard go to a licensed electrical contractor), Aurora's page, which says to ask the Permit Center, Riverside's, which says to ask the counter whether a panel is an owner-builder permit type, and Irvine's very limited owner-builder exception under Bulletin 222; San Francisco allows only the owner of a stand-alone house after meeting an inspector, Fort Worth's homestead permit stops at the first main breaker, Austin's homestead permit excludes the main electric service, and Cincinnati's code and contractor chapter point different ways, so the page says ask IBI, and Nashville's page says whether a homeowner may permit their own panel work is a question for Permit Issuance. Fifteen cities issue the permit only to a licensed electrician: New York (a Licensed Master Electrician files in DOB NOW), Chicago, Houston (registered master electricians only), San Antonio, Philadelphia (the contractor's letterhead statement goes with an owner's application), Baltimore, Milwaukee (the owner exemption stops at 20 A devices), St. Louis (the homeowner permit excludes service changes), Boston (licensed contractors only; homeowners cannot apply), Pittsburgh (a city electrical trade license, and panels are not EZ work) El Paso (state-licensed contractors registered with the city), Washington (a DC-licensed master electrician; homeowners cannot apply), Honolulu (a Hawaii-licensed electrical contractor), Tulsa (licensed contractors registered with Development Services) and New Orleans (only a holder of a City of New Orleans Class A Electrical License, even for the owner's own home).
A breaker swap is free in twenty cities, and permit work in nine
Replacing a failed breaker with one of the same rating in the same slot needs no permit in Albuquerque, Austin, Cincinnati, Fort Worth, Indianapolis, Long Beach, Louisville, Philadelphia, San Jose, Seattle, Tucson, Las Vegas, Washington, Stockton and Irvine, and up to a stated size in Dallas (30 A), St. Louis (60 A), San Francisco (100 A, never the main disconnect), Phoenix (125 A, never the service disconnect) and San Diego (same size and type). Twenty-four cities are conditional or silent: Miami exempts it only when a licensed contractor does it, San Antonio calls it possibly exempt as minor repair, Charlotte, Jacksonville, Kansas City, Portland and El Paso exempt switches, receptacles or fuses but do not name breakers, Virginia Beach's state exemption stops at switches, receptacles and light fixtures, Raleigh exempts only like-for-like fixtures and devices, not panels, and Los Angeles, Minneapolis, Sacramento, Tampa, Nashville, Denver, Colorado Springs and Orlando do not address it; Wichita, Aurora, Tulsa, Riverside and Corpus Christi name no breaker exemption (Riverside's page says to ask), St. Paul's does not address a single breaker swap, and Honolulu's only repair exemption, for a licensed electrician's repairs valued at $2,500 or less in 12 months, does not reach service equipment. Nine treat it as permit work: New Orleans lists only light bulbs and fuses as exceptions, Baltimore struck the model-code exemption (Not Adopted), Chicago's exempt list stops at lamps and cord-and-plug equipment ($75 express permit), Houston's Top 10 sheet covers any repair or replacement of electrical equipment, Milwaukee exempts fuses but not breakers, Boston states no exemption and treats breaker and panel work as a licensed electrician's job, New York makes a breaker of 30 A or less a $15 minor-work permit by a Licensed Master Electrician with no inspection, Pittsburgh's exempt list does not reach it and Fresno's names nothing electrical. Tucson adds a twist: a main-breaker swap may skip the city inspection under Policy 2016-01 when every condition is met.
Where the city's documents disagree or leave a gap
Fort Worth's ordinance lists a $16.87 technology fee for all permits and the page cannot confirm it applies to a standalone trade permit, so it shows $72.61 and $89.48. Sacramento's average-cost page still prints $95 against the $105 in its fee table. St. Louis's fee page prices a new-service-only job at $100 in its note and $60 in its table. Tucson's reconnect is $135.59 on one page and a $150 trade item in the schedule. San Jose's itemized electrical table, which could set a lower figure than $315, was unreachable, and whether its $211 processing line applies online is unconfirmed. Miami's code prints the residential rate as 0.50 without a percent sign. Dallas's pages disagree on the NEC edition (2020 or 2023). Pittsburgh's permitting page puts attached houses in a commercial category with a $605 minimum. Philadelphia's electrical page lists a $100 filing fee that its processing sheet shows as $0 for auto-issued service permits. Nashville's $75 total for a 200-amp upgrade has no service release, while a job charged the $75 service release totals $150, and whether a job is charged one is Permit Issuance's call. Raleigh's guide lists stand-alone trade fees only for commercial work, so its $129 is the page's reading of the $124 minimum for unlisted permits. Austin's schedule lists no panel fee, so its $85.91 is the page's reading of the stand-alone trade permit fee plus the service application fee. New Orleans's form charges $0.30 per amp but does not say whether a like-for-like panel swap is charged on the full rating. Cincinnati's code and its contractor chapter point different ways on owner-occupants. Long Beach's fees changed on October 1, 2026 before the new schedule was posted. Virginia Beach's schedule does not say whether its $50 panel item is charged in addition to a change of service. El Paso's Schedule C also prints value-tiered electrical lines (503-508), and the page prices a panel change on the itemized lines. Orlando's schedule lists a $50 Change of Service line beside its valuation fee, and the page says to ask which applies. Stockton's schedule has no electrical line, so its $209 is the page's estimate and another plausible reading is the flat $314 Residential Minor Remodel line. Corpus Christi's $146.41 is the page's reading of a minimum line as the floor, and the schedule does not say which floor area applies to a panel change. Riverside's schedule marks only some lines with a caret for the 14% surcharge while its fee sheet applies it to all plan check and permit fees. St. Paul's DSI says the 2026 NEC is enforced from August 17, 2026 while its July 2023 handout, written to the 2023 NEC, says every panel replacement must add an exterior emergency disconnect. Aurora's Permits page says the 2026 National Electrical Code applies from 8-1-2026 while its Adopted Building Codes PDF (revised 02/2026) still shows the 2023 edition. The table flags those rows rather than resolving them.
Method
The 53 cities are the ones whose BuildPermitGuide pages have been rewritten from primary sources as of October 2026: the city's adopted electrical code and exemption list, its permit page or bulletin, its current fee schedule or ordinance and its contractor licensing rule, each fetched and quoted on the city's electrical panel permit page. The status in the table is the city page's own reading of what the schedule keys the fee to, and the fee is the city's own worked example for a residential 100-to-200-amp upgrade with the add-ons the page includes; where the page gives a range, the lower all-in figure is used for sorting and both are quoted. Nothing in this table is taken from a model code alone unless the row says so, and nothing is estimated from another city's schedule; where a city's documents disagree or a figure is superseded, the row carries a flag instead of a resolution. Each city page carries the date its sources were last verified, and the change log records when a cited document changes.
BuildPermitGuide, “How Much Is an Electrical Panel Permit? 53 Cities Compared” (2026), https://buildpermitguide.com/research/electrical-panel-permit-fees/Questions, corrections or a city you want added: contact us.
Frequently asked questions
The city pages behind this table
Each page quotes the code section, exempt-work list and fee schedule it relies on and records the date they were last verified.
- Albuquerque, NM
- Aurora, CO
- Austin, TX
- Baltimore, MD
- Boston, MA
- Charlotte, NC
- Chicago, IL
- Cincinnati, OH
- Colorado Springs, CO
- Corpus Christi, TX
- Dallas, TX
- Denver, CO
- El Paso, TX
- Fort Worth, TX
- Fresno, CA
- Honolulu, HI
- Houston, TX
- Indianapolis, IN
- Irvine, CA
- Jacksonville, FL
- Kansas City, MO
- Las Vegas, NV
- Long Beach, CA
- Los Angeles, CA
- Louisville, KY
- Miami, FL
- Milwaukee, WI
- Minneapolis, MN
- Nashville, TN
- New Orleans, LA
- New York, NY
- Orlando, FL
- Philadelphia, PA
- Phoenix, AZ
- Pittsburgh, PA
- Portland, OR
- Raleigh, NC
- Riverside, CA
- Sacramento, CA
- San Antonio, TX
- San Diego, CA
- San Francisco, CA
- San Jose, CA
- Seattle, WA
- St. Louis, MO
- St. Paul, MN
- Stockton, CA
- Tampa, FL
- Tucson, AZ
- Tulsa, OK
- Virginia Beach, VA
- Washington, DC
- Wichita, KS
Related: Permit fee calculator: 43 cities · How Much Does a Building Permit Cost? · Electrical panel permits in all 50 cities · Owner-builder permit rules compared · 2026 permit fee changes compared · Permit fee change log · Open data exports