Can a Homeowner Pull Their Own Permit? 53 Cities Compared

In 46 of the 53 largest U.S. cities we cover, a homeowner can pull the building permit for work on the home they live in; 6 allow it only for some work, and New York allows none. The trades are where cities split: 28 let an owner-occupant wire their own home, 7 only after a city exam or under limits, 13 never. Plumbing, HVAC, residency rules, affidavits and frequency caps, sourced city by city.

Published October 2026 Research

Short answer: usually yes for the building permit, and it depends on the trade and the city for everything else. Of the 53 largest U.S. cities we cover, 46 issue a building permit to a homeowner for work on the home they live in; six allow it only for some work or behind a gate (Dallas's homestead list, Philadelphia's no-trade-permit rule, San Francisco's inspector interview, Chicago's once-a-year owner-as-contractor form, Baltimore's conflicting pages, Irvine's very limited owner-builder exception); and New York issues none, because every filing goes through a licensed professional and a registered contractor. Electrical is the real divide: 28 cities let an owner-occupant wire their own home, seven (Albuquerque, Dallas, Denver, Indianapolis, St. Louis and Wichita after passing a city exam, Austin only under a Homestead Permit that excludes the main electric service), thirteen never (New York, Chicago, Houston, San Antonio, Philadelphia, Baltimore, Boston, Milwaukee, New Orleans, El Paso, Washington, Honolulu and Tulsa), and five leave it unresolved (Cincinnati and Pittsburgh publish rules that contradict each other; Nashville's, Aurora's and Riverside's pages say to ask Permit Issuance, the Permit Center or the counter). Plumbing is open to owners in 33 cities and HVAC in 31. Almost every city attaches the same three conditions in its own words: you must live there, you must do the work yourself, and the home must not be for rent or sale. We read each city's permit pages, licensing rules, owner-builder forms and the state statute behind them, as quoted on the city's project pages, and recorded the answer for each permit type.

46cities issue the building permit to a homeowner for work on their own home
28cities let an owner-occupant do their own electrical work under a permit
13cities never issue a homeowner electrical permit (plus 7 that require a city exam or allow only a limited permit)
8cities with no homeowner plumbing permit at all: New York, Philadelphia, Baltimore, Boston, New Orleans, El Paso, Washington and Honolulu

Every row links to the city page that quotes the rule, so you can read the source language yourself. The table sorts by any column.

All 53 cities

CityBuilding permit to the ownerYour own electricalYour own plumbingYour own HVACConditions the city attachesRule the city cites, and notes
Albuquerque, NM Yes After the city's written exam at 75 percent or better (UAC 111.1): four hours, one retake after 30 days, two attempts, one passing exam a year, permit issued right after you pass. Only for a home you own and occupy. After the same written exam, with the same terms. No. The permits page says installation of equipment or ductwork can only be completed by a licensed contractor, and there is no homeowner mechanical exam. Building permits go to the owner-occupant under a homeowner's permit or to a GB-2 or GB-98 general contractor: a notarized Homeowner's Affidavit, no more than one homeowner's permit to the same owner in a 12-month period, and a home rented to others must use a licensed contractor. The state rule bars a homeowner's permit for single-scope jobs such as roofing when the work is subcontracted rather than done personally or with W-2 employees. UAC 111.1 (homeowner exams); Homeowner's Affidavit; Building Safety permits page
The one-per-12-months cap on homeowner's permits is the tightest frequency limit on record.
Aurora, CO Yes Unclear. Homeowners can obtain permits for work on their primary home, but the page says to ask the Permit Center whether an owner may do their own electrical service work. Any electrician you hire needs a State of Colorado master's and contractor's license on file with the Building Division. Unclear. The pool, HVAC, bathroom and kitchen pages all say to ask the Permit Center whether an owner may do their own plumbing under the Statement of Understanding. A plumber you hire needs a State of Colorado master's and contractor's license; Aurora issues no separate license. Yes for the mechanical work: the page says a homeowner can replace their own furnace, must schedule and pass the mechanical inspection, and needs a permit for gas piping. It says to ask whether an owner may do the electrical or plumbing parts. A hired installer needs an Aurora Mechanical Systems Contractor license. Homeowners can obtain permits for work on their primary home. To act as your own contractor you sign the city's Statement of Understanding, and owners of up to three single family detached structures qualify. An owner-builder has one year from issuance to finish exterior work, and a permit expires if work does not begin within six months or is not finished within one year. Hired builders need an Aurora contractor license; a remodeling or swimming pool license requires 3 years of documented experience. City Statement of Understanding; Do It Right home improvement handbook (March 2019) and Building Division permit chart
The handbook says most remodels can be performed by the owner of the home without hiring a contractor. Aurora does not license electricians or plumbers itself.
Austin, TX Yes Limited: only under the Homestead Permit, which excludes the main electric service, so a main-panel swap likely falls outside it. Otherwise a Texas-licensed electrician registered with the city pulls the permit. Yes, under the Homestead Permit: a homestead exemption with the county appraisal district, your own principal residence, work done yourself, and no homestead permit on another residence in the prior 12 months. No for a central AC or heat pump: the Homestead Permit excludes reclaiming and charging a ducted system containing refrigerant, and Texas requires an ACR contractor license. Other mechanical work may qualify on the same terms. Texas has no state general contractor license, and Austin lets a homeowner register with Building and Trade Contractor Services as the contractor for their own property. The $82.56 general contractor registration fee does not apply to people building on their own homestead. Homestead Permit Qualification Guide; Building and Trade Contractor Services registration; Texas Occupations Code 1302.251 and 1305.151
Stand-alone trade permits go only to licensed contractors registered with the city or to qualified homestead owners. The page tells readers to confirm with Building and Trade Contractor Services before planning to do a main-panel swap themselves.
Baltimore, MD Some work ⚠ No. Electrical permits issue only to master, master restricted, restricted or maintenance electricians licensed in the city (BFRCBC 2706.2). No. Plumbing permits issue only to licensed master plumbers or master gas fitters; state law lets you plumb your own residence but not make the final public connection, and the city still issues the permit only to a master plumber. No. There is no homeowner mechanical permit in the city code. The building code lets the owner or lessee, their agent, or a licensed engineer or architect apply for a building permit, but DHCD's permits page says construction work on one- and two-family dwellings requires a Maryland Home Improvement Commission licensed contractor. The page says confirm with the Permits Office how DHCD lists owner-built work. BFRCBC 105 (who may apply) and 2706.2; DHCD permits page
No homeowner trade permit of any kind exists in the city code.
Boston, MA Yes ⚠ No. ISD's electrical permit is for licensed contractors only and the applicant must be the electrician performing the work; homeowners cannot apply. No. Only a contractor with a valid Massachusetts trade license can apply for the plumbing permit and do the work, so even a like-for-like toilet swap goes to a licensed plumber. No. The gas, plumbing, electrical and sheet metal permits for HVAC work are each licensed-contractor only; homeowners cannot apply. Homeowners of an owner-occupied one- or two-family home may file the short or long form building permit and are exempt from the construction supervisor license if they supervise anyone they hire. In a building with three or more homes, work such as a roof must be filed by a contractor. ISD recommends a licensed contractor with Home Improvement Contractor registration apply for all permits, and an owner who pulls the permit is outside the HIC arbitration program and Guaranty Fund, which can pay up to $25,000. ISD homeowner and contractor guidance; ISD gas, plumbing, electrical and sheet metal permit pages; Massachusetts chapters 141 and 142 (licensed electricians, plumbers and gas fitters)
A contractor working on an existing owner-occupied home of one to four units must be registered as a Home Improvement Contractor. Homeowners of a single-family home may be exempt from hiring a general contractor for an ADU if they supervise the work and file a Homeowner Exemption Form.
Charlotte, NC Yes Yes, under G.S. 87-43.1: the owner on the tax records, living in the home, not renting or selling within a year, doing the work personally, with a County homeowner account, a bond and the Homeowner Trade Work Certificate of Ownership. Yes, for an owner who owns, occupies and personally does the work, with the Homeowner Trade Work Certificate. Yes, for an owner-occupant doing all the work personally on a primary residence. Mecklenburg County issues homeowner permits to owners whose name is on the deed for their primary residence, through the AccelaMeck homeowner portal; projects under $40,000 need no bond. Owner-occupants doing the work personally pay $60 per trade plus $45 per inspection trip instead of the valuation table. A homeowner permit cannot be issued for someone else to do the work. G.S. 87-43.1 and 160D-1110; LUESA homeowner trade rules; County homeowner fee schedule
A North Carolina general contractor license is required only when the contracted work costs $40,000 or more. The County urges a licensed contractor for anything involving service equipment, and a licensed electrician's like-kind swap is exempt where a homeowner's is not.
Chicago, IL Some work No. A Chicago-licensed electrical contractor must do all electrical work that needs a permit, with no owner-occupant exception. Yes, for the owner, occupant or lessee of a detached single-family house doing the work personally (listed on the permit as the homeowner, Form 401). Not stated as a homeowner permit; in-kind swaps at homes up to 4 stories need no permit, and for permitted work the owner may act as general contractor once a year. Every permit lists a licensed general contractor; on your own primary residence (up to 6 units, up to 3 stories) you may act as general contractor yourself once per calendar year by uploading Form 401 and an ID showing you live there. That does not replace the licensed roofer or electrician the work still needs. DOB Form 401 (owner as general contractor); DOB electrical license page; Chicago Plumbing Code owner exception
Chicago's split is the sharpest on record: plumbing has an owner-occupant exception, electrical has none, and the once-a-year owner-as-contractor rule governs the building permit.
Cincinnati, OH Yes ⚠ Unclear. The city requires an OCILB-licensed electrical contractor for permit work, but its contractor chapter exempts an owner of a one- to three-family home who will occupy it for a year from registering to do work personally, and IBI (the electrical permit issuer) says its counter serves do it yourselfers; the page says ask IBI first. Yes, in a single-family home only (Cincinnati Building Code 1105-13): the owner who will live there a year buys the materials, does all the labor and pulls the permit with a notarized affidavit; two- and three-family owners hire a licensed plumber. Unclear: the same homeowner exception applies to registration, but the HVAC handout does not say whether the department issues a mechanical permit to an owner; ask the Permit Center. An owner-occupant of a one- to three-family home may pull the building permit and do the work personally if they will live there for at least a year after completion, signing a notarized statement. Hired contractors need the $131.25 city registration; electrical, plumbing and HVAC contractors must be OCILB-licensed and registered. Cincinnati Building Code 1105-13, 1106-5 and 1106-37; IBI counter guidance
Electrical permits are issued by Inspection Bureau, Inc., not the city, which is part of why the owner electrical answer is open.
Colorado Springs, CO Yes ⚠ Yes, for a primary residence you own and live in, under a homeowner permit; you are expected to know the code and pass every inspection. Colorado law bars anyone other than the homeowner or a registered electrical contractor from installing electrical work in your home. Yes, in the home you own and live in, for work you do yourself; otherwise only a registered plumbing contractor may install plumbing, and that contractor pulls the permit. Yes, for the primary residence you own and live in when you do the work yourself. A hired installer needs a PPRBD mechanical contractor license; the electrical connection is electrical work done by the homeowner or a registered electrical contractor. PPRBD lets a homeowner pull permits only for a primary residence they own and reside in, for trades they perform themselves. No homeowner permit for a rental, and it is illegal to pull one for a contractor you hired. Renters cannot pull homeowner permits. Contractors need a PPRBD license: Building Contractor E covers sheds, decks and fences, D covers roofing and pools. PPRBD Homeowner Permit page; PPRBD contractor licensing; Colorado electrical and plumbing contractor registration
Starting work without a required permit triggers an investigation fee equal to twice the permit fee. PPRBD, a regional authority, issues the permits for the city and unincorporated El Paso County.
Corpus Christi, TX Yes Yes, on a homestead: the owner may pull the electrical permit by signing a notarized Homeowner's Work Affidavit, and only the resident owner may do the work. Otherwise a Texas-licensed electrical contractor registered with the city. Yes, on a homestead with the same notarized affidavit; Texas law does not require a plumbing license for plumbing in your own homestead. Gas service work must be permitted and installed by a state-licensed plumber unless the owner is a licensed master plumber. Yes, on a homestead: State law exempts AC work on your own home from licensing, and the city issues a homeowner mechanical permit with the affidavit. A new gas furnace connection needs a state-licensed plumber. The city's residential code lets it issue permits to owners of a single-family home they own and occupy as their homestead, and the application has a signature line for an owner who is the builder. The notarized Homeowner's Work Affidavit lets only the resident owner do the work. A roofing permit may name the homeowner as the permit holder. Homeowner's Work Affidavit and homestead rules as stated on the ten project pages; the city's residential code
Hired mechanical contractors register with the city with a copy of their state master license, a certificate of liability and a $135.00 annual registration fee. The ADU page adds that the property owner must live in the main house or the ADU.
Dallas, TX Some work ⚠ After the city's homeowner exam, on a homestead; the permit is witnessed by the district electrical inspector and issued at the field office. Yes, in your own homestead (Texas Occupations Code 1301.051), with the homestead exemption recorded by the appraisal district. Yes, on a homestead recorded by the appraisal district (Texas Occupations Code 1302.053). The homeowner exemption form covers interior remodeling, fences, roofing, patio covers and portable accessory buildings on a homestead, with an affidavit that nobody else is paid to do any part of the work. It does not allow a new home, an addition, a permanent detached accessory building (a permanent shed, an ADU) or a swimming pool; decks are not mentioned. Dallas homeowner exemption form; electrical, plumbing and mechanical no-license checklists
The building side is the limited one here: pools and permanent accessory buildings always go to a contractor registered with the city, even on a homestead.
Denver, CO Yes ⚠ After an exam: an owner-occupant of a one-family house who passes Denver's free homeowner electrical exam (a state license can substitute) does the work and applies for the quick permit by email, not in E-permits. Duplexes, townhouses and condos do not qualify. After an exam: an owner-occupant of a one-family house who passes Denver's free, open-book, untimed homeowner plumbing exam applies for quick permits by email. After an exam: an owner-occupant of a one-family house who passes Denver's free homeowner mechanical or HVAC exam applies for the quick permit by email. Duplex, townhouse and condo owners must use a licensed contractor. Own and live in a one-family house; the homeowner permit covers the house and its accessory structures, with no exam for general construction. Apply in E-permits, then email the Admin 131.4 forms and photo ID to plan review; only quick permits are applied for by email alone. Do the work yourself unless approved to act as your own general contractor, and occupy the house at least 12 months after the work. Duplexes, townhouses, condos and ADUs do not qualify. Denver Admin 131.4 homeowner permit; Denver plumbing, electrical and mechanical homeowner exams; Denver contractor licensing rules
Roofing needs no homeowner exam but is applied for by email. Pool installers hold a Class D swimming pools and spas license.
El Paso, TX Yes No. Electrical permits go only to contractors licensed by the state and registered with the city, under a Texas master electrician; the homeowner affidavit says a homeowner may not obtain electrical permits unless licensed and registered. A homeowner may add fans, light fixtures or outlets onto an existing circuit with capacity on their primary residence without a permit. No. Plumbing permits go only to contractors licensed by the state and registered with the city, under a master plumber; a homeowner may not obtain plumbing permits unless appropriately licensed. No. Mechanical permits go only to contractors licensed by the state (TDLR) and registered with the city; a homeowner may not obtain mechanical permits unless appropriately licensed. The building permit goes to an owner-occupant of an R-3 home, as a homestead permit, who acts as his own general contractor and performs some or all of the building work, with proof of ownership from the El Paso Central Appraisal District or a deed and a notarized homeowner affidavit. The affidavit adds an insurance certificate for a new single-family dwelling; the ADU page says to ask whether that applies to an ADU. Homeowner affidavit and homestead permit rules as stated on the ten project pages; City Code 18.10.040; city permit handout
The owner pulls only the building permit; electrical, plumbing, mechanical and gas permits stay with registered contractors. Roofing contractors pay a $100 annual city registration fee; electrical and mechanical contractors pay no annual fee.
Fort Worth, TX Yes Yes, except the electrical service and main breaker: a homestead permit covers wiring downstream of the first main breaker (a subpanel, new circuits); a main panel or service change needs a Texas-licensed electrician. Yes, under a homestead permit at a house you own and occupy as your primary residence. Yes, under a homestead mechanical permit at your primary residence. Fort Worth issues homestead permits to owner-occupants, shown by an appraisal-district homestead exemption or by proof of ownership and government ID at the same address, covering building, plumbing, mechanical and electrical work without a Texas trade license. Otherwise a building contractor registered with the city ($178 a year) applies. Fort Worth homestead permit rules; Development Services contractor registration
In the contractor lookup, homestead applicants enter Homestead. Pool plans also need an Oncor Electric stamp before submittal.
Fresno, CA Yes Yes: the electrical panel steps have the Permit Affidavit Form carry the license or owner-builder declaration; the city's permit affidavit cites Business and Professions Code 7044. Not stated separately for plumbing: the bathroom and kitchen pages have a trade permit filed with a Permit Affidavit Form listing the fixtures, and the owner-builder paragraph covers any structure, but no plumbing-specific owner rule is given. Yes: the HVAC steps have the Permit Affidavit Form carry the license or owner-builder declaration, with the same Business and Professions Code 7044 conditions. Do the work yourself or with your own employees and do not offer the structure for sale within a year of completion; for home improvements the site must be your principal residence, occupied for 12 months before the work is finished; the exemption cannot be used on more than two structures in any three-year period. You take full responsibility for the job, and anyone who contracts for or bids on a project valued at $500 or more (labor and materials) must be licensed by the Contractors State License Board. City permit affidavit (Business and Professions Code 7044); owner-builder checklist the city posts; Contractors State License Board licensing rule
The same paragraph appears on all ten Fresno project pages. A hired contractor on a job of $500 or more must hold a CSLB license; the pages do not say whether the 12-month residence rule also applies to a trade permit pulled in the owner's name.
Honolulu, HI Yes No. DPP's FAQ says all electrical and plumbing work must be performed by contractors licensed by the State of Hawaii under HRS Chapters 444 and 448E, and the owner-builder exemption in HRS 444-2.5 excludes electrical work unless the owner holds the license. No. The same FAQ bars an owner from doing their own plumbing, and it names spas and swimming pools among the piping a licensed plumbing contractor must install. Unclear. The electrical connection must be made by a Hawaii-licensed electrical contractor and the exemption excludes electrical and plumbing work; the page does not say whether an owner may install the mechanical part of a split system. The exemption is for work on your own home for your own use, and you register for it first. If you sell or lease within one year of completion, the law presumes the work was for sale or lease, unless the permit's valuation was under $10,000, so most rental ADUs need a licensed contractor. An apartment unit cannot be built as an owner-builder, and DPP says a general contractor is typically required when more than 2 specialty contractors are involved. Owners can do tile, carpentry, decks, sheds and fences. HRS 444-2.5 (owner-builder exemption); DPP FAQ on HRS Chapters 444 and 448E; HNL Build contractor license check
HNL Build checks the contractor's license classification against the work and rejects an application whose contractor lacks it. The pages state no frequency cap, helper rule or affidavit.
Houston, TX Yes ⚠ No. Electrical permits go only to master electricians licensed by TDLR and registered with the city; there is no homeowner electrical permit. Yes, under the Homeowner's Plumbing Permit ($86.39 + admin, $116.11) if you own, occupy and have homesteaded the property and do the work yourself. Unclear: Residential Permitting 101 says a homeowner may obtain the mechanical permit in some instances, without listing them; confirm with the Mechanical Section. Houston licenses no general contractors, so the building permit may be bought by the owner, an agent or a contractor; the Declaration in Support of Application is signed by the property owner and checked against appraisal-district records. Plumbing needs the homestead on record. HPC Residential Permitting 101; HPC Homeowner's Plumbing Permit; HPC Circuit Panel and Meter Loop pages
Texas exempts homeowners from the state electrician license on their own residence, but Houston's permit rules give homeowners no electrical permit, so a registered master electrician is the only path.
Indianapolis, IN Yes After the homeowner exam: an owner who also occupies the one- or two-family home may do the work with the electrical permit and the licensing board's written approval of their skill (Sec. 875-222). Rentals do not qualify. Limited. Plumbing permits go to a state-licensed plumber registered with the city; DBNS allows homeowner plumbing permits only in limited situations, decided by email on the project details. After the homeowner exam: owner-occupant of a one- or two-family home with the heating and cooling permit and the board's written approval (Sec. 875-321). Any individual who owns the parcel may obtain the structural permit for work done personally or by their own employees, filing a Statement of Intent; a hired builder must be a listed Marion County contractor and pull it under their own listing. The trade exams are only for owners who also occupy the home. Sec. 536-201 and the DBNS Homeowner's Guide; Sec. 875-222 and 875-321
The structural permit is open to any owner, occupant or not; the roof-replacement exemption, by contrast, covers only owner-occupants and listed contractors.
Irvine, CA Some work Yes, as an owner-builder per the page's panel answer, under Bulletin 222's very limited exception; PermitsDIRECT! accepts homeowner applications. A hired contractor shows a City of Irvine business license, CSLB pocket card and workers' compensation certificate. Unclear: Bulletin 222 names water heaters among equipment permitted to a state-licensed contractor with the owner-builder exception, and the pages give no separate plumbing rule. Yes, for eligible change-outs: the owner-builder exception is very limited, the owner completes the city's Property Owner's Package and takes full responsibility, and PermitsDIRECT! accepts homeowner applications. Bulletin 222 says work on homes, pools and equipment such as water heaters and HVAC is permitted to a state-licensed contractor, with one very limited exception: an owner-builder, who signs the Property Owner's Package. Hiring unlicensed help on a job of $500 or more can make the owner an employer under state law. In a condo, work in or affecting a common area needs the HOA board's written permission and may only be permitted to a licensed contractor. Informational Bulletin 222; the city's Property Owner's Package; PermitsDIRECT! homeowner applications
The pages state no residency period or frequency cap. The shed, electrical-panel and condo kitchen answers say an owner may pull a permit as owner-builder, while Bulletin 222 calls the exception very limited.
Jacksonville, FL Yes Yes. FS 489.503(6) lets you act as your own electrical contractor on a single-family or duplex home for your own use; Jacksonville adds deed, in-person application and homestead proof. Under the owner-builder permit for your primary residence; hired plumbers pull their own permit tied to yours. Yes, as owner-builder; an electric replacement at a single-family home costing $5,000 or less can also skip inspection on a notarized owner request. Owner-builder on your primary residence if you are on the deed and the home is not for sale or rent: apply in person, sign the owner's affidavit (BID staff notarize the Property Owner-Builder Disclosure Statement) and provide proof of homestead exemption. You supervise any unlicensed helpers yourself; a hired roofer or trade pulls a separate permit tied to yours. Florida Statutes 489.103(7) and 489.503(6); BID owner-builder rules; Ordinance Code 320.408(f)(8)
Repairs or alterations to an existing pool are the one job the pages say must be contracted to a licensed pool contractor even by an owner.
Kansas City, MO Yes Yes, for an owner who lives in a single-family home, does the work personally with family or friends and buys the materials, filing the IB146 affidavit; two-family homes and anyone hiring help must use a licensed contractor. Yes, on the same IB146 terms in an owner-occupied single-family home. Yes, on the same terms; anyone hired must be a city-licensed mechanical contractor who pulls their own permit. An owner who lives in a single-family home may pull the building and trade permits and act as general contractor, doing the work with family or friends (IB146 affidavit, uploaded in CompassKC). On a two-family home trade permits go only to licensed contractors. An owner-occupant who pulls a building permit may still hire subcontractors to work under it. KC Code 18-14(k); Information Bulletin 146
Kansas City is one of the few cities whose rule expressly lets unpaid family and friends help under a homeowner permit.
Las Vegas, NV Yes Yes, on the owner's own primary residence under NRS 624.031(5) with an approved Nevada State Contractors Board owner-builder affidavit; the homeowner guide says only licensed electricians, along with homeowners working on their own homes, may do electrical work in Nevada. Yes, on the owner's own primary residence with the same affidavit; the homeowner guide says only licensed plumbers and electricians, along with homeowners working on their own homes, may do plumbing or electrical work in Nevada. Yes, for the owner's primary residence under the owner-builder exemption with an approved affidavit. Because HVAC is work a heating or air-conditioning contractor performs, the NRS 624.031(6) small-repair exemption does not apply, so anyone you pay must hold the right Nevada license. Complete the Contractors Board owner-builder affidavit, have it approved and submit it with the permit application. The city says the exemption applies mainly to single-family homes, not condominiums or apartments, and covers a structure for your own occupancy, not for sale or lease. A contractor needs a Nevada license and a city business license. On a pool, gas, potable water and electrical work must be done and signed by the properly licensed subcontractor, and any contractor must still pull the permits for that work. NRS 624.031(5) and (6); Nevada State Contractors Board owner-builder affidavit; homeowner guide; Pool Guideline (NRS 624.900 to 624.930)
You choose Residential Owner Builder or Building Contractor when you start the online application. Starting work without a permit costs at least double the permit fee on a first offense, plus an investigation fee when an inspector has to visit.
Long Beach, CA Yes Yes, for a one- or two-family home that is your principal residence, lived in for 12 months, with the homeowner exemption used no more than twice in three years (IB-029); the city adds no restriction specific to electrical. Yes, under IB-029 on the same terms. Yes, at an in-person express permit appointment under IB-029; online mechanical permits are for registered contractors only. A homeowner may pull the permit for a one- or two-family home that is their principal residence under IB-029: 12 months of residence and the exemption used no more than twice in three years, signing the Owner-Builder Declaration (FORM-005). Otherwise the permit goes to a CSLB-licensed contractor with an active Long Beach business license and workers' compensation coverage. IB-029 (owner-builder); FORM-005 Owner-Builder Declaration
An unlicensed person, including the homeowner, may draw the plans for a one-story wood-frame accessory structure that follows IB-010.
Los Angeles, CA Yes Yes, after 12 months of residence in the house (LADBS FAQ and the state owner-builder declaration). Yes, after 12 months of residence; otherwise a CSLB-licensed plumber. Yes, after 12 months of residence; otherwise a C-20 contractor. Read and initial the state Owner-Builder Declaration at issuance; trade permits in your own name only after 12 months living there; two structures in any three-year period; work done before any sale. You become the employer of anyone unlicensed you hire; handyman jobs are limited to under $1,000 and no permit. LADBS owner-builder FAQ and e-permit rules; Business and Professions Code 7044
Homeowners may apply for every single-family e-permit type: building, mechanical, electrical and plumbing. Hired contractors need a CSLB B license for building and C-10/C-20/C-36 licenses for the trades.
Louisville, KY Yes ⚠ Yes, in a home you own and live in (or will when the work is done): KRS 227.480 exempts a homeowner working on their own premises, and Metro's application carries a notarized Homeowner Electrical Permit Certification that the home is not for sale and you do all the work yourself. Yes: the state (not Metro) issues a homeowner plumbing permit for a home the owner occupies when the owner files an affidavit and personally performs all the work. Kentucky's HVAC licensing law exempts an individual owner working on property they own and occupy; the page says ask Construction Review how an owner files. Construction Review takes contractor permits in the Louisville Metro Business Portal; for an owner-filed building permit the pages say to call (502) 574-3321, because the department's own guides could not be retrieved (louisvilleky.gov blocks every datacenter client). The trade routes are state law and are firm. KRS 227.480(2)(a); 815 KAR 20:050 (state homeowner plumbing permit); Metro electrical application
Plumbing permits are the state's, not Metro's, so the homeowner plumbing permit comes from the Division of Plumbing.
Miami, FL Yes Yes. FS 489.503(6) lets the owner of a single-family or duplex home they occupy and do not intend to sell act as their own electrical contractor; City Code 10-5 recognizes it. Under the owner-builder permit (FS 489.103(7)); the no-permit fixture exemptions are written for licensed plumbers, not owners. Under the owner-builder permit (FS 489.103(7)); a hired installer needs a Class A or B license with a county certificate of competency. Owner-builder under FS 489.103(7) for a one- or two-family home you occupy and are not building to sell or lease; you appear in person to sign each application and supervise the work. Selling or leasing within a year of completion is presumed a violation. Work started before the permit costs double the fee plus $110 on a homestead property. Florida Statutes 489.103(7) and 489.503(6); City Code 10-5
Hired contractors need a Florida license or a Miami-Dade County certificate of competency inside the city.
Milwaukee, WI Yes No, beyond swapping an existing switch, receptacle or light fixture rated 20 amps or less (MCO 222-1); panel, circuit and pool wiring is a state-licensed electrical contractor's. Yes, with a permit, for the owner of a one-family home they live in (MCO 225-3-2); in a duplex or a rental a licensed plumber pulls it. Yes: DNS lets owners who live in the home pull permits for their own work; like-for-like non-gas appliance swaps need no permit. An owner who lives in the home may take out the building permit and do the work, and the state exempts owner-occupants from Dwelling Contractor credentials. Hired contractors need the City Home Improvement Contractor License plus state Dwelling Contractor credentials. Wisconsin lets owner-occupants wire their own homes unless a local ordinance requires a license, and Milwaukee's does. MCO 222-1, 225-3-2 and 200-24-1.5; DNS homeowner page
DNS will not issue a new pool permit until the contractor's electrical permit is in place.
Minneapolis, MN Yes Yes, via a state (DLI) homeowner permit for a home you own and occupy that has its own electrical service not shared with another dwelling; not two-family dwellings, condos or any property occupied by others. Yes, for the owner of a single-family home that does not share electric, gas, water or sewer service with another dwelling (Section 85.80); no gas work on heating equipment. Yes under Section 85.80, but owners may not work on gas-fired heating equipment, and all gas piping and venting is a licensed gas installer's separate permit. Owner-occupants of one- to four-unit dwellings can get building permits for their own construction work; Minnesota's contractor licensing law exempts owners improving a home they occupy, unless building for resale or improving more than one property within 24 months. The city issues no electrical permits at all; DLI does. MCO 85.80 and 91.300; Minn. Stat. 326B.37 (DLI homeowner permit)
The trade exceptions hinge on separate utility services: a duplex or a shared-service home sends every trade permit to a licensed contractor.
Nashville, TN Yes Unclear. Licensed contractors file electrical permits online in ePermits; anyone who is not a licensed contractor applies for a trade permit at the department, and the page says whether a homeowner may permit their own panel work is a question for Permit Issuance. Unclear. Trade permits are normally pulled by licensed subcontractors after the building permit is issued; anyone who is not a licensed contractor applies in person at the department, and the page says to ask Permit Issuance about your situation. Unclear. Licensed contractors file online; anyone who is not a licensed contractor applies at the department, and the page says to ask Permit Issuance whether a homeowner gas/mechanical permit is available. Building permit: an owner who lives in the house can pull a self permit with a notarized Affidavit of Exemption and Self Permit Affidavit. An owner whose title is in an LLC or trust, or who is building at a rental, can self-permit only work under $25,000. Homeowners apply through the Zoning Help Desk; only registered contractors apply online in ePermits. A new DADU or a garage conversion into one takes a contractor, not a self permit. Metro Zoning Help Desk residential permit application; Affidavit of Exemption and Self Permit Affidavit; Metro DADU instructions
Once a DADU is permitted, the homeowner can pull permits for renovation work under $25,000; the DADU page says up to $25,000, so the two differ at exactly $25,000. Tennessee also requires a state contractor's license when the electrical portion of a project is $25,000 or more.
New Orleans, LA Yes ⚠ No. The city issues the electrical permit only to an electrical contractor holding a Class A Electrical License from the City of New Orleans; the owner-builder exemption that lets you pull your own building permit does not reach electrical work. No. Plumbing permits come from the Sewerage and Water Board, and only an Orleans Parish licensed master plumber may apply for one. No. Only a contractor with a Class A City of New Orleans Mechanical A/C license can apply for the HVAC permit, and homeowners cannot pull it even for their own house; gas work is filed under a Gasfitting permit by the licensed gas fitter or plumber the city requires. An owner-occupant may file the building permit for the personal residence with the notarized State Exemption Form R-1364 and the Affidavit Claiming Exemption from Licensure. The affidavit requires you to keep the house as your primary residence and bars a permit for another residence within a year, and the exemption does not cover property for sale or rent. A hired contractor needs a Louisiana license, which starts at $7,500 for home improvement and $50,000 for a new residential structure; electrical contractor work starts at $10,000. State Exemption Form R-1364 and Affidavit Claiming Exemption from Licensure; Class A electrical and mechanical license rules; Louisiana contractor licensing thresholds
Owner filing is stated on the shed, deck, bathroom, kitchen and ADU pages. The page says the city's reroofing pages do not describe owner filing, and that its pool pages do not say whether an owner-occupant may file the pool permit, so both are questions for Safety and Permits.
New York, NY No No. Every electrical installation is done under a permit by a NYC Licensed Master Electrician; there is no homeowner exemption. No. Plumbing is a Licensed Master Plumber's job with its own DOB permit. No. Work is filed by a PE or RA and the permit goes to a Registered General Contractor. DIY is allowed only on exempt work: a shed up to 120 sq ft, a fence 6 ft or under, non-structural roof repair. Anything filed goes through a PE or RA in DOB NOW and a registered contractor (HIC license at 1–4 family homes). DOB Electrical System owner requirements; DOB homeowner page; 1 RCNY 101-14
The city's own homeowner page lists what needs no permit and says homeowners may do that work themselves; it offers no owner-builder route for permitted work.
Orlando, FL Yes Yes. Florida Statutes 489.503(6) lets an owner do the electrical work on a single-family or duplex home for his or her own use and occupancy, not intended for sale; the owner signs the Owner/Builder Declaration in person. Yes. Owners may act as their own plumbing contractor on their own home but must sign the Owner/Builder Declaration in person; a plumbing permit that is not part of a building permit needs the owner's notarized signature. Yes. An owner-builder on his or her own one- or two-family home under Florida Statutes 489.103(7) signs the Owner/Builder Declaration in person, and the Mechanical Inspection Affidavit can be signed by an owner-builder. For your own home, not built for sale or lease: you sign the city's Owner/Builder Declaration in person at Permitting Services, supervise the work yourself and pass the city's inspections. A residence you built or improved yourself and sell or lease within 1 year is presumed to have been built for sale. The pool checklist tells you to work with a licensed contractor and does not describe an owner-builder pool permit. Florida Statutes 489.103(7) and 489.503(6); the city's Owner/Builder Declaration
Contractors give the city a State of Florida contractor's license, a business tax receipt and proof of workers' compensation insurance. An address outside the city limits is permitted by Orange County's Division of Building Safety, not the city.
Philadelphia, PA Some work No. A licensed electrical contractor must perform all electrical work, and the owner hires a licensed electrical inspection agency. No. A licensed master plumber must oversee plumbing, and the EZ standards call for a Philadelphia licensed plumbing contractor. No. A licensed contractor must perform all mechanical work; sheet metal by a registered technician. At an existing one- or two-family home an owner who lives in the building may hold the building permit only for work that needs no electrical or plumbing permit: a fence, a deck, a reroof, a pool shell. That rules out an owner-built kitchen, bathroom or ADU. The other permit holders are a licensed Philadelphia contractor or a registered PA Home Improvement Contractor with a Commercial Activity License. L&I contractor rules for existing 1–2 family homes; L&I Start Right guide; EZ permit standards
Plumbing and electrical are never homeowner permits in Philadelphia, even at an owner-occupied home.
Phoenix, AZ Yes Yes. The city's journeyman requirement covers plumbing and mechanical, not electrical; an owner-occupant works under ARS 32-1121.A.5. Yes, for the owner-occupant of a single-family home working on their own house (2024 code); otherwise a licensed journeyman or contractor. Yes, for the owner-occupant of a single-family home; gas connections are never covered by the state's unlicensed small-job exemption. The residential application has a checkbox for the ARS 32-1121.A.5 exemption (improving property intended solely for the owner's occupancy). Selling or renting within a year of completion is treated as evidence the work was done for sale, so a unit built to rent should be built by an ROC-licensed contractor. ARS 32-1121.A.5; 2024 Phoenix Building Construction Code (who may perform permitted plumbing and mechanical work)
Skipping a required permit costs an investigation fee of at least $250 plus a doubled permit fee, owner-builder or not.
Pittsburgh, PA Yes ⚠ Unclear. PLI's licensing rules require a city electrical trade license for any work needing an electrical permit, while its EZ page says residential EZ work may be done by a homeowner at a primary residence; a panel is not EZ work, so the page says confirm with PLI. Yes: ACHD's 2025 Article XV lets a bona fide owner presently occupying an existing single-family building do the plumbing; landlords must hire a master plumber. Unclear: an HVAC and mechanical trade license is required to install or replace any mechanical system, but the EZ page lists homeowners at a primary residence among those who may do residential EZ work; confirm before buying equipment. PLI lets the homeowner do the building work on a primary residence (the deck application has a box for the owner self-performing), or a licensed City of Pittsburgh contractor or registered Pennsylvania Home Improvement Contractor; renovations at rental or investment one- and two-family homes need a contractor. Homeowner applications are checked against Allegheny County real estate records. PLI licensing rules; PLI EZ permits page; ACHD Article XV (2025)
Plumbing is Allegheny County Health Department's, not the city's, which is why it has the clearest owner rule of the three trades.
Portland, OR Yes Yes, only if you own and live in the home as the recorded owner (not an LLC) and are not selling or renting within six months; never on a rental or an ADU (ORS 479.540). Yes, for the recorded homeowner, not an LLC. Yes, for the recorded homeowner, not an LLC. A homeowner may sign the building, plumbing and mechanical applications and do that work. The electrical rule is the strict one: owner-occupied, recorded owner, no sale or rental within six months, and PP&D says you cannot do the electrical work yourself for an ADU. Hired contractors list an Oregon CCB license. PP&D who-can-do-the-work pages; ORS 479.540
The recorded owner, not an LLC, test applies to every homeowner trade permit, so a home held in an LLC cannot use the homeowner option at all.
Raleigh, NC Yes Yes: on a home you own and do not intend to rent, lease or sell, a homeowner without a trade license files the notarized Owner Exemption Affidavit and applies by email, then passes the city inspection. Yes: the bathroom and kitchen pages say Raleigh accepts trade permit applications from homeowners without a trade license when they file the Owner Exemption Affidavit; the page tells readers to ask whether a gas-line job needs a trade permit. Yes: a homeowner without a license may apply for the HVAC trade permit on their own home with the affidavit, by email, and must pass the city inspection. The notarized Owner Exemption Affidavit commits the owner to occupy the home for twelve months after completion without offering it for rent, lease or sale. Owner-built ADUs cannot be rented, and a Not For Rent statement is signed before the permit issues. A licensed North Carolina general contractor is required for any undertaking of $40,000 or more unless the owner exemption applies. Working without a required permit adds an administrative fee equal to the permit fee. Raleigh Owner Exemption Affidavit; G.S. 160D-1110; G.S. 87-1
Homeowner trade-permit applications go to the city by email rather than through the portal. Contractors must be registered and entered in the Permit and Development Portal. The pages state no frequency cap or helper rule.
Riverside, CA Yes Unclear: the page says Riverside lets owners pull many permit types as owner-builders and to ask the counter whether a panel permit is one. A hired electrician needs a CSLB license and a City of Riverside business license. Unclear: the page says to ask the counter whether plumbing is included in an owner-builder permit. Unclear: the owner as owner-builder where the counter allows it for the permit type, after signing the Property Owner Package. Initial twelve statements in the city's Property Owner Package and sign it at the counter, or before a notary if you cannot come to City Hall; you take legal and financial responsibility for the work. If you hire anyone other than licensed contractors on a job worth at least $500 in labor and materials, you may be treated as an employer. A contractor needs a CSLB license and a City of Riverside business license. City permit pages: issued to the property owner or an authorized agent, or to a licensed contractor; Property Owner Package
The pages state no residency period or frequency cap, and the shed page answers yes when asked whether you can pull the permit yourself.
Sacramento, CA Yes Yes, as owner-builder, but not online: email the building permit application, the owner-builder form CDD-0220 and the Planning Express form to EZ Permit. Under the owner-builder forms; water heater change-outs are among the permits homeowners can pull online. Yes: homeowners can pull a residential HVAC change-out permit online for a single-family home or duplex. Property owners can be the permit holder after signing the owner-builder verification form CDD-0220. State law lets a homeowner improve a principal residence without a contractor license if the work is done before sale and the owner has lived there for the 12 months before completion. Owner-builders skip the business operations tax; valuation still means full contractor market value. Owner-builder form CDD-0220; Business and Professions Code 7044; Public Permit Portal rules
The online system lets homeowners pull only re-roof, HVAC and water heater change-outs; everything else goes by email.
San Antonio, TX Yes No. DSD says homeowners must use licensed trade contractors for new electrical work; the electrical contractor registers with the city before pulling the permit. Yes, only in the homestead you live in and only if you do the installation yourself without anyone's help (City Code 10-6(j)), with a notarized Plumbing Affidavit for Homeowner's Permit. No. Homeowners must use a licensed trade contractor with a state mechanical license registered with the city. A homeowner can take out the building permit by attesting that they own and will own, occupy or rent the home for 12 months after the project (City Code 10-115(a)(1)) and taking responsibility for scheduling inspections; if you are selling soon, a licensed contractor applies. Rental and business properties are excluded from the plumbing exception. City Code 10-115(a)(1) and 10-6(j); DSD residential permits page
A city-registered home improvement contractor may also pull residential permits on your behalf.
San Diego, CA Yes Yes. SDMC 129.0306 lets an electrical permit be issued to the property owner or lessee as well as a licensed contractor. Yes. SDMC 129.0406 lets a plumbing or mechanical permit be issued to the property owner or lessee. Yes, same section; HVAC contractors may extend gas piping only to the equipment they install. Sign the Owner-Builder Verification Form DS-3042, notarized if you are not present; tenants cannot sign it. California's owner-builder rules cover a principal residence you have lived in for the prior 12 months. A homeowner's Simple Permit normally issues within about two business days; a contractor's as soon as the invoice is paid. SDMC 129.0306 and 129.0406; Owner-Builder Verification Form DS-3042; Business and Professions Code 7044
San Diego is the one city whose code names the lessee as well as the owner for trade permits.
San Francisco, CA Some work Only the owner of a stand-alone single-family house (R-3) doing the work personally; LLC-owned homes excluded; all wiring stays exposed until the inspector approves it, and deficiencies are fixed by a licensed contractor. Same narrow rule: stand-alone single-family primary residence, work done personally; condo and flat owners must use licensed contractors. Same narrow rule; homeowner mechanical permits are approved at Inspection Services and the inspector can require a contractor. Property owners may pull building permits, but the homeowner route is only for a stand-alone single-family home that is the owner's primary residence and only when the owner does the construction personally. After filing online you meet an inspector at the Permit Center help desk with ID, who can send you to hire a contractor instead. Owners of condos and flats cannot use it for the building permit or the trade permits. DBI who-can-obtain-a-permit rules; DBI homeowner permit procedure
The online reroofing permit is a C-39 contractor product; an owner doing their own roof files in person. Any paid job over $1,000 or needing a permit requires a licensed contractor.
San Jose, CA Yes Yes, as owner-builder on a principal residence occupied for 12 months, doing the work personally. Yes, as owner-builder, or by hiring licensed trades directly. Yes, as owner-builder; refrigerant handling is separately regulated by federal law. California's owner-builder exemption: a homeowner improving a principal residence they have occupied for 12 months may pull the permits and do the work personally or hire licensed subcontractors, with the work done before sale. Any contractor hired for a job of $1,000 or more must hold a state license. Business and Professions Code 7044; SJMC 24.02 permit rules
The page states the state rule; San Jose adds no local owner-builder form of its own on the pages read.
Seattle, WA Yes Yes, for an owner-occupant doing the wiring personally; SDCI issues homeowner electrical permits online, often the same day. Yes: Public Health Seattle and King County issues homeowner plumbing permits under RCW 18.106.150 for plumbing the owner does personally. Yes: SDCI's mechanical permit pages do not limit who applies for a single-family furnace or heat-pump permit; gas piping is a Public Health homeowner permit. The owner applies for the SDCI construction permit in the Seattle Services Portal. Electrical homeowner permits require owning and occupying the property and doing the work yourself; SDCI can add a contractor later if you change your mind. Hired trades need a Washington electrical contractor license or plumbing contractor registration plus a Seattle business license. SDCI electrical permit page and FAQ; RCW 18.106.150; Public Health fee schedule
Plumbing and gas permits are the county's, not SDCI's, in every case.
St. Louis, MO Yes Limited, after a free written test: an owner-occupant of a single-family home may pull permits for repairs, modifications and room additions to the existing system, buying the materials and doing the labor; service changes, rehab and new construction stay contractor-only. After the homeowner exam: the Board of Examiners certifies the owner-occupant of a single-family home who passes (offered once; a fail means a one-year wait), for one open permit of up to four fixtures at a time, valid two years at that address. Under the Homeowners Permit exception: an owner-occupant of a single-family dwelling who shows the Mechanical Equipment Inspection Section sufficient knowledge, plus EPA Universal Technician certification if refrigerant is handled. The owner, a lessee or an agent may apply for the building permit (homeowners can register on the city permit portal), and an owner-occupant of a one- or two-family home may draw the plans without an architect's seal. Work on a house held for rent or sale under a homeowner plumbing certification is a violation. Ord. 70795 (who may apply; owner-drawn plans); Plumbing Code 111.17; Electrical Code 80.6.2.1; Mechanical Homeowners Permit
Every trade has an owner route, and every one is gated by a test or a demonstration of knowledge rather than an affidavit.
St. Paul, MN Yes Yes, for a homesteading owner of a single-family home or one side of a side-by-side duplex or townhome with rated walls, who does the wiring personally and signs DSI's homeowner affidavit; it is unlawful for owners to wire property that is rented, leased or occupied by others. Yes, for the owner-occupant of a one- or two-family home who does all the work personally, once a plumbing inspector approves the application; the owner must keep a working bathroom, a kitchen-type sink and a bedroom during construction. Yes, but only on a single-family home the owner legally homesteads with Ramsey County, or the half of a duplex they live in, doing the work themselves with DSI's homeowner affidavit; not on property rented or occupied by others. The homesteading owner of a one- or two-family home signs the Homeowner's Building Permit Affidavit that they are not building for resale. A hired builder needs a City of Saint Paul license or a Minnesota residential building contractor license, and a remodeler handling two or more trades on a one- to four-unit home needs a Minnesota residential remodeler or building contractor license. DSI Homeowner's Building Permit Affidavit; DSI homeowner plumbing and electrical affidavits; DSI warm air and gas burner pages
A plumbing permit expires if work stops for 180 days, and electrical permits of $250 or less are void 12 months after issue under state law.
Stockton, CA Yes Yes: the city's electrical handouts (EV chargers, generators) issue permits to the property owner with a completed Owner/Builder form or to a California licensed C-10 contractor with a current City of Stockton business license; the city has no panel-specific handout. Unclear: the city has no general plumbing handout, and the page says to ask the Permit Center which license it accepts for other plumbing work; its water heater handout names C-4 or C-36 plumbing contractors on the same terms as the owner. Yes: permits go to the property owner with a completed Owner/Builder form or to a California licensed C-20 contractor with a current City of Stockton business license, plus an authorization letter for whoever picks up the permit. Homeowners may hold the building permit with the Owner/Builder Declaration; for a shed the city will not issue the permit until it is initialed, signed and returned. A reroof permit goes only to the owner with an Owner/Builder form or to a C-39 roofing contractor, and an ADU application includes the Owner/Builder form if you are the builder. A contractor needs a current City of Stockton business license. The pages state no residency period, no cap on structures and no sale restriction for owner permits. Hiring anyone other than licensed contractors on work worth $500 or more may make you an employer under state and federal law. Owner/Builder Declaration and Owner/Builder form named on the shed, deck, kitchen, bathroom, roof, HVAC and ADU pages; city electrical, water heater, Residential Reroof (BLDG-0019) and Residential HVAC (BLDG-0048) handouts
The fence and pool pages say nothing about who may pull the permit. The pages do not say whether an owner needs a plumbing license for non-water-heater work, so the plumbing cell is read as unclear rather than no.
Tampa, FL Yes Yes. Florida Statutes 489.503(6) lets the owner of a single-family or duplex home that the owner occupies and does not sell act as the electrical contractor; the owner must do or directly supervise the work and cannot subcontract it under the owner's own permit. Yes, as an owner-builder on the owner's own home under Florida Statutes 489.103(7); the city's FAQ says an owner cannot subcontract the plumbing work under the owner's own permit. Yes, as owner-builder on the owner's own home under Florida Statutes 489.103(7); the city's FAQ says an owner cannot subcontract the mechanical work on the owner's own permit. Owners sign the city's Owner-Builder Acknowledgement Form; corporations and LLCs must hire a licensed contractor. The exemption is for the owner's own use: a sale or lease within 1 year of completion creates a presumption that the work was for sale or lease. A recorded Notice of Commencement is required before the first inspection when a contract exceeds $5,000, except a contract to repair or replace an existing heating or air-conditioning system for less than $15,000. The city's owner-builder form bars offering the property for sale, lease or rent for 1 year after completion. Florida Statutes 489.103(7) and 489.503(6); Owner-Builder Acknowledgement Form; Florida Statutes 713.135
Pool plans must still be signed and sealed by a Florida licensed architect or engineer. The $7,500 owner exemption in Florida Statutes 553.79(1)(g) excludes electrical, plumbing, structural, mechanical and gas work.
Tucson, AZ Yes Yes, on a home you own and occupy, by filing the Owner/Builder Affidavit under A.R.S. 32-1121.A.5; rental properties need a licensed contractor. Yes, under the same affidavit. Yes, under the affidavit; PDSD notes a licensed HVAC contractor must ensure code compliance, so most replacements are filed by the installer. List yourself as owner on the permit and file the Owner/Builder Affidavit under A.R.S. 32-1121.A.5, which applies only if you occupy the home and do not sell or rent it for at least a year. The handyman exemption never covers work that needs a permit or costs $1,000 or more. PDSD wants a general contractor named when a job spans several trades. A.R.S. 32-1121.A.5; PDSD Owner/Builder Affidavit
The owner-builder exemption does not cover structures intended for rent, so a casita built to rent needs a licensed contractor.
Tulsa, OK Yes ⚠ No. Tulsa issues electrical permits to licensed contractors registered with Development Services, and the city's forms page says only a licensed tradesperson may apply for trade permits. State law lets an individual do electrical work on their own residence except as local ordinances require. Unclear. The city's forms page and 2019 guide say plumbing permits go to licensed contractors only, but its 2017 residential permit application says a homeowner may receive a plumbing permit and do the work on their residence. State plumbing law does not apply to an individual doing plumbing on their own residence. No. Mechanical permits go to licensed contractors registered with Development Services, and the state Mechanical Licensing Act exempts an owner only for minor repairs such as cleaning, adjusting and replacing fuses or thermostats. The owner, a contractor, an architect or an authorized agent can file the building permit. Homeowners building, remodeling or adding to their own single-family or duplex structure can sign the city's affidavit of exemption from the insurance requirement; the city says it does not know whether you are exempt and offers no opinion. City forms page; 2019 Residential Building Permit Process guide; 2017 residential permit application; Oklahoma Electrical License Act, Mechanical Licensing Act and plumbing license law
The page's advice is to file the building permit yourself and expect a licensed contractor to pull each trade permit. State roofing registration does not apply to an owner roofing their own property without pay.
Virginia Beach, VA Yes Yes. The city issues electrical permits to owners, who list name, address, approximate cost of materials, signature and any related permit number; the work must pass the final inspection. Yes. The city issues plumbing permits to owners, who list name, address, approximate cost of materials and signature. Yes. The city lists what an owner provides for a mechanical permit, including the approximate cost of materials; the load calculation and duct design certification may be signed by the property owner. State law exempts from contractor licensing a person working on no more than one primary residence he owns and uses himself in any 24-month period, and the work must still meet the building code. Contractors file with a Class A, B or C state registration number, and electrical, gas and mechanical applications carry the registered master tradesman's signature. For a fence permit only the owner or a Virginia licensed contractor may apply, and for a hired contractor the city recommends the contractor pull the permit in its own name. City trade permit instructions (what an owner provides); Code of Virginia 54.1-1101 (A)(7) on contractor licensing
Owners may also apply for building permits (shed, deck, pool, roof, alterations) with the same details. The page describes no city residency period, but a pool needs a notarized Pool Barrier Affidavit signed by the owner and pool contractor.
Washington, DC Yes No. Only a DC-licensed master electrician, or someone acting on the master's behalf, can apply; DOB's Homeowner's Center states that homeowners cannot apply for trade permits, and the page says there is no owner-builder route for electrical work, even in your own house. No. DOB issues plumbing permits only to licensed and bonded master trade professionals, and homeowners cannot apply for them. No. Mechanical and gas permits go only to a DC-licensed master mechanic, master plumber/gasfitter or master gasfitter, and homeowners cannot apply for them. The building permit goes to the homeowner of a one- or two-family home, who applies through the Permit Wizard and attests to being the contractor of record. Roof work in the Homeowner's Center category must be submitted by the homeowner or with the homeowner's authorization. The pages state no residency period, frequency cap or affidavit. DOB Homeowner's Center statement that homeowners cannot apply for trade permits; 2017 DC Building Code rule that a trade permit application comes from the licensed master tradesperson who will supervise the work; DOB Permit Wizard
A homeowner doing a permitted remodel, deck, shed or pool files the building permit and hires a licensed master for each trade permit. The pages state no owner-builder route for any trade work.
Wichita, KS Yes After the homeowner electrical exam ($50, 2023 NEC, 75% to pass, plan review included): an owner-occupant of a detached single-family home may take a permit for work on the load side of the service panelboard. The service entrance conductors, meter base, grounding and service panelboard go to a licensed electrical contractor. After the homeowner plumbing exam ($25, passed at 75%): owner-occupants may obtain permits to repair, replace or maintain the plumbing in their own single-family home and must do the work personally. A water heater has its own $25 exam. After the homeowner A/C and furnace exam run by the Mechanical Chief: an owner-occupant of a detached single-family home may install air-conditioning and warm-air heating systems in the home they live in if they buy all materials, do all the labor, pass a simplified open-book exam and submit a plan of the installation. Each failed re-inspection of owner-installed work is billed at $40. Owner-occupants only: an owner who lives in the house can apply for permits on the MABCD Portal without a contractor license when remodeling or repairing a single-family home, and files a homeowner declaration form when acting as their own contractor. At application the owner names licensed subcontractors or schedules the homeowner exams; if neither, licensed trades must do the work. Owners who rent the home out or do not live there must use licensed contractors. MABCD owner-occupant rules and homeowner exam pages; contractor licensing owner exemption; Unified Building and Trade Code
Wichita splits the work: building permits are open to an owner-occupant, but service and main-panel work reads as a licensed electrician's job and rental properties need licensed contractors for all trade work. The $200 minor-repair sentence in the owner-occupant plumbing section does not say whether it covers contractor work.

The status describes whether the city issues the building permit for ordinary residential work (a deck, a shed, a remodel, a reroof) to the owner of a one- or two-family home they occupy, as the city page reads the city's documents on the date it was last verified. The three trade columns say whether that owner may do the electrical, plumbing or mechanical work under a permit in their own name, and sort yes, after an exam, unclear, no. Conditions are the city's own: residency period, affidavit or form, frequency cap, helper rule, rental exclusion. Each row links to the city's electrical-panel page, where the owner rules are stated most fully; the same rules appear on the city's other project pages. A flag marks a row where the city's documents disagree or could not be fully retrieved. Download the table as CSV.

What the comparison shows

46 cities issue the building permit to the owner, and each attaches its own conditions

Albuquerque, Aurora, Austin, Boston, Charlotte, Cincinnati, Colorado Springs, Corpus Christi, Denver, El Paso, Fort Worth, Fresno, Honolulu, Houston, Indianapolis, Jacksonville, Kansas City, Las Vegas, Long Beach, Los Angeles, Louisville, Miami, Milwaukee, Minneapolis, Nashville, New Orleans, Orlando, Phoenix, Pittsburgh, Portland, Raleigh, Riverside, Sacramento, San Antonio, San Diego, San Jose, Seattle, St. Louis, St. Paul, Stockton, Tampa, Tucson, Tulsa, Virginia Beach, Washington, Wichita let a homeowner hold the building permit for work on the home they live in. The conditions repeat with local twists. Residency: California's owner-builder law requires 12 months in the house before completion, which Los Angeles, San Diego, San Jose, Sacramento, Long Beach and Fresno each restate; San Antonio asks you to attest that you will own the home for 12 months after the project; Cincinnati and Charlotte presume you will live there a year after completion; Tampa and Orlando presume a sale or lease within 1 year of completion means the work was for sale or lease; Raleigh's affidavit commits the owner to occupy the home for twelve months and Denver requires 12 months of occupancy after the work; Phoenix and Tucson treat a sale or rental within a year as evidence the work was done for sale. Paperwork: a notarized affidavit in Albuquerque, Cincinnati and Kansas City (IB146), an in-person signature with homestead proof in Jacksonville and Miami, an in-person Owner/Builder Declaration in Orlando, a notarized homeowner affidavit with proof of ownership in El Paso, an approved Contractors Board owner-builder affidavit under NRS 624.031(5) in Las Vegas, a declaration or verification form in Los Angeles, San Diego (DS-3042), Sacramento (CDD-0220), Long Beach (FORM-005), Fresno (the Permit Affidavit Form), Wichita (a homeowner declaration) and Tucson, an Owner-Builder Acknowledgement Form in Tampa, an Affidavit of Exemption and a Self Permit Affidavit in Nashville, the Owner Exemption Affidavit in Raleigh, Form R-1364 and an Affidavit Claiming Exemption from Licensure in New Orleans, a Statement of Intent in Indianapolis, a homestead exemption on record in Fort Worth, Dallas and Houston, an Owner/Builder Declaration in Stockton, the Property Owner Package in Riverside, DSI's Homeowner's Building Permit Affidavit in St. Paul, a notarized Homeowner's Work Affidavit in Corpus Christi and the Property Owner's Package in Irvine. Frequency caps: one homeowner's permit per owner per 12 months in Albuquerque, twice in three years in Long Beach, two structures in three years in Los Angeles and Fresno, up to three single family detached structures in Aurora, once per calendar year as owner-contractor in Chicago, in Minneapolis improving more than one property within 24 months requires a state license, and in Virginia Beach the state licensing exemption covers no more than one primary residence in any 24-month period. Helpers: Kansas City expressly allows family and friends; Dallas and Albuquerque require an affidavit that nobody else is paid; Charlotte says a homeowner permit cannot be issued for someone else to do the work; Los Angeles warns you become the employer of anyone unlicensed you hire, and Stockton, Riverside and Irvine warn that hiring anyone other than licensed contractors on work worth $500 or more may make you an employer. Others: Austin lets a homeowner register with Building and Trade Contractor Services as the contractor for their own property; Boston lets the owner of an owner-occupied one- or two-family home file the building permit, with a licensed contractor required in a building of three or more homes; Colorado Springs limits the homeowner permit to a primary residence the owner owns and lives in, for trades the owner performs; Washington's homeowner of a one- or two-family home applies through the Permit Wizard and attests to being the contractor of record, and El Paso's homestead permit goes to an owner-occupant of an R-3 home acting as his own general contractor. Aurora has the owner sign the city's Statement of Understanding, and Honolulu requires registering for the owner-builder exemption under HRS 444-2.5 before the work.

Seven cities draw a line around what an owner may build

Baltimore, Chicago, Dallas, Irvine, Philadelphia, San Francisco issue an owner permit only for some work or behind a gate. Dallas's homeowner exemption form lists interior remodeling, fences, roofing, patio covers and portable accessory buildings, and says in terms that it does not allow a new home, an addition, a permanent detached accessory building or a swimming pool, even on a homestead; decks are not mentioned. Philadelphia lets an owner who lives in a one- or two-family home hold the building permit only when the project needs no electrical or plumbing permit, which covers a fence, a deck or a reroof and rules out an owner-built kitchen, bathroom or ADU. San Francisco limits the homeowner route to a stand-alone single-family house that is the owner's primary residence, requires the owner to do the construction personally, and sends every applicant to an inspector at the Permit Center who can require a contractor instead; condo and flat owners are excluded. Chicago lists a licensed general contractor on every permit and lets an owner stand in for one on their primary residence once per calendar year with Form 401. Baltimore's code lets the owner apply while DHCD's permits page says construction on one- and two-family dwellings requires an MHIC-licensed contractor. Irvine permits work on homes to state-licensed contractors with one very limited exception, an owner-builder who signs the city's Property Owner's Package. New York has no owner-builder permit at all: permitted work is filed by a PE or RA and the permit goes to a Registered General Contractor, and the DOB homeowner page lists only the exempt work (a shed up to 120 sq ft, a fence to 6 ft, non-structural roof repair) that an owner may do.

Electrical: 28 yes, 7 after an exam or limited, 13 never, 5 unresolved

An owner-occupant may do their own permitted electrical work in Los Angeles, San Diego, San Jose, Sacramento, Long Beach and Fresno (California's owner-builder rules, with the 12-month residence), Phoenix and Tucson (ARS 32-1121.A.5), Seattle, Portland, Miami, Jacksonville and Tampa (Florida's FS 489.503(6)), Raleigh (a notarized Owner Exemption Affidavit), Charlotte (G.S. 87-43.1, with a County bond and certificate), Minneapolis (a state DLI homeowner permit, only for a home with its own electrical service), Fort Worth (a homestead permit, but never the service or main breaker), Louisville (KRS 227.480 with a notarized certification), Kansas City (IB146), Colorado Springs (a homeowner permit for a primary residence you own and live in), Virginia Beach (the owner lists name, address and approximate cost of materials), Orlando (FS 489.503(6), signing the Owner/Builder Declaration in person), Las Vegas (NRS 624.031(5) with an approved Contractors Board affidavit), Stockton (the Owner/Builder form), St. Paul (a homesteading owner who wires personally and signs DSI's affidavit), Corpus Christi (a homestead, with a notarized Homeowner's Work Affidavit), Irvine (the very limited owner-builder exception in Bulletin 222) and, narrowly, San Francisco (a stand-alone single-family house, wiring left exposed until approved). Six cities require a test first, and Austin allows only a Homestead Permit that excludes the main electric service: Albuquerque's written exam at 75 percent (four hours, two attempts, one pass a year), Denver's free homeowner electrical exam (a state license can substitute), Dallas's homeowner exam witnessed by the district inspector, Indianapolis's board approval under Sec. 875-222, St. Louis's free written test, which unlocks only repairs, modifications and additions, never a service change, and Wichita's $50 homeowner electrical exam, which covers load-side work only. Thirteen cities issue no homeowner electrical permit: New York, Chicago (no owner-occupant exception, unlike its plumbing), Houston (master electricians only, though Texas law exempts homeowners from the state license), San Antonio, Philadelphia, Baltimore, Boston (licensed contractors only; the applicant must be the electrician), New Orleans (a Class A Electrical License only), El Paso (state-licensed contractors registered with the city), Washington (DC-licensed master electricians only), Honolulu (Hawaii-licensed electrical contractors only; the owner-builder exemption excludes electrical work), Tulsa (licensed contractors registered with Development Services) and Milwaukee, which narrows Wisconsin's owner exemption to swapping a switch, receptacle or fixture rated 20 amps or less. Cincinnati and Pittsburgh publish rules on both sides and the pages say ask first, Nashville's page says whether an owner may do panel work is a question for Permit Issuance, and Aurora's says to ask the Permit Center whether an owner may do their own electrical service work, and Riverside's says to ask the counter which permit types an owner-builder may pull. Texas alone produces five answers: no in Houston, San Antonio and El Paso, exam in Dallas, yes below the main breaker in Fort Worth, and a plain yes on a homestead in Corpus Christi.

Plumbing is the most open trade, with single-family and homestead strings attached

33 cities let an owner do their own permitted plumbing. The common string is the type of home: single-family only in Cincinnati (Building Code 1105-13, with a notarized affidavit), Milwaukee (MCO 225-3-2), Minneapolis (a home that shares no utility service), Chicago (a detached single-family house) and San Francisco (a stand-alone house), and Tampa and Raleigh accept owners under Florida Statutes 489.103(7) (no subcontracting the plumbing) and the Owner Exemption Affidavit; a recorded homestead in Houston (a $116.11 Homeowner's Plumbing Permit), Dallas, Austin (a Homestead Permit) and San Antonio, Colorado Springs for work the owner does themselves at a home they own and live in, St. Paul (the owner-occupant of a one- or two-family home who does all the work personally) and Corpus Christi (a homestead, with a notarized affidavit), whose City Code 10-6(j) adds that the owner must make the installation without help from anyone. Virginia Beach lets owners list name, address and approximate cost of materials, Orlando requires the Owner/Builder Declaration signed in person (and a notarized signature on a plumbing permit outside a building permit) and Las Vegas allows it on a primary residence with the approved Contractors Board affidavit. Three cities issue the plumbing permit through another government and still allow owners: Public Health Seattle and King County (RCW 18.106.150), Allegheny County Health Department for Pittsburgh (a bona fide owner presently occupying a single-family building) and Kentucky's Division of Plumbing for Louisville (affidavit, all work personally). Four cities test first: Albuquerque's written exam, Denver's free open-book homeowner plumbing exam, Wichita's $25 homeowner plumbing exam passed at 75% and St. Louis's Board of Examiners certification, offered once, good for two years at one address and one open permit of four fixtures. Indianapolis allows homeowner plumbing permits only in limited situations decided by email, Nashville's page says to ask Permit Issuance, Aurora's says to ask the Permit Center, Stockton's says to ask the Permit Center which license it accepts, Riverside's says to ask the counter whether plumbing is included, Irvine's gives no separate plumbing rule, Fresno's gives no plumbing-specific owner rule and Tulsa's conflict (licensed contractors only on its forms page and 2019 guide, a homeowner plumbing permit on its 2017 application). New York, Philadelphia, Baltimore, Boston (a contractor with a valid Massachusetts trade license), El Paso (state-licensed contractors registered with the city), Washington (licensed and bonded master trade professionals), Honolulu (Hawaii-licensed plumbing contractors only) and New Orleans (through the Sewerage and Water Board, to an Orleans Parish licensed master plumber) issue plumbing permits only to licensed plumbers, and Baltimore's page notes that state law lets you plumb your own residence while the city still issues the permit only to a master plumber.

HVAC: 31 yes, with gas and refrigerant carved out

31 cities let an owner-occupant pull a mechanical permit, and the carve-outs follow the fuel. Minneapolis bars owners from gas-fired heating equipment and sends all gas piping and venting to a licensed gas installer; Phoenix says the state's small-job exemption never covers work connected to a gas supply; Seattle's gas piping permit is a Public Health homeowner permit; St. Louis requires EPA Universal Technician certification if refrigerant is handled, Chicago and San Jose note the federal refrigerant rule, St. Paul limits the permit to a single-family home the owner homesteads or the half of a duplex they live in, and Corpus Christi sends a new gas furnace connection to a state-licensed plumber. Indianapolis, St. Louis, Wichita (a simplified open-book exam and an installation plan) and Denver (a free homeowner mechanical or HVAC exam) gate the permit with a test or a showing of knowledge. Eleven cities issue no homeowner mechanical permit: Albuquerque (the one trade without a homeowner exam), Austin (for a central AC or heat pump), Baltimore, Boston, El Paso, New Orleans, New York, Philadelphia, San Antonio, Tulsa and Washington. Seven are unresolved on their own pages: Honolulu's page does not say whether an owner may install the mechanical part of a split system, Nashville's page says to ask Permit Issuance whether a homeowner gas/mechanical permit is available, Houston's Residential Permitting 101 says a homeowner may obtain the permit in some instances without listing them, Cincinnati's HVAC handout is silent on owner permits, Pittsburgh's licensing rules and EZ page disagree, Riverside's says the owner-builder route depends on the permit type at the counter, and Chicago offers only the owner-as-contractor route for permitted work.

The rental exclusion is near-universal, and some cities exclude the entity too

Almost every owner route stops at the front door of a rental. Albuquerque, Charlotte, Colorado Springs, Tucson, Milwaukee, Pittsburgh and Wichita send rented homes to a licensed contractor outright; Indianapolis's trade exams, Minneapolis's DLI permit and Louisville's certification are for owner-occupants only; Miami and Jacksonville require that the home not be for sale or lease; Portland adds that the owner may not work on a property for sale, lease or exchange, or on an ADU, within six months; Phoenix, Tucson and Honolulu presume a sale, lease or rental within a year means the work was for sale; Kansas City and Minneapolis exclude two-family homes from the trade exceptions; St. Louis calls homeowner plumbing on a house held for rent or sale a violation, and St. Paul bars owner wiring and mechanical work on property rented, leased or occupied by others. Portland and San Francisco go a step further and exclude homes owned through an LLC: the homeowner must be the recorded individual owner. Tampa sends corporations and LLCs to a licensed contractor, and Nashville limits an owner whose title is in an LLC or trust, or who is building at a rental, to self-permitted work under $25,000. Tampa's form bars offering the property for sale, lease or rent for 1 year after completion, Raleigh's affidavit bars offering it for rent, lease or sale for twelve months, and New Orleans's exemption does not cover property for sale or rent. Orlando limits the declaration to a home not built for sale or lease, and Las Vegas limits the exemption to a structure for your own occupancy, mainly a single-family home rather than a condominium or apartment. Charlotte, Indianapolis and Jacksonville tie the permit to the name on the deed; Dallas, Fort Worth, Houston, San Antonio and Jacksonville to a homestead exemption on record.

Where the city's own documents disagree

Tulsa's forms page and 2019 guide say trade permits go to licensed contractors only while its 2017 residential permit application says a homeowner may receive a plumbing permit. Cincinnati's building code requires OCILB-licensed contractors for electrical and HVAC permit work while its contractor chapter exempts an owner-occupant who will live there a year from registering to do the work personally; IBI, which issues the electrical permits, says its counter serves do-it-yourselfers, and the HVAC handout is silent, so both pages say ask first. Pittsburgh's licensing rules require a city electrical or HVAC trade license for any permitted work while its EZ page lists homeowners at a primary residence among those who may do residential EZ work. Baltimore's code lets the owner apply for a building permit while DHCD's page says one- and two-family construction requires an MHIC-licensed contractor. Houston's guide says a homeowner may obtain the mechanical permit in some instances it does not list. Dallas's homeowner exemption form does not mention decks. Nashville's DADU page says the homeowner can pull renovation permits up to $25,000 while its other page says under $25,000, so the two differ at exactly $25,000. New Orleans's reroofing and pool pages do not say whether an owner-occupant may file the building permit. Denver's pool guide requires a licensed contractor while Admin 131.4 homeowner permits cover a one-family house and its accessory structures. Louisville's Construction Review pages could not be retrieved, so its owner-filed building permit route rests on a phone number. Boston's renovation page tells homeowners to hire a contractor who applies for the permits, while the same pages say owners of owner-occupied one- or two-family homes may file the short or long form themselves. Colorado Springs's ADU page says to ask PPRBD whether a homeowner permit still applies if you plan to rent the ADU, while its other pages bar homeowner permits only for rentals and for work by a hired contractor. Irvine's pages say an owner may pull a permit as owner-builder for a shed, a panel and a condo kitchen while Bulletin 222 calls the exception very limited. The table flags those rows rather than resolving them.

Method

The 53 cities are the ones whose BuildPermitGuide pages have been rewritten from primary sources as of October 2026. For each city the project pages quote the city's permit pages and bulletins, its contractor-licensing and who-may-apply rules, its owner-builder, homestead or homeowner forms and affidavits, and the state statute behind them (California Business and Professions Code 7044, Arizona A.R.S. 32-1121.A.5, Florida Statutes 489.103(7) and 489.503(6), North Carolina G.S. 87-43.1, Oregon ORS 479.540, Kentucky KRS 227.480, Texas Occupations Code 1301.051 and 1302.053, Minnesota Statutes 326B.37, Washington RCW 18.106.150). The answers in the table are the city pages' own readings of those documents for the owner of a one- or two-family home they occupy. Nothing is inferred from another city's rules or from a state statute alone where the city's own pages were silent; where the city's documents disagree, the row carries a flag instead of a resolution. Each city page carries the date its sources were last verified, and the change log records when a cited document changes.

Use this data. The table and CSV are published under CC BY 4.0. Cite it as:
BuildPermitGuide, “Can a Homeowner Pull Their Own Permit? 53 Cities Compared” (2026), https://buildpermitguide.com/research/owner-builder-permit-rules/
Questions, corrections or a city you want added: contact us.

Frequently asked questions

In 46 of the 53 largest cities we cover, yes, for work on a one- or two-family home the owner lives in, usually after signing an owner-builder affidavit or declaration. Dallas, Philadelphia, San Francisco, Chicago, Baltimore and Irvine allow it only for some work or behind a gate, and New York issues no owner-builder permit: filings go through a licensed professional and a registered contractor.
In 28 cities an owner-occupant can: Los Angeles, San Diego, San Jose, Sacramento, Long Beach, Phoenix, Tucson, Seattle, Portland, Miami, Jacksonville, Tampa, Raleigh, Charlotte, Minneapolis, Fort Worth (not the main breaker), Louisville, Kansas City, Colorado Springs, Virginia Beach, Orlando, Las Vegas, Fresno, Stockton, St. Paul, Corpus Christi, Irvine and, narrowly, San Francisco. Albuquerque, Dallas, Denver, Indianapolis, St. Louis and Wichita require a city exam first, and Austin allows only a Homestead Permit that excludes the main electric service. New York, Chicago, Houston, San Antonio, Philadelphia, Baltimore, Boston, Milwaukee, New Orleans, El Paso, Washington, Honolulu and Tulsa never issue a homeowner electrical permit.
In 33 cities, often only in a single-family home (Cincinnati, Milwaukee, Minneapolis, Chicago, San Francisco) or a recorded homestead (Houston, Dallas, Austin, San Antonio, Corpus Christi), and St. Paul needs an owner-occupied one- or two-family home. Albuquerque, Denver, St. Louis and Wichita require an exam; Indianapolis allows it only in limited cases. New York, Philadelphia, Baltimore, New Orleans, El Paso, Washington and Honolulu issue plumbing permits only to licensed master plumbers or registered contractors, and Boston only to a contractor with a Massachusetts trade license. In Seattle, Pittsburgh and Louisville the plumbing permit comes from a county or state body, which still allows owners.
In nearly every city that offers one, yes, and most add a period: 12 months before completion in the California cities, 12 months of ownership after the project in San Antonio, a year of occupancy after completion in Cincinnati and Charlotte, no sale or rental within a year in Phoenix and Tucson (Orlando presumes a sale or lease within 1 year means it was built for sale) or within six months in Portland. Indianapolis is the exception for the structural permit, which any owner may pull; its trade exams are for owner-occupants only, and the Stockton and Riverside pages state no residency period.
No, in every city that states a rule; the Stockton and Riverside pages state no sale or rental restriction. Rentals and homes for sale go to licensed contractors in Albuquerque, Charlotte, Colorado Springs, Tucson, Milwaukee, Pittsburgh, Miami, Jacksonville, Portland and Minneapolis, and Kansas City and Minneapolis exclude two-family homes from the trade exceptions. Portland, San Francisco and Tampa also exclude homes owned through an LLC.
Kansas City expressly allows family and friends. Dallas and Albuquerque require an affidavit that nobody else is paid; San Antonio's homestead plumbing permit requires the owner to work without help from anyone; Charlotte says a homeowner permit cannot be issued for someone else to do the work; Los Angeles warns you become the employer of anyone unlicensed you hire, as do Stockton, Riverside and Irvine for work worth $500 or more; Jacksonville says you must supervise unlicensed helpers yourself. In California and Arizona a paid handyman may take only jobs under $1,000 that need no permit.

The city pages behind this table

Each page quotes the code section, exempt-work list and fee schedule it relies on and records the date they were last verified.

Related: How to Apply for a Building Permit · Electrical panel permits in all 50 cities · Toilet replacement permit rules compared · Pool barrier heights compared · Permit fee change log · Open data exports

Stay up to date
Get notified when we add new cities or update permit fees.