Permit Required? Required
Typical Fee Range $124–$135 No plans; same $105 fee for any amperage; Level 2 EV chargers need plan review
Fee Method $105 flat minor electrical permit + surcharges

What's Required in Sacramento

  • Panel change-outs, upgrades and new circuits need a Residential Minor Electrical permit.
  • The building permit fee is a flat $105 plus technology, General Plan and green building fees.
  • No plans are required for panel work; code compliance is verified in the field.
  • Contractors can apply online; homeowners apply by email with the owner-builder form.
  • A relocated exterior panel must be screened from all street views under the Planning Express form.
  • Level 2 EV chargers need a plan submittal with a one-line diagram and the CDD-0213 load calculation.
  • SMUD reconnection after a shutoff may require a separate $107 safety inspection.

Do you need a permit to replace an electrical panel in Sacramento?

Yes. The City of Sacramento Building Division treats main and sub service panels as residential electrical minor work: a minor permit, with no plans required and the code review done by the inspector in the field. The same permit can cover several electrical scopes at once: replacing the main panel, adding or replacing a subpanel, re-wiring all or part of the house, and adding new branch circuits. Licensed contractors can pull it online through the Public Permit Portal as a Web-Minor Electrical record. Homeowners are not on the online list for electrical work; an owner-builder applies by emailing the Universal Building Permit Application (CDD-0200), the owner-builder form (CDD-0220) and the Planning Exemption Form Express (CDD-0035) to EZ Permit.

How much does a panel upgrade permit cost in Sacramento?

The Residential Minor Electrical permit has a flat $105 building permit fee on the current fee table (Table B.1, effective July 19, 2025), the same for a 100-amp swap or a 200-amp upgrade, with no plan review fee. The city then adds a technology surcharge of 10 percent of the permit fee, a General Plan fee of $2.60 per $1,000 of job value, a green building fee of $1 per $25,000, and the business operations tax (value x 0.0004) when a contractor holds the permit.

  • Panel change-out, $3,000, owner-builder: $105 + $10.50 + $7.80 + $1 = $124.30.
  • 100 to 200 amp service upgrade, $6,000, contractor: $105 + $10.50 + $15.60 + $1 + $2.40 = $134.50.

The city’s average-cost web page still lists $95 for a panel change-out, which is below the $105 permit fee in the current table; budget from the fee table. If SMUD has cut power and asks for a city safety inspection before it reconnects, that is a separate $107 Safety Inspection that authorizes no work.

What you are doingCity filingRule
Like-for-like main panel replacementResidential Minor Electrical permit, $105No plans; field inspection
100 to 200 amp service upgradeResidential Minor Electrical permit, $105Planning Express form allows 100 to 200 amp upgrades in place
Moving the panel to a new exterior spotMinor permit plus Planning Express formNew location must be screened from street views
Adding a subpanel or new circuitsSame minor permitOne permit can cover several electrical scopes
Level 1 EV charger on a 120V dedicated 20-amp circuitMinor electrical permit onlineCDD-0154: no plans required
Level 2 EV charger on a 240V circuitPlan review submittalSite plan, one-line diagram, CDD-0213 load calculation
SMUD asks for an inspection before reconnectingSafety Inspection, $107Inspection only; authorizes no work

What does the inspector check?

The city’s SMUD safety inspection checklist (CDD-0309) gives a good picture of what inspectors look at on service equipment: clear working space in front of the panel, grounding electrode connections and bonds, no openings to live parts (missing dead fronts or breaker blanks), and service drop clearances. Arrange the disconnect and reconnect with SMUD; the city does not publish SMUD’s scheduling rules. Level 2 EV charger plans are reviewed in 24 hours, and EV charger permits use virtual inspections from January 12, 2026. Outside city limits, Sacramento County issues panel permits online through its own portal.

How to Get a Electrical Panel Permit in Sacramento

1

Confirm jurisdiction and scope

Check the lot is in the City and list everything you are doing: panel, subpanel, circuits or EV charger.

2

Complete the Planning Express form

Mark the electrical panel category on CDD-0035; same-spot replacements and 100 to 200 amp upgrades qualify.

3

Apply

Contractors apply online as Web-Minor Electrical; owner-builders email CDD-0200, CDD-0220 and CDD-0035 to EZ Permit.

4

Coordinate with SMUD

Arrange the service disconnect and reconnect with SMUD before the work day.

5

Pass the inspection

Schedule the inspection through the portal; the inspector checks the panel, grounding and clearances in the field.

Frequently Asked Questions

The building permit fee is a flat $105 for residential minor electrical work, whatever the amperage. With the 10 percent technology surcharge, the General Plan and green building fees, and the operations tax for a contractor, a $6,000 upgrade comes to about $135. An owner-builder replacing a panel on a $3,000 job pays about $124.
No. Main and sub service panels are minor permits, meaning no construction plans are required and the inspector checks the work in the field. A Level 2 EV charger on a 240-volt circuit is different: it needs a plan submittal with a site plan, one-line diagram and load calculation.
Yes, as an owner-builder, but not through the online system, which lets homeowners pull only re-roof, HVAC and water heater change-outs. Email the building permit application, the owner-builder verification form and the Planning Express form to EZ Permit. Licensed contractors can pull minor electrical permits online.
It is a city inspection of an electrical or gas system done before SMUD or PG&E will reconnect service. It authorizes no work. Inspectors check items such as panel working space, grounding connections and missing dead fronts, and the fee is non-refundable even if they cannot get access.
Planning signs off through its Express exemption form. A like-for-like replacement in the same spot qualifies, and the form says upgrades from 100 to 200 amps are permissible. A panel in a new location must be screened by the building so no part of it is visible from the street.