Short answer: the city's own worked example for a new or full HVAC system runs from $50 in Wichita to $840 in San Jose across the 53 largest U.S. cities we cover, and the median is $202. Fourteen are under $150: Albuquerque, Austin, Baltimore, Boston, Corpus Christi, Denver, Fort Worth, Houston, Kansas City, Los Angeles, Nashville, New Orleans, Washington, Wichita. Twenty are $150 to $249: Charlotte, Colorado Springs, El Paso, Indianapolis, Jacksonville, Las Vegas, Louisville, Miami, Minneapolis, New York, Orlando, Riverside, San Antonio, St. Louis, St. Paul, Stockton, Tampa, Tucson, Tulsa, Virginia Beach. Thirteen are $250 to $499: Aurora, Chicago, Dallas, Fresno, Honolulu, Irvine, Milwaukee, Philadelphia, Pittsburgh, Raleigh, Sacramento, San Diego, Seattle. Six are $500 or more: Cincinnati, Long Beach, Phoenix, Portland, San Francisco, San Jose. A like-for-like furnace or AC change-out costs less: nothing for some equipment in Chicago, Phoenix, Dallas and Virginia Beach, and $30 in Colorado Springs to $315 in San Jose in the other 49, with a median of $125. Eighteen cities charge a flat line, twenty-three itemize the equipment, eleven price on the job's value and San Jose bills inspection hours. Fourteen of the examples include the electrical permit for a new circuit and nineteen leave it out, so read the cell before comparing two totals. This page covers the fee; for when a swap needs a permit at all, see Do You Need a Permit to Replace a Furnace or AC? 53 Cities Compared. We read each city's fee schedule, exemption list and licensing rule and recorded the city's own reading.
Every row links to the city page that quotes the rule, so you can read the source language yourself. The table sorts by any column.
All 53 cities
| City | New or full system | The city's own example | How the fee is priced | Like-for-like swap | Who may pull it | Schedule the city cites, and notes |
|---|---|---|---|---|---|---|
| Albuquerque, NM | Under $150 | $103 for a full split system with new ductwork and a new gas outlet: $47 administrative charge + $22 condensing unit + $14 air handler + $14 duct system + $6 gas outlet. New or altered wiring needs a separate electrical permit ($47 plus items). | UAC Table 112-C, itemized with a 1.0 regional modifier: $47 administrative charge, $14 per furnace, air handler or duct system, $22 per condensing unit up to 36,000 BTU output ($40 above that), $6 per gas outlet, $16 to repair or alter a unit. | $61 for a gas furnace on the existing gas line ($47 + $14), and $83 for an AC condenser up to 36,000 BTU with a new coil or air handler ($47 + $22 + $14), both mechanical permits. | No. Only a New Mexico CID-licensed mechanical contractor. The homeowner exam route exists for electrical and plumbing permits but not for mechanical, and equipment and ductwork can only be installed by a licensed contractor. | 2024 Uniform Administrative Code Table 112-C; Building Safety permits page; UAC 111.1 Trade plan review, 25% of the permit fee, applies only when plans are required. Re-inspections are $47. Work started without a permit pays an investigation fee equal to the permit fee, and a trade permit is void 180 days after issuance if no inspection is requested. |
| Aurora, CO | $250 to $499 | $300 for a furnace and air conditioner replaced together on one flat permit; $336 with the water heater added. A new system or new ductwork is not named on the flat sheet: the valuation calculator returns a $214 permit fee for a $5,000 job. Use tax on $7,000 of equipment is $262.50 to the city. | Flat fee per replacement type on the 2026 flat-rate fee sheet; new installations are not named and may use the valuation calculator. | $201 to replace a furnace, an air conditioner or an evaporative cooler on its own; a boiler is $300 and a furnace with a water heater is $292. | Yes: homeowners can obtain permits for their primary home and sign the Statement of Understanding to act as their own contractor. A hired HVAC company needs an Aurora Mechanical Systems Contractor license, which requires an ICC Master Mechanical Contractor certification. | City 2026 flat-rate fee sheet; city valuation calculator; Do It Right home improvement handbook (March 2019) and permit chart Use tax is 3.75% of materials cost, plus 0.25% in Arapahoe County, and card payments online add at least 2.25%. The page says to ask the Permit Center whether an owner may do their own electrical or plumbing. |
| Austin, TX | Under $150 | $94.74 to replace two systems under the Residential Change-Out Program ($74.05 for the first system + $20.69 for each additional one); $74.05 for one. A new system or extended ductwork that is not a change-out is not named in the schedule: by the page's reading the $73.81 stand-alone project fee applies, or the $127.68 mechanical base fee when it rides on a building permit. | Flat change-out fee per system, a named row on the FY 2026-27 schedule. Texas Local Government Code 214.907 bars value-based residential fees, so the equipment price does not change the permit fee. | $74.05 for one system: replacing a central AC, heat pump or furnace needs a mechanical permit, with no exemption for a like-for-like swap. Exempt: portable units, self-contained refrigeration systems with 10 pounds of refrigerant or less or motors of 1 horsepower or less, and replacing supply and return duct runs. | No, in practice. A contractor with a Texas ACR license, registered with Building and Trade Contractor Services, pulls it. The Homestead Permit excludes reclaiming and charging a ducted system containing refrigerant. | FY 2026-27 residential fee schedule (Residential Change-Out Program), effective October 1, 2026; list of work exempt from permits; mechanical permit form dated May 13, 2021; Texas Occupations Code 1302.251 Each failed inspection that needs a return visit is $83.85, and card payments in AB+C carry a 2.35% service fee. The same program covers water heaters, backflow devices and irrigation and yard lines. Changes to gas piping may need a separate plumbing permit. |
| Baltimore, MD | Under $150 ⚠ | $115 for a furnace, AC and new duct system at a house: $30 + $30 + $25 = $85, plus $5 permit tax and the $25 application fee. Reworking existing ducts with up to 25 diffusers is $62. The condenser circuit adds $6 on the electrician's permit. | BFRCBC 109.6.3: $30 per fuel-burning unit up to 200,000 Btu an hour, AC $5 per ton with a $30 minimum and $300 maximum, a new duct system $25 per system at a 1-2 family dwelling and gas piping $25, plus a $25 application fee and the 5% Building Code Permit Tax. | $57 for a gas furnace up to 200,000 Btu an hour or a 3-ton AC condenser ($30 + $2 tax + $25 application fee). Replacement units are charged the same as new. | No. Section 2802.3 issues mechanical permits only to city-licensed HVACR contractors holding a Maryland HVACR license, gas piping needs a licensed gas fitter and the circuit a licensed electrician. There is no homeowner mechanical permit in the city code. | BFRCBC 109.6.3, 109.5.7, 109.7 and 2802.3; DHCD exempt-work list Skipping the permit risks a surcharge of the greater of $1,000 or 50% of the permit fee. Ground units in an interior-side yard must sit at least 3 ft from the side lot line. Most mechanical permits get a rough-in inspection and all get a final. |
| Boston, MA | Under $150 | $104 for a 100,000 BTU gas boiler: the $79 gas permit ($20 + $50 + 100 x $0.09) plus a $25 plumbing permit ($20 + $5, counting one fixture). Replacing 400 sq ft of ductwork is $70 on its own sheet metal permit. | Itemized trade permits: gas $20 plus $50 each plus $0.09 per 1,000 BTU; sheet metal $20 plus $25 for the first 200 linear or square feet and $25 for each additional 200; plumbing $20 plus $5 per fixture; electrical $20 plus $1 per fixture, plug or outlet. | $79 for a like-for-like 100,000 BTU gas furnace ($20 plus $50 plus $9 in BTU charges): a like-for-like swap is still an installation and replacement, so it still needs the permit. A heat pump that needs a 200 amp service is $70 for the electrical service upgrade alone. | No. ISD's gas, plumbing, electrical and sheet metal permit pages each say homeowners cannot apply and must hire a licensed contractor to apply and do the work. | ISD gas, sheet metal, plumbing and electrical permit fees Opening non-structural walls adds a short-form building permit at $20 plus $10 per $1,000. ISD's guides also mention mechanical permits without a fee page, so ask ISD whether your equipment needs one. |
| Charlotte, NC | $150 to $249 ⚠ | About $224 for a new system with ductwork in an addition on a $10,000 contract: a County mechanical permit of $145.03 (a real County permit) + about $72.52 for an electrical sub-permit at half that + technology charges, roughly $223.55. | Mecklenburg County LUESA Fee Ordinance (rev. July 1, 2026): valuation table of $59.70 up to $3,000, then $12.19 per $1,000 or part. Sub-permits on one- and two-family change-outs are 50% of the primary trade's fee, with a $3 technology charge on each permit. | $89.55 for the mechanical and electrical permits combined (1.5 x the $59.70 minimum) when the contractor buys them through the County's TIP system, plus $3 on each permit. Bought any other way, a change-out is charged double. | Yes. An owner-occupant who personally does the work on a primary residence, using the Homeowner Trade Work Certificate of Ownership in AccelaMeck; the permit cannot cover someone else's labor. Otherwise a North Carolina-licensed mechanical contractor. | LUESA Fee Ordinance (rev. July 1, 2026); Trades Internet Permits (TIP) page; County handbook Building permits are Mecklenburg County's, not the City's: the City only applies the UDO equipment placement rules and issues no HVAC permit. An owner-occupant doing the work personally on a project under $40,000 pays $60 per trade plus $45 per inspection trip instead. A permit expires six months after issuance if no inspected work has started. |
| Chicago, IL | $250 to $499 | $300 for a new central AC ($150) with new supply ducts ($75) and a gas line extension for a matching furnace ($75), an express mechanical permit. The separate electrical permit for the new circuit is $150 for up to 10 circuits and is not included. A $25 review fee can apply online. | Flat stand-alone fees in Table 14A-12-1204.2: $75 per equipment type and dwelling unit, $150 per dwelling unit for new AC equipment, $75 for duct extension, $75 for gas piping. Fees stack when one permit covers several scopes. | $0, no permit, for an in-kind gas furnace, boiler, ductwork or AC swap (same type, size and shape) at a residential building up to 4 stories. Changing type or fuel, such as furnace to heat pump, is an express mechanical permit at $75 per equipment type. | In part. No permit is needed for the in-kind swap. For permitted work the permit lists a licensed general contractor (an owner may act as one on a primary residence once a year), hardwired connections need a Chicago-licensed electrical contractor, and refrigerant work needs EPA Section 608 technicians. | Table 14A-12-1204.2 (Administrative Provisions); DOB list of work not requiring a permit (Mechanical); Express Permit Program Chicago issues no HVAC trade license. New AC or a heat pump adds a load calculation and site plan, and duct or gas changes add an HVAC drawing. The table is indexed to CPI from 2026, with the first adjusted schedule effective the following January 1. |
| Cincinnati, OH | $500 or more ⚠ | About $554 for a whole new system with ductwork valued at $10,000: $450 new-installation fee + $49 processing fee, with the five surcharges (about $11 per $100). New central air at $5,000 is about $331. An IBI electrical permit for a new circuit (about $105) is extra. | Fee schedule effective July 1, 2026: replacement is flat, $118 for the first unit and $48 for each additional. A new system is valuation-based in the RCO installations column ($249 at $5,000, $450 at $10,000, $618 at $15,000) plus a $49 processing fee when plans are submitted, then five surcharges. | About $131 for a furnace on the existing gas line and circuit ($118 plus surcharges, no processing fee, no separate IBI electrical permit). A furnace and condenser together is $166, about $184. Replacements can be filed online. | Unclear. The city requires OCILB-licensed HVAC contractors registered with the city ($131.25 a year). Cincinnati Building Code 1106-37 exempts an owner of a one- to three-family home who will occupy it for a year, but the HVAC handout is silent on owner permits. | Fee schedule effective July 1, 2026; Cincinnati Building Code 1101-17.4 and 1106-5; HVAC handout A new branch circuit for a condenser, mini-split or air handler needs a separate IBI electrical permit filed through ezTrak. Mechanical permits fall under Tier 2 review, targeted at 5 workdays. Working without a permit adds an investigation fee equal to the permit fee. |
| Colorado Springs, CO | $150 to $249 | $223.25 for a new system in a house with no air-moving system, priced on Table C at a $12,000 job cost: $176 for the first $5,000 plus 7 x $6.75. There is no plan check or city zoning fee. | Flat fees for replacements ($30 condensing unit; $50 for a furnace, a coil and condenser, a wall or space heater or a boiler; $75 with the vent); a new system with no air-moving system is priced on Table C by job cost. | $30 to replace the condensing unit; $50 to replace a furnace, or $75 with the vent; $50 for a new AC coil and condenser on an existing furnace and ductwork. | A homeowner may pull it for the home they own and live in when they do the work themselves. A hired installer needs a PPRBD mechanical contractor license (Mechanical Contractor B, Residential) and pulls the permit. | PPRBD schedule of individual residential mechanical and plumbing permits; Table C; PPRBD fee calculator Building permits come from the Pikes Peak Regional Building Department, a regional authority. County use tax is extra unless you sign the sales tax affidavit. The permit expires if no inspection is requested within 180 days. |
| Corpus Christi, TX | Under $150 | About $146.41 for a mechanical permit on a home of up to about 1,952 sq ft: the $0.075 per sq ft rate with the $146.41 minimum, read as the residential floor (our reading). The schedule does not say which floor area a stand-alone change out uses; if the city counts a 2,500 sq ft house, the fee would be $187.50. A new circuit adds an electrical permit. | Rate per square foot: $0.075 per sq ft for a residential mechanical permit, with a $146.41 minimum line that the page reads as the residential floor. The equipment's price does not matter, because Texas Local Government Code 214.907 bars value-based residential fees. | About $146.41 for a like-for-like change out of the A/C or furnace on the same reading, and $187.50 if a 2,500 sq ft house is counted. Portable units and replacing minor parts need no permit. | Yes, on a homestead: State law exempts AC work on your own home from licensing, and the city issues a homeowner mechanical permit with a notarized Homeowner's Work Affidavit that lets only the resident owner do the work. A new gas furnace connection needs a state-licensed plumber. | FY 2026 Development Fee Schedule (residential mechanical permit); Homeowner's Guide to Permitting; 2021 International Mechanical Code with local amendments; Texas Local Government Code 214.907 The schedule prints a $146.41 Minimum Permit Fee line under each trade permit, below the commercial row; the page reads it as the residential floor too, so confirm with Development Services. The 4.5% surcharge applies to the starred rate (about $7 on $146.41), a re-inspection after the second inspection is $117.13, and mechanical contractors pay a $135.00 annual registration fee. |
| Dallas, TX | $250 to $499 | $446 for a mechanical permit plus a plumbing trade for gas piping: $181 base + $250 for two trades ($125 each) + $15 technology fee. A gas furnace or new system on a mechanical permit alone is $321. A planned development, specific use permit or deed-restricted lot adds 10% of the permit fee. | Chapter 52 Table B-II sets a flat $181 per dwelling unit for alterations of single-family homes, and the fee schedule effective July 1, 2025 adds a $125 inspection fee per trade and a $15 technology fee. Texas law bars value-based residential fees. | $0, no permit, for a like-for-like swap of electric equipment (an AC condenser, heat pump or electric air handler) with no change in rough-in. A gas furnace replacement is a Residential Mechanical Permit at $321. | Yes on a homestead. Texas Occupations Code 1302.053 exempts a person working on a building they own solely as their home, and the city accepts it only for a homestead recorded with the appraisal district. Contractors need a TDLR license and DallasNow registration. | Chapter 52 Sec. 301.2.3 and Table B-II; fee schedule effective July 1, 2025; Texas Occupations Code 1302.053 New heating, cooling and duct systems need a duct blaster performance test and may need a certified third-party energy code provider, a private cost on top of the city fees. Plumbing and mechanical rough and final inspections must be scheduled together since June 1, 2026. |
| Denver, CO | Under $150 | $115 for a $12,000 heat pump or AC system ($35 for the first $2,000 plus ten times $8); $67 on a $6,000 furnace. A quick permit carries no plan review fee, and card payments add 2.5 percent. | Valuation table on the job's value: $35 for the first $2,000 plus $8 for each additional $1,000 or fraction of it, up to $25,000. Quick permits pay no plan review fee. | $67 for a $6,000 furnace replacement and $115 for a $12,000 heat pump or AC system. A permit is needed when the work disconnects a gas line, flue vent, refrigerant line or hot water line; a blower motor or control board repair needs none. | Limited: an owner-occupant of a one-family house who passes Denver's free homeowner mechanical or HVAC exam and applies by email; otherwise a Denver-licensed mechanical contractor. Duplex, townhouse and condo owners must use a licensed contractor. | Denver Building Code mechanical permit waiver for like-unit repairs; mechanical and boiler/AC quick permit lists; Denver valuation fee table A new outdoor unit needs no zoning permit if it meets the minor detached structure rules, including sitting at least 10 ft behind 75% of the street-facing facade width. Work started without a permit pays double, with a $100 minimum. |
| El Paso, TX | $150 to $249 | $200.05 before the technology fee for a furnace plus a 3-ton combination heating-cooling unit on line 551 ($110 + $24 + $47 + $19.05). The page says to confirm how the department bills a split-system condenser. | Itemized: a $110 mechanical base fee plus per-unit fees ($24 for a furnace or evaporative cooler; $47 plus $6.35 per ton for a combination heating-cooling or refrigeration unit), each plus a technology fee whose amount Schedule C does not state. | $134 for a like-for-like furnace or evaporative cooler change-out ($110 + $24); $176.05 for a 3-ton combination heating-cooling unit ($110 + $47 + 3 × $6.35). Portable equipment is exempt. | No. Mechanical permits go only to contractors licensed by the state and registered with the city; the homeowner affidavit says a homeowner may not obtain mechanical permits unless appropriately licensed. | FY 2027 Schedule C (mechanical base fee; line 551); City Code 18.10.040 exempt-work list; administrative code The air conditioner also carries an electrical permit item of $1.05 per ton on a $110 electrical base fee. Residential a/c conversion permits expire one month after issuance. |
| Fort Worth, TX | Under $150 ⚠ | About $56 for a 4-ton AC with an 80,000 BTU furnace: $33.08 application fee + $16.46 + $6.10 = $55.64, or $72.51 if the $16.87 technology fee is added. New wiring is a separate electrical permit, with a $6.10 item for a 3 to 5 ton AC plus the application fee. | Fee Ordinance 26-28781 (effective October 1, 2026): $33.08 application fee plus mechanical items by size. Furnace to 100,000 BTU $6.10, condensing unit to 2 tons $6.10, over 2 to 3 tons $10.34, over 3 to 5 tons $16.46, and added duct outlets $1.01 each ($6.57 minimum). | $39.18 for a 2-ton condenser alone ($33.08 + $6.10), a standalone mechanical permit. A 4-ton AC with a furnace is $55.64 to $72.51. Replacing a capacitor or blower motor needs no permit. | Yes at a primary residence. The homestead permit lets an owner-occupant pull a mechanical permit for their own home, shown by an appraisal-district homestead exemption or proof of ownership with matching ID. Otherwise only Texas-licensed (TDLR) contractors. | Fee Ordinance 26-28781; Administrative Code exemptions; residential permitting page and Nuts and Bolts brochure The reinspection fee is $66.15, and a permit expires after 180 days without an approved inspection. A simple change-out usually needs only a final inspection. Requests made before 6:30 a.m. are scheduled the same day. |
| Fresno, CA | $250 to $499 | About $377 to $381 for a furnace and AC change-out valued at $14,000: $316.47 on one permit ($177.89 + $111.50 + $27.08), plus about $37 General Plan surcharge on the item fees (about $41 if applied to the $27.08 issuance fee) and the $23.79 technology surcharge. If each is issued and charged an issuance fee separately the base is $343.55. | Flat fee per item: a cooling unit, evaporative cooler, air-handling unit or vent fan is a simple mechanical item at $111.50, and one simple permit covers any combination of simple items; a forced-air unit of any size is a complex item at $177.89, issued per item. Every stand-alone trade permit adds a $27.08 permit issuance fee. | $138.58 and up for an AC condenser or evaporative cooler ($111.50 + $27.08); $204.97 for a furnace ($177.89 + $27.08). No like-for-like exemption. The schedule also lists air conditioners and heat pumps as complex electrical apparatus ($296.90 up to 1 HP, $385.85 over 1 and up to 10 HP) and the page does not say whether a home condenser is billed there as well, so ask for an estimate. | Yes, with limits: the page's affidavit step has the Permit Affidavit Form carry the license or owner-builder declaration, and the city's permit affidavit cites Business and Professions Code 7044 (work done personally or with your own employees, principal residence of 12 months, no more than two structures in any three-year period). | Master Fee Schedule effective July 1, 2026 (simple and complex mechanical items; issuance fee); flexible ductwork bulletin; Permit Affidavit Form Replacing an existing flex duct system completely takes an alternate materials and methods request with added plan check fees, while 50 percent or less can be like for like; horizontal flexible duct is supported at intervals of 4 ft or less. The page says whether those rules apply is worth asking. |
| Honolulu, HI | $250 to $499 | $342 for a $15,000 multi-zone split system on an instant online permit. An $8,000 split system is $188. A central system on a permit with plans adds 20% of the permit fee for plan review. | Value of work under ROH 18-6.2: from $1,000.01 to $20,000 the fee is $12 plus $2.20 per $100, rounded up. An instant permit has no plan review fee and is paid by card. | $188 for an $8,000 split system on an instant permit. A plug-in window or portable unit needs no permit, and a fixed motor replaced with one of the same horsepower at the same location is exempt. | No for the electrical connection: it must be made by a Hawaii-licensed electrical contractor, and the owner-builder exemption excludes electrical and plumbing work. A heat pump water heater counts as plumbing, so a licensed plumbing contractor installs it. | ROH 18-3.1(a) and 18-3.1(b)(18), as amended by Ordinance 23-13; ROH 18-6.2; DPP's instant online permit list (Split System AC) A ductless split system at a single-family house or detached duplex usually gets its permit on the spot in HNL Build; central ducted systems and multi-family work need a building permit with plans. Each scope of work needs its own instant permit, so solar or an EV charger added with the AC is filed separately. |
| Houston, TX | Under $150 ⚠ | About $138 for a complete 5-ton system (cooling equipment, air handler and ducts): $11.41 per ton + $47 = $104.05, plus the $33.56 administrative fee. A 3-ton system is about $125 all in. An alteration of an existing system at 2% of a $6,000 job is about $201 with the admin fee. Electrical and gas permits are extra. | 2026 Building Code Enforcement fee schedule: complete system $11.41 per ton + $47.00; alteration of an existing system 2.0% of valuation + $47.00; $91.06 minimum; $33.56 administrative fee on top. | About $125 for a 3-ton system: $81.23 rounds up to the $91.06 minimum, plus the $33.56 admin fee. Every replacement needs a mechanical permit and inspection; the page finds no local exemption for a like-for-like swap. | Unclear. A TDLR Class A or B contractor registered with the city pulls it. The city guide says a homeowner may obtain the permit in some instances without listing them (Mechanical Section, 832-394-8850). | 2026 Building Code Enforcement fee schedule (HVAC fees); HPC Alteration of HVAC (HPWCODE 1019); Residential Permitting 101 New wiring needs a separate electrical permit from a registered master electrician and a new gas line a gas permit ($45.53 up to 4 openings) from a registered master plumber. Air-handling and duct systems fed from an external source are $6.04 per ton + $47. The inspection is completed the next business day. |
| Indianapolis, IN | $150 to $249 | $208 for a combined heating and cooling system in a 3,500 sq ft house: $185 up to 2,500 sq ft + $23 for the extra 1,000 sq ft. A furnace-and-AC replacement in a typical house is $185. A new circuit of up to 60 A is covered by the permit; a larger circuit needs a separate $169 electrical permit. | DBNS January 5, 2026 craft permit schedule, flat by structure size: $153 heating or cooling and $185 combined up to 2,500 sq ft, plus $23 per additional 1,000 sq ft. There is no application fee. | $153 for a heating system or a cooling system (a furnace alone, or an AC condenser and coil alone), $185 for both together. A like-for-like swap is not exempt. Reinspections are $175. | In part. Only an owner who also occupies a one- or two-family home, under Sec. 875-321, with written approval from the board that they have the skill, handled through a homeowner exam. Rentals do not qualify and contractors need a city HVAC license. | DBNS 2026 fee schedule; Sec. 536-201(b); Sec. 875-301 and 875-321 Electrical contractors may install all-electric equipment under an electrical permit at $146 heating, $146 cooling or $178 combined, but not the refrigerant work. Extending ducts and an identical water heater swap are exempt. A rough inspection covers ducts before they are covered. |
| Irvine, CA | $250 to $499 | About $427 for an AC system and a furnace replaced together: $359.60 in Schedule V items plus $31.88 issuance and $35.96 automation. The page priced the two as separate items on one permit and says the schedule does not state how a combined change-out is priced. | Itemized equipment fees on Schedule V, effective August 15, 2026: a residential air conditioning system $239.83 and a forced-air furnace up to and including 100,000 BTU $119.77, plus the $31.88 residential issuance fee and the 10% automation fee on the item fees (our reading of item 21). | About $164 for a furnace replacement and about $296 for an AC system replacement, each with issuance and automation fees. | Limited: Bulletin 222 says work on homes, pools and equipment such as water heaters and HVAC is permitted to a state-licensed contractor, with one very limited exception, an owner-builder, who signs the city's Property Owner's Package. PermitsDIRECT! accepts homeowner applications for eligible change-outs. | Schedule V and Schedule II item 21, effective August 15, 2026; PermitsDIRECT! Residential HVAC Changeout; Bulletin 222 (owner-builder exception) The online change-out permit needs a like-for-like unit in the same location, with the condenser at least two feet from any property line and no taller than 48 inches; a new or moved unit goes through IrvineReady! with a site plan. Where plans are reviewed, mechanical plan check is 30% of the mechanical permit fee with a $73.74 minimum. |
| Jacksonville, FL | $150 to $249 | $174 for a 5-ton AC ($55) with a 100,000 BTU gas furnace ($22), new ductwork ($17) and new gas piping ($80). Without the gas piping it is $94. Florida's 1% and 1.5% surcharges ($2 minimum each) are not included. | Ordinance Code Section 320.409 mechanical fees, itemized: AC $11 per ton for one to ten tons, furnace $22 for the first 200,000 BTU an hour, duct system $17 for the first 2,000 cfm, gas piping $80, with a $60 minimum per permit. | $60, the minimum, for a 3-ton heat pump swap ($33 of items), a mechanical permit. A gas furnace replacement needs a permit with inspection. A homeowner may ask to waive the inspection for an electric replacement of $5,000 or less, but the permit is still paid. | Yes. A homeowner may permit their own primary residence as an owner-builder if on the deed, appearing in person with proof of homestead exemption. Otherwise a heating, air conditioning and refrigeration contractor certified by the CTQB or the State. | Ordinance Code Section 320.409; Section 320.408(f)(8) inspection exemption; BID mechanical FAQ A failed inspection costs a $45 reinspection fee. A Manual J load calculation is required when the work adds new heated or cooled space. A notice of commencement is not needed under $15,000, and sealed engineering documents are not required for one- to four-family homes. |
| Kansas City, MO | Under $150 | $101.30 for a $12,000 furnace and AC replacement: $58 + 10 x $4.33. A $5,000 replacement is $70.99. A new circuit adds an electrical permit from $52, which is not included. New ducts and systems in an alteration must meet the 2021 energy code. | Section 18-20(b)(2) valuation table for 1-2 family homes: $52 up to $1,000, $58 from $1,001 to $2,000, then $58 plus $4.33 for each additional $1,000 or fraction. | $70.99 for a $5,000 AC or furnace replacement. Contractors replacing AC equipment in an existing system may use the LSR program (IB108) and self-certify instead of waiting for a city inspection; the page gives no separate LSR fee. | Yes at a single-family home. An owner who lives there may pull the mechanical permit and do the work personally with the IB146 affidavit; on a two-family home only licensed contractors may. Otherwise a city-licensed mechanical contractor. | KC Code Sec. 18-20(b)(2) valuation table; Sec. 18-16(b)(2); IB108 LSR program; IB146 LSR also covers duct extensions up to 10 ft and other work valued at $1,000 or less, and the LSR permit must be obtained within 7 days of starting. The mechanical contractor license covers the gas connection to a warm-air furnace burner. This page covers Kansas City, Missouri only. |
| Las Vegas, NV | $150 to $249 ⚠ | $202 for other mechanical equipment such as a new air handler: $102 plan check + $100 permit, plus a $2 technology fee; the page prices no whole new system. A new or different system needs a mechanical plan, a stand-alone mechanical plan check is listed at $171 per hour, and gas piping for 1 to 4 outlets is $102 + $95. | Flat trade fees in Table 3-D of the Building User Fees schedule dated July 1, 2021 (plan check + permit), by type of equipment; a stand-alone mechanical plan check is hourly. | $183 for an HVAC exact change-out ($83 plan check + $100 permit), issued online with no plans; exact swaps need a permit. Only filters and minor parts that do not alter the equipment's approval are exempt. | Yes for the owner's primary residence under NRS 624.031(5) with an approved Contractors Board affidavit. Anyone you pay must hold the right Nevada license, because the NRS 624.031(6) small-repair exemption does not apply to HVAC work. | Building User Fees schedule Table 3-D #14 and #15; homeowner guide mechanical exemptions; Online Permits List The 2024 Uniform Mechanical Code and 2024 International Energy Conservation Code apply to projects submitted on or after January 5, 2026. A permit lapses if no inspection passes within 180 days. |
| Long Beach, CA | $500 or more ⚠ | About $541 for a system over 33,000 Btu per hour that needs plan review: $100 minimum mechanical permit + $216 minimum plan check + $110 Title 24 energy plan check + $115 processing. A like-for-like express changeout is about $215. A new circuit is a separate electrical permit. | Mechanical Permit and Plan Check Fee schedule, itemized: $15 forced-air unit, $16 compressor, $22 air handler, $19 duct system, with a $100 minimum per permit and a $115 processing fee. Plan check is 100% of the permit fee with a $216 minimum, and energy plan check is $0.064 per sq ft with a $110 minimum. | About $215 for a split-system or furnace-only changeout: items of $53 round up to the $100 minimum plus the $115 processing fee. It is an express mechanical permit with no plans (up to 33,000 Btu per hour in total) and HERS verification. | Yes. A homeowner may pull the permit for a one- or two-family home that is their principal residence under IB-029, at an in-person express appointment. Online permits are limited to registered contractors with a city PIN. | Mechanical Permit and Plan Check Fee schedule; IB-058 items M1 to M6; IB-029; LBMC 18.04.020.F A computer-generated CF-1R and HERS verification are required for every changeout, and a HERS duct test applies to more than 40 linear ft of new ducts. Express service is not available in the Coastal Zone or a Historic District. Unpermitted work draws an investigation fee equal to the permit fee, with a $465 minimum. |
| Los Angeles, CA | Under $150 | $107.91 for a split system with an air handler and duct alteration ($24 AC + $24 air handler + $24 alteration items), an express HVAC permit with no plan check. The 3% and 6% surcharges are included and cards add 2.7%. A new circuit is a separate express electrical permit that the example does not include. | Per-item express permit from the LADBS Mechanical HVAC fee schedule: $24 AC compressor, $19 gas furnace, $24 air handler, $24 add or alter item, with an issuing fee above a $90 subtotal and 3% and 6% surcharges. The Permit Fee Calculator returns $65.95 for one item and $107.91 for two or more. | $65.95 for an AC change-out alone, a furnace alone or ducts alone, and $107.91 for furnace plus AC, filed as an express HVAC permit with no plan check. A new circuit is a separate electrical permit. | Yes. A C-20 contractor, or the homeowner after 12 months in the home, limited to two structures in three years under the owner-builder declaration. | LADBS Express Permits items 5, 6, 7 and 10; Mechanical HVAC fee schedule; LADBS Permit Fee Calculator The calculator prices a separate express electrical permit at $107.91 for a service and panel or $164.05 for a single circuit including its plan check line. A seismic or excess-flow gas shutoff valve is required on permits of $10,000 or more where the building has gas piping. |
| Louisville, KY | $150 to $249 ⚠ | $155 for a house with two systems, an upstairs and a downstairs zone: $105 for the first system + $50 for the second. A furnace and AC replaced together as one split system is a combination system at $105. The page does not say whether a new circuit is covered or needs an electrical permit ($75 up to $750 of work, $100 above). | LMCO 150.096 (revised February 6, 2024) flat residential fee: $105 for the first system and $50 for each additional system, where a system is heating, cooling or a combination. Manufactured fireplaces are $50 per unit. The fee does not depend on equipment price. | $105 for a furnace, AC or heat pump replacement, an HVAC Residential - Replacement permit with three inspections included. A ductless mini-split is also $105. A water heater is a $50 state plumbing permit, not an HVAC permit. | Unclear. Kentucky's licensing law exempts an owner working on property they own and occupy, but the page found no document saying whether Construction Review issues an HVAC permit to an owner; call (502) 574-3321 before a DIY install. | LMCO 150.096 (revised February 6, 2024); Kentucky Residential Code R105.2; KRS 198B.674 The state, not Metro, issues the water heater plumbing permit. The value-based table in the same schedule is for commercial work. Inspectors check the installer's license. |
| Miami, FL | $150 to $249 ⚠ | About $198 for a $20,000 two-system job: the $110 minimum (0.5% would be $100) + $40 application fee + $44 solid waste surcharge + $4 state surcharges. A $9,000 split-system replacement is about $180. A new circuit is a separate electrical permit ($110 + $40), and the Miami-Dade county surcharge is not included. | City Code 10-18 as amended: 0.50 of the estimated construction cost, read as one-half of one percent, with a $110 minimum, plus a $40 application fee, a solid waste surcharge of $0.22 per $100 ($26 minimum) and state surcharges of 1% and 1.5%. | About $180 for a $9,000 split-system replacement over $2,500 ($110 minimum + $40 + $26 + $4), a mechanical permit with inspection. Contracts up to $2,500, and coil, compressor or refrigerant-line replacement by a licensed contractor at any value, need no permit. | Yes. An owner-occupant of a one- or two-family home may file as owner-builder under Florida Statute 489.103(7), appearing in person. The coil, compressor and duct-repair exemptions apply only when a licensed mechanical contractor does the work. | City Code 10-5(b) and 10-18; City Code 10-20 (SAVE pilot); Florida Statute 489.103(7) The SAVE pilot halves city permit fees for qualifying energy-efficient HVAC and processes them in three business days, until February 12, 2027. A re-inspection costs $57. No sealed drawings are needed for a residential replacement. |
| Milwaukee, WI | $250 to $499 ⚠ | $319.24 for a new furnace, 3-ton AC and new ductwork in a 2,000 sq ft house: the HVAC permit is $192.64 ($55 + $60 + $50, plus the 1.6% surcharge and $25 processing) and the electrical permit at the $100 minimum is $126.60. A new 4-ton central AC alone is $96.12. | MCO 200-33-23 flat per-item fees: heating unit $55 up to 150,000 BTU (plus $25 per extra 50,000), AC $60 up to 3 tons (plus $10 per extra ton), ductwork $2 per 100 sq ft with a $50 minimum, plus a $25 processing fee and DNS's 1.6% surcharge. | $80.88 for a like-for-like 80,000 BTU gas furnace ($55 + $0.88 + $25). A straight electric condenser swap is unclear: the code exempts non-gas appliances but the DNS checklist says an AC needs a permit, so call the Permit and Development Center. | Yes. DNS lets owners who live in the home pull permits for their own work. The city requires a Home Improvement Contractor License of contractors doing heating and cooling at 1-2 family homes, and any new wiring needs a licensed electrical contractor. | MCO 200-33-23; MCO 200-24-1.5-f-4; DNS checklist Plan review is not needed for equipment replacement, AC-only systems or duct alterations costing $10,000 or less. Condensers must sit in side or rear yards outside the required setbacks. Work must start within 180 days of issue. |
| Minneapolis, MN | $150 to $249 | $217.60 for a whole new heating and cooling system at an existing 1-2 family home, Level 3: $216.60 + a $1 state surcharge. Level 3 also covers extending the system into unconditioned space or seven or more supply or return openings. New homes and additions pay 1.99% of the mechanical contract value. | Mechanical permit application, three flat levels for existing 1-2 family homes plus a $1 state surcharge: Level 1 $84.20, Level 2 $132.40, Level 3 $216.60. New homes and additions: 1.99% of the mechanical contract value with an $84.20 minimum. | A central AC or heat pump replacement is Level 1 at $85.20. A furnace or boiler change-out is Level 2 at $133.40, and a furnace and AC together cost the same $133.40 because Level 2 includes Level 1 work. | In part. An owner who lives in a single-family home can do their own mechanical work under Section 85.80, but not on gas-fired heating equipment. All gas piping and venting needs a licensed gas installer on a separate permit. | Minneapolis mechanical permit application fee levels; Minnesota Rules 1300.0120; Section 85.80 On a complete system replacement in an older home the inspector may first check the old heating plant for asbestos. New fuel-burning equipment needs an ORSAT heat test record, heat loss calculation and operating manual on site, and concealed or attic ductwork needs a rough-in inspection with duct blaster results. |
| Nashville, TN | Under $150 ⚠ | $129 for two systems, two 80,000-Btuh furnaces and two 3-ton condensers: three extra appliances at $11 = $33, plus 232,000 Btuh as three blocks at $32 = $96. A furnace and AC replaced together is the $75 minimum. | Metro Code 16.16.400: $11 for each residential appliance beyond the first plus $32 per 100,000 Btuh, or fraction, of total input, with a $75 minimum per permit; $11 for a gas meter connection and $50 for underground fuel piping. | $75, the minimum, for a gas furnace and 3-ton AC condenser changed together (116,000 Btuh). A 3-ton heat pump with air handler is $11 + $32 = $43, raised to the $75 minimum. Repairs need no permit. | Unclear. Licensed contractors file online in ePermits; anyone who is not a licensed contractor applies for a trade permit at the department, and the page says to ask Permit Issuance whether a homeowner gas/mechanical permit is available. | Metro Code 16.16.400; Metro permit list; Codes 2026 permitting process sheet A new circuit or disconnect is a separate electrical permit with a $75 minimum. A failed inspection costs $50 to re-inspect. Since January 1, 2026, plastic pipe venting a gas appliance must be listed and labeled to UL 1738. |
| New Orleans, LA | Under $150 ⚠ | $73 for a 4-ton condenser with a 60,000 BTU gas furnace: $15 + $3 for the condenser, $25 for the furnace and the $30 application fee. A 3-ton condenser replaced alone is $45. Gasfitting and electrical permits are billed separately. | Itemized equipment fees: a $30 application fee, $15 per new A/C or heat pump unit plus $3 per ton over 3 tons, and $20, $25 or $35 per air handler or furnace by BTU rating. | $45 for a 3-ton condenser replaced alone ($15 + $30); $73 with a 60,000 BTU gas furnace. A like-for-like replacement still needs the HVAC permit. | Licensed contractor only: only a contractor with a Class A City of New Orleans Mechanical A/C license can apply, and homeowners cannot pull the permit even for their own house. | City Mechanical A/C Permit Application (Supplement D.1); Safety and Permits mechanical permit page Outdoor units must be at least 2 feet from the interior side or rear lot line and screened when visible from the street. The permit stays valid through 6 months of inactivity. |
| New York, NY | $150 to $249 ⚠ | About $156 in DOB filing fees for a $15,000 central or split system at a 1-3 family home, filed as an Alteration with the Mechanical Systems work type: the $130 minimum covers the first $5,000, plus $2.60 per additional $1,000. A $25,000 rooftop unit in a building under seven stories files at about $452. The PE or RA's fee is separate. | DOB filing fee under Admin. Code Table 28-112.2 (as amended by L.L. 128 of 2024): $130 minimum for the first $5,000 at a 1-3 family home, then $2.60 per $1,000. Other buildings under 7 stories: $225 for the first $3,000, then $10.30 per $1,000. | $0, no filing, for a packaged AC up to 5 tons in a 1-2 family home or up to 3 tons in any existing building, window units included. A central or split system is filed: $130 minimum, about $140 for a $9,000 job. A boiler or furnace is filed by the licensed trade. | No. A PE or RA files in DOB NOW: Build, the permit goes to a Registered General Contractor, and a DCWP Home Improvement Contractor license is added in 1-4 family homes. A new circuit needs a licensed master electrician. | 1 RCNY 101-14 Tables 1 and 2; Admin. Code Table 28-112.2 (L.L. 128 of 2024); DOB NOW mechanical filing guide NYC has no HVAC contractor license, and the page calls the PE or RA fee to prepare the filing the larger cost; ask for the two to be priced apart. The Energy Conservation Code and asbestos rules for buildings before April 1, 1987 apply even where the mechanical filing is exempt. |
| Orlando, FL | $150 to $249 | $193.20 for a $12,000 heat pump system: $187.57 plus a $5.63 technology surcharge. The page prices the mechanical permit alone; electrical work for a new circuit is not priced. | Mechanical permit on construction cost, including owner-furnished equipment: $66.24 for the first $1,000 plus $11.03 for each additional $1,000 or fraction up to $25,000, then $8.28 per $1,000, plus a 3% technology surcharge. | $147.75 for an $8,000 AC change-out ($143.45 plus $4.30 technology surcharge). Every change-out of an air conditioner, heat pump, air handler or furnace needs a mechanical permit. | Yes: an owner-builder on his or her own one- or two-family home under Florida Statutes 489.103(7) signs the Owner/Builder Declaration in person, and the Mechanical Inspection Affidavit can be signed by an owner-builder. | City 2026 residential fee schedule; Mechanical Permit Application; FS 713.135; FS 489.103(7) A change-out under $15,000 needs no Notice of Commencement; other mechanical work over $5,000 outside a building permit needs a recorded notice before the first inspection. A failed inspection adds $150. Mechanical work is excluded from the state exemption for jobs under $7,500. |
| Philadelphia, PA | $250 to $499 | About $267 for a full system replacement: $189 flat for ductwork including its appliances + $7.50 surcharges = $196.50, plus an electrical permit for the new circuit at its $63 minimum + $7.50. The $100 filing fee is credited toward the permit. | L&I construction fee summary, flat rates for 1-2 family homes: $69 per appliance, $189 flat for ductwork including appliances, $189 flat for fuel gas piping, plus $3 city and $4.50 state surcharges on every permit. Electrical is $25 per $1,000 with a $63 minimum. | $76.50 ($69 + $7.50) for a straight furnace, condenser, air handler or heat pump swap, an EZ mechanical permit with no plans. A swap that extends the gas piping uses the $189 flat fuel gas line. | No. There is no homeowner mechanical permit: a licensed contractor performs all work, sheet metal goes to a registered technician, and a licensed electrical contractor pulls the electrical permit. | L&I construction fee summary (July 2026, effective October 1, 2026); EZ Ductwork and Warm-Air Appliances standard PB_029 A Manual J load report, Manual S equipment selection and a Duct and Envelope Testing form go to the inspector. The page says the July 2026 fee summary keeps the same mechanical rows as January 2025. Boilers are also regulated by the Pennsylvania Department of Labor and Industry. |
| Phoenix, AZ | $500 or more | About $534 for a rooftop unit that needs new structural support, valued at $6,600 in the Miscellaneous Construction guide: Table A permit fee $267 + 100% residential plan review $267. A $4,500 furnace or AC replacement is $243 with no plan review under $5,000. A higher contractor invoice sets a higher fee. | Table A of the 2026 Development Fee Schedule (Appendix A.2, effective January 20, 2026) on a valuation: $195 for the first $1,000 + $12 per additional $1,000 or fraction. Residential plan review is 100% above $5,000 when plans are reviewed. | $0, no permit, for an outdoor unit of 5 tons or less replaced in kind in the same spot at the same or lower weight. An indoor furnace, air handler or attic unit is a mechanical permit: $243 on the $4,500 city valuation. | In part. Permitted mechanical work may be done by an owner-occupant of a single-family home on their own house, but the page lists gas furnaces and gas lines as licensed trade only and the state small-job exemption never covers gas connections. | 2026 Development Fee Schedule Table A; Miscellaneous Construction guide valuations; 2024 PBCC 105.2 Mechanical item 8; Permit Guide TRT 00823 A new evaporative cooler is $207 on a $2,000 valuation. Work started without a permit draws an investigation fee of at least $250 plus a doubled permit fee. Emergency replacements may start first with the application filed within 72 hours. |
| Pittsburgh, PA | $250 to $499 ⚠ | $333 for a $20,000 heat pump system that also needs a new circuit: $141.50 mechanical + $50 zoning review + $141.50 electrical. An $8,000 condenser replacement is $191.50 and a $6,000 furnace is $141.50. | PLI 2026 residential base fee of $6.00 per $1,000 of construction value, $130 minimum, plus a $4.50 state training fund fee, a $5.00 digital record retention fee and a $2 technology fee at the minimum. Zoning review adds $1.00 per $1,000, $50 minimum, for exterior equipment. | $141.50 for a $6,000 furnace, an EZ mechanical permit with no plans issued within one business day. Replacing an outdoor AC or heat pump in the same spot adds zoning review, about $191.50 for an $8,000 job. | Unclear. PLI's licensing rules require a city HVAC or Mechanical trade license to replace any mechanical system, in practice a licensed contractor, but its EZ page lists homeowners at a primary residence among those who may do residential EZ work; confirm with PLI. | PLI 2026 fee schedule; PLI mechanical permit and EZ pages; City Code 1002.02 Outdoor units within 5 ft of a side lot line must be screened to stay EZ eligible, and a front-yard unit or a home generator needs a standard permit. Wiring a new outdoor unit is a separate electrical permit. Emergency replacements may be made first if the application is filed by the next working business day. |
| Portland, OR | $500 or more | About $522 for a furnace, heat pump, AC, gas line, dryer vent and bath fan: line items total $292, or $327.04 with the 12% surcharge, plus a $194.88 electrical permit for the new circuit. A heat pump install with its circuit is about $382. | 2026 mechanical schedule, per item for one- and two-family work: furnace $91, heat pump $84, AC or air handler $44 each, gas piping up to 4 outlets $25, alteration $51, with a $167 minimum fee and Oregon's 12% surcharge. Electrical is $174 for the first branch circuit. | $187.04 for a like-for-like gas furnace: the $91 line is billed at the $167 minimum plus the 12% surcharge. A heat pump or AC also needs an electrical permit, so a ducted heat pump replacing a furnace is about $382. | Yes for the mechanical permit: the recorded owner, not an LLC. The new circuit is stricter: the owner may wire it only in a home they own and live in and are not selling or renting within six months, otherwise a licensed contractor pulls it. | PP&D 2026 mechanical and electrical fee schedules; Development Hub PDX permit pages Reinspections are $167, and work started before the permit draws an investigation fee of at least $167. A site plan is required for AC and heat pump lines. Permits issue within 24 hours of payment and expire after 180 days without an inspection. |
| Raleigh, NC | $250 to $499 ⚠ | About $258 for an HVAC New Install: a mechanical permit and an electrical permit at $129 each (the $124 minimum with the 4% technology fee). The page prices no system size or value. A new system serving previously unconditioned space is part of a residential alteration and also needs a placement sketch. | Minimum permit fee of $124 per trade: the guide lists stand-alone HVAC fees only for commercial work and charges anything not specifically listed at the minimum. | About $129 for a like-for-like changeout: one HVAC Changeout permit covers the mechanical and electrical work ($124 minimum with the 4% technology fee), and state law limits a licensed contractor's complete appliance replacement to the cost of one trade permit. | A homeowner without a trade license may apply for the permit on their own home by filing the notarized Owner Exemption Affidavit, submitted to the city by email; the affidavit commits the owner to occupy the home for twelve months. Otherwise your licensed heating and air contractor files, registered in the Permit and Development Portal. | G.S. 160D-1110; FY27 Development Fee Guide (July 1, 2026 to June 30, 2027) minimum permit fee; HVAC Changeout and HVAC New Install permit types A failed or not-ready inspection costs $127 per trade to repeat. An outdoor unit may sit in a required side or rear setback if it stays at least 3 feet from the lot line (UDO 1.5.4). |
| Riverside, CA | $150 to $249 ⚠ | About $229 for a 4-ton unit, furnace and duct alterations: $78 + $49 + $33 + $41 = $201, plus the 14% surcharge. A 3-ton AC condenser and furnace change-out is about $158. A new disconnect or circuit is a separate electrical permit, not included. | Itemized equipment fees: AC units $49 for 0 to 3 tons and $78 for 3 to 50 tons, furnaces and air handlers $49 each, duct alterations $33, plus a $41 issuance fee and the 14% surcharge. | About $158 for a 3-ton AC condenser and furnace change-out; the page gives no AC-only total. | Conditional: the owner as owner-builder where the counter allows it for the permit type, after signing the Property Owner Package; otherwise a CSLB-licensed contractor with a City of Riverside business license. | Mechanical equipment lines, FY 2026/27 Schedule of Fees and Charges (effective July 1, 2026); Bulletin 140 (August 4, 2026) Title 24 energy compliance forms, HERS registered, are generally required for HVAC alterations. A reinspection costs $98. The electrical permit for a new disconnect adds its own items, such as $10 per dedicated circuit, and its own issuance fee. |
| Sacramento, CA | $250 to $499 | About $254 for a $20,000 heat pump system pulled by a contractor: $175 flat + $17.50 technology surcharge + $52 General Plan fee + $1 green building fee + $8 business operations tax. A cut-in of a system where none existed uses the same permit. HERS rater fees are separate and are not city fees. | Table B.1 (effective July 19, 2025) flat $175 HVAC minor permit with no plan review, plus a technology surcharge of 10% of the permit fee, a General Plan fee of $2.60 per $1,000 of job value, a green building fee of $1 per $25,000 and a business operations tax when a contractor holds the permit. | About $214 for an $8,000 furnace and AC change-out pulled by the owner-builder: $175 + $17.50 + $20.80 + $1 = $214.30, a minor permit with no plans and a virtual inspection. | Yes. Homeowners can pull a residential HVAC change-out online for a single-family home or duplex. State law exempts a homeowner from licensing on a principal residence lived in for the 12 months before completion, with the work done before sale. | Table B.1 (effective July 19, 2025); Public Permit Portal minor HVAC permit; CEC HERS guidance A condenser moved to a new spot needs Planning Express sign-off and must be screened from street views, and rooftop units need Planning review. The city's average-cost page lists $225 for a change-out or new unit. Minor HVAC permits are for one- and two-family homes only. |
| San Antonio, TX | $150 to $249 | About $164 for the first central systems in a two-zone house: $88.55 + $63.25 = $151.80, or $163.94 with the two 4% surcharges, inspection included. A split system with a gas furnace is $82.92, or $89.55 with surcharges. Electrical and gas permits are separate. | DSD FY 2027 Development Fee Schedule: $57.50 base on existing homes plus $7.19 per condensing unit, coil, air handler or heat pump and $11.04 per gas furnace. The first new central system is a flat $88.55, each additional $63.25, and duct outlets are $2.30 each. | $71.88 for a heat pump and air handler change-out ($57.50 + $7.19 + $7.19), or $77.63 with the two 4% surcharges; a condenser, coil and gas furnace is $82.92. Replacing equipment needs a mechanical permit even like for like. | No. DSD says homeowners must use licensed trade contractors for HVAC work. The contractor needs a Texas mechanical license registered with the city and lists the SEER2 rating on the application. | DSD FY 2027 Development Fee Schedule (revised September 2026); City Code 10-6 Starting work before the permit is issued doubles the permit fee. A failed inspection costs $57.50 to re-inspect, paper applications add $11.50 and card payments add 3%. |
| San Diego, CA | $250 to $499 | $308.09 for a full split-system change-out, furnace plus condenser ($176.57 + $131.52), as a Simple Permit. A heat pump package unit or the first mini-split head is $176.57, and each added head $52.39. With no plan review, the $737 General Plan Maintenance Fee and $12.16 mapping fee do not apply. | Information Bulletin 103 Table 1B prices residential mechanical work per item: condensing unit $131.52, furnace or forced-air unit $176.57, heat pump package unit $176.57, each added air handler or head $52.39, exhaust fan $105.98. | $131.52 for the condensing unit alone and $176.57 for a furnace or forced-air unit, a no-plan Simple Permit applied for online. A furnace plus condenser is $308.09. In-place repairs, controls and recharging need no permit. | Yes. SDMC 129.0406 allows the permit to go to a licensed contractor or the property owner or lessee. The owner signs Owner-Builder Verification Form DS-3042 and normally receives it in two business days; tenants cannot sign the form. | Information Bulletin 103 Table 1B; SDMC 129.0402(b), 129.0404 and 129.0406 A HERS rating by a certified independent rater is required for major HVAC changes and for more than 40 ft of new duct. Equipment over 400 lb needs structural calculations, and a building permit if the structure is altered. Records fees are non-refundable, so small add-ons may appear on the invoice. |
| San Francisco, CA | $500 or more | About $595 for a heat pump converting a furnace, with its electrical permit: Category 1M mechanical $290 + $305 for up to 10 devices. The page calls it roughly $740 if the wiring runs past 10 devices. A building of 2 to 6 units pays Category 2M at $420. | DBI Table 1A-C flat categories for permits issued on or after July 12, 2026: Category 1M $290 for a furnace, hydronic system or heat pump in one residential unit, 2M $420 for 2 to 6 units, $519 per hour for work outside the categories. Electrical is Table 1A-E: $305 up to 10 devices. | $290 for a like-for-like furnace swap in one home, a Category 1M mechanical permit with up to two inspections. A new gas line adds a plumbing permit and a new circuit an electrical permit. | In part. A homeowner may take a mechanical permit only for a stand-alone single-family house they own and only for work they do themselves, and an inspector at the Permit Center may require a contractor instead. Condo and flat owners must use a licensed contractor. | DBI Table 1A-C (mechanical) and Table 1A-E (electrical), July 12, 2026; DBI mechanical permit worksheet Plumbing and mechanical need separate permits, so a new gas run to a furnace adds a plumbing permit. Re-inspections are $259 per half hour. New exterior equipment that needs a building permit also needs plans, and the page says DBI does not define exactly which installations cross that line. |
| San Jose, CA | $500 or more ⚠ | Roughly $840 for a full system replacement with new wiring: a $315 mechanical permit + $211 processing + a $315 electrical permit for the new circuit. The page says the online checkout shows the exact total, before any itemized adjustment. | FY2026-27 Schedule of Fees and Charges: $315.00 per hour of required inspection time, with miscellaneous mechanical permits at the greater of a $315 per hour minimum or the itemized amount. A $211 (1.0 hour) permit processing line applies when the permit is filed at the counter. | About $315 for a furnace or condenser change-out that passes in one inspection, or about $526 with the $211 processing line on a counter-filed permit. Furnace, AC and heat pump change-outs are online permits with no plans. | Yes. A homeowner improving a principal residence occupied for 12 months may pull the permit as owner-builder and do the work personally; any hired installer must be state-licensed for jobs of $1,000 or more. | FY2026-27 Schedule of Fees and Charges (effective July 1, 2026); SJMC 24.02.100 and 24.02.140 A new AC or heat pump circuit is an electrical permit at the same $315 minimum. Work done without a permit is charged two times the plan review and inspection cost. Equipment in the rear setback keeps 5 ft from the rear line. |
| Seattle, WA | $250 to $499 | About $396 for a job that needs all three permits: SDCI mechanical $63.37 + SDCI electrical for a new 30 to 50 A circuit and back-up heat about $168.63 + a Public Health gas piping permit $164 ($137 + $27 for one outlet). A heat pump alone is about $232 and a gas furnace with new gas piping about $227. The page says a three-permit job lands near $400. | 2026 Fee Subtitle Table D-8: $60.35 per furnace, heat pump or other heating unit, including attached ducts and burners, plus the 5% technology fee. Electrical is itemized from Table D-15 with a $105.12 online minimum; gas piping is Public Health's $137 + $27 per outlet. | $63.37 for a furnace swap on the existing circuit and gas line ($60.35 + $3.02 technology fee), an online mechanical permit. No electrical permit is needed if the circuit is unaltered and no gas permit if the gas line is untouched. | Yes. SDCI's mechanical pages do not restrict who applies. The electrical permit goes to a licensed electrical contractor or the owner-occupant doing the wiring, and gas piping to a registered contractor or a homeowner doing the work. | 2026 Fee Subtitle Tables D-8, D-15 and D-2; Seattle Electrical Code 80.50(B)(4); Public Health Seattle and King County 2026 fee schedule Ductwork permitted on its own is priced on value (Table D-2) plus a one-hour $292 review minimum. The gas piping permit is King County's, not SDCI's. Mechanical plans reviewed with a building permit carry no additional mechanical fee, and mechanical permits are valid for 18 months. |
| St. Louis, MO | $150 to $249 ⚠ | $190 for a furnace and condenser billed as separate items ($25 application + $40 + $40 = $105) plus an $85 electrical permit ($25 + $60) for a new circuit; the page says a furnace swap with a new circuit runs about $150 to $190. Billed as a combination unit the mechanical permit is $65. | Ordinance 70800 residential mechanical fee table: a $25 application fee on every permit plus $40 per furnace, $40 per condensing unit or $40 for a combination furnace and condensing unit. Failing to request an inspection costs $50, and a faulty-work re-inspection is $25. | $65 ($25 + $40) for a furnace only, a condensing unit only or a matched system billed as a combination unit; $105 if the city bills the furnace and condenser separately. Replacing a minor part needs no permit. | In part. Only the owner-occupant of a single-family dwelling under the Homeowners Permit exception, who shows the Mechanical Equipment Inspection Section enough knowledge to install the system and holds EPA Universal Technician certification if refrigerant is handled. | Ordinance 70800 residential mechanical fee table; Mechanical Code 106.1 and 106.2; electrical fee table A new circuit or disconnect is a separate electrical permit by a city-licensed electrical contractor or a tested owner-occupant. The Building Division's pages do not say which permit covers a residential gas connection or what new ductwork costs, so ask the Mechanical Section. Cards carry a 2.55% fee. |
| St. Paul, MN | $150 to $249 ⚠ | About $170 for a $6,000 central air installation: refrigeration at 1% of value would be $60, so the $85 minimum applies, plus the $85 electrical permit, before surcharges. A gas furnace replacement under 100,000 BTU input is about $255 ($85 warm air + $85 gas burner + $85 electrical). | Itemized trade permits: warm air $85 for the first 100,000 BTU per hour plus $15 per additional 100,000; gas burner $85 plus $15 per additional 100,000 with a $1,007 maximum per burner; refrigeration 1% of value, $85 minimum; electrical $15 per unit on its own circuit, $85 minimum. | About $170 for a central AC change-out ($85 refrigeration minimum + $85 electrical) and about $255 for a gas furnace under 100,000 BTU input, before state surcharges. DSI publishes no combined total. | Limited. An owner may pull the permits only on a single-family home they own and legally homestead with Ramsey County, or the half of a duplex they live in, doing the work themselves with DSI's homeowner affidavit. Everyone else needs a contractor licensed by the City of Saint Paul. | Legislative Code Section 33.04; DSI warm air, gas burner, refrigeration and electrical fee pages; DSI furnace requirements sheet DSI's electrical page also lists a Warm Air/Ventilation permit for AC installs, which would add $85 or more; ask the warm air office. A furnace replacement needs a whole-house heat loss calculation, with heating equipment oversized no more than 40 percent and cooling no more than 15 percent. |
| Stockton, CA | $150 to $249 | $183 for a new or replaced HVAC system: the flat HVAC - Commercial & Residential line, with no equipment or size breakdown. If the 7.5% technology fee and the 6% Community Rating System fee applied to it they would come to $13.73 and $10.98; the page says the schedule does not say whether they are added to flat fees. | Flat non-valuation line: HVAC - Commercial & Residential at $183.00 in the FY 2026-27 Adopted Fee Schedule effective July 1, 2026. A water heater is a separate permit at $78.50. | $183 for a like-for-like change-out: a permit is required for a changeout and for replacing a furnace, coil, FAU or condenser, and a like-for-like swap of the outdoor condenser counts. A CF1R-ALT-02-E must be registered with an ECC provider before applying. | Yes: the property owner with a completed Owner/Builder form, or a California licensed C-20 contractor with a current City of Stockton business license, plus an authorization letter for whoever picks up the permit. The page states no residency period or limit on owner permits. | FY 2026-27 Adopted Fee Schedule effective July 1, 2026 (HVAC - Commercial & Residential); Residential HVAC Requirements handout (BLDG-0048) Adding or replacing more than 25 ft of ducting needs a permit, new or replaced ducts in unconditioned space need at least R-8 insulation, and plans are required for new units on a roof or in an attic. A re-inspection is $195 an hour, and unpermitted work is charged a double permit fee. |
| Tampa, FL | $150 to $249 ⚠ | $248.00 for a change-out where the city also requires an electrical trade permit for wiring changes (the page says to ask): a $124.00 mechanical permit plus a $124.00 electrical permit. The change-out alone is $124.00. The page gives no equipment size or job value because the fees are flat. | Flat residential HVAC equal change-out fee ($120) on the Trade Permit Fee Schedule, plus the 2.5% Florida Building Permit Surcharge with a $4.00 minimum, so $124.00; an electrical trade permit, if the city requires one, is another $124.00. | $124.00 for a like-for-like change-out: $120 plus the surcharge at its $4.00 minimum, with no plans, no plan review and one final inspection. | Yes. A licensed mechanical or air-conditioning contractor, or an owner-builder on the owner's own home under Florida Statutes 489.103(7); an owner cannot subcontract the mechanical work on the owner's own permit. | Trade Permit Fee Schedule (HVAC equal change-out); City Code 5-105.2(4); Florida Statutes 489.103(7) A failed inspection costs $120 plus the surcharge ($124.00) to re-inspect. A Notice of Commencement is required for contracts over $5,000, except a contract to repair or replace an existing heating or air-conditioning system for less than $15,000. |
| Tucson, AZ | $150 to $249 | About $219 for a system replacement plus a new electrical circuit: $150 first item + $50 additional item + the 1% digital filing fee ($18.54 minimum). Ductwork not on the trade list may be assigned a valuation instead, so the page says to ask for an estimate if the ducts are rebuilt. | PDSD fee schedule effective July 1, 2026: a flat trade permit. The Air Conditioner or Heater Repair or Replace item is $150 and covers up to two units (half an hour of review and two inspections included), each additional item is $50, plus a 1% filing fee with an $18.54 minimum. | About $169 for an AC or furnace replacement, or both together: $150 + $18.54, one trade permit item. Load and sizing calculations are required for replacement equipment too. A same-size evaporative cooler swap needs no permit outside preservation zones. | Yes. A homeowner can file the Owner/Builder Affidavit for a home they own and occupy under A.R.S. 32-1121.A.5, and rentals need a licensed contractor. PDSD notes a licensed HVAC contractor must ensure code compliance, so most are filed by the installer. | PDSD fee schedule effective July 1, 2026; load and sizing calculation requirement; PDSD Policy 2025.01-IE Extra review or inspection time is billed at the hourly rate. Residential trade permits run in the same-day Express Lane. Switching between propane and natural gas needs a permit and inspection. |
| Tulsa, OK | $150 to $249 | $198 for a full system with new ductwork and a new electrical circuit: $35 heating appliance + $47 refrigeration + $35 ducts + $81 electrical, before the $5 surcharge and other add-ons. | Itemized mechanical fees in Title 49 Section 501: $35 per heating appliance, $47 for refrigeration or a chiller, $35 for duct systems and other equipment, $18 per exhaust fan or vent, and gas piping at $41 per meter plus $2.68 per opening, with an $80 minimum for any permit. | $82 for a furnace plus AC condenser swap ($35 + $47). A furnace alone is $35, or $80 on a literal reading of the $80 minimum for any permit; the page says to ask the Permit Center. | No. Mechanical permits are issued to licensed contractors registered with Development Services, and only licensed mechanical or plumbing contractors may install or repair gas piping. The city's forms page says only a licensed tradesperson may apply for trade permits. | Title 49 Section 501 (mechanical fees) and Section 404 (electrical HVAC unit line); Section 103 and Section 117 add-ons The electrical permit's HVAC unit line is $81 plus $11.89 for each additional unit. Every permit also carries the $5 system surcharge and a system development fee of $5.50 plus 8 percent of the permit fee. |
| Virginia Beach, VA | $150 to $249 ⚠ | About $187 for a $12,000 gas furnace and AC replacement: mechanical $110.00 + $2.20 levy + $10.00 = $122.20, plus a gas permit for one appliance $54.00 + $1.08 + $10.00 = $65.08. An $8,000 heat pump replacement with a refrigerant change is about $102. | Mechanical permit $50 plus $5 per $1,000 of construction value ($90 up to $8,000, $110 up to $12,000); gas permit $50 plus $4 per outlet or shutoff. Each permit adds a 2% state levy and a $10 technology fee. | $0, no mechanical permit, for a like-for-like electric AC or heat pump swap on the same refrigerant in the same place. A gas or oil furnace is never like-for-like: about $187 with its gas permit on a $12,000 job. A refrigerant change on an $8,000 heat pump is about $102. | Yes. The city lists what an owner provides: name, address, approximate cost of materials, signature and any related permit number. A mechanical contractor files with a Class A, B or C registration number and the registered master tradesman's signature. | City mechanical and gas fee schedules; city mechanical permit rules (like-for-like exception); Virginia USBC 108.2 The mechanical schedule also lists a $50 plan review fee under Other Fees; the city does not say when it applies, so the totals leave it out. A failed inspection costs $75 and starting without a permit adds $250. |
| Washington, DC | Under $150 | $79.20 for a new 3-ton AC unit under the mechanical Instant Permit ($50.60) plus a gas furnace replacement under the gas Instant Permit ($28.60). If the electrician also pulls an electrical permit for the AC circuit, add $71.50, for $150.70 in all. The page gives these figures for scale only. | Itemized per piece of equipment, each line plus the 10% technology fee: mechanical Instant Permit for one new AC unit or one repair up to 10 tons, $46 ($50.60); gas Instant Permit for one gas appliance, $26 ($28.60); electrical permit for central AC up to 5 tons, $65 for the first ($71.50). | $50.60 to install or replace one AC unit up to 10 tons (Mechanical Instant Permit) and $28.60 to replace a gas furnace (Gas Fitting Instant Permit), $79.20 for both. A window or portable unit needs no permit. | No. Only a DC-licensed master mechanic, master plumber/gasfitter or master electrician can apply for the matching trade permit, and DOB's Homeowner's Center states that homeowners cannot apply for trade permits. | DOB fee schedule (mechanical, gas and electrical lines, plus 10%); 2017 DC Building Code 105.2 and 105.4.3; DOB Mechanical and Gas Fitting Instant Permits Repairing or replacing the ductwork of a single HVAC system is a building Instant Permit at $36.30. DC's code ties a trade permit to a building permit unless the code official decides otherwise (105.4.3), so your contractor will tell you whether a building permit is also needed. |
| Wichita, KS | Under $150 | $50 for a furnace and AC changeout together: $14 for the furnace + $11 for an air conditioner of 5 tons or less + the $25 permit issuance fee. An AC alone is $36 and a furnace alone is $39. | Itemized by appliance on mechanical fee Table K (forced-air furnace up to 2,000 cfm $14; air conditioner of 5 tons or less $11; residential boiler $19), plus a $25 permit issuance fee on every permit. | $36 for an AC condenser and coil alone, $39 for a furnace alone and $50 for both. Window units, portable cooling units and self-contained systems with 10 lb of refrigerant or less are exempt. | A licensed MABCD mechanical contractor, or the owner-occupant of a detached single-family home who buys all materials, does all the labor, passes a simplified open-book exam and submits a plan of the installation. Owners who rent the home out must use a licensed contractor. | MABCD mechanical fee Table K and the permit issuance fee; Unified Building and Trade Code; 2024 International Mechanical Code as amended locally Table K has no heat pump line, so the page says to ask how a heat pump is itemized. A water heater is a plumbing permit at $9 plus $25. Mechanical work in a one- or two-family remodel is covered by the building permit unless it starts more than 180 days after that permit was issued. |
The status is the band of the city's own worked example for a new central system or a full replacement, the larger job the page prices rather than a simple swap: the total the page states, including every city fee the example bundles (the mechanical permit, plan review, surcharges, and the electrical or gas permits where the page adds them). The job differs by city and the cell says what it is: a rooftop unit that needs new support in Phoenix, a whole new system with ductwork valued at $10,000 in Cincinnati, a system that needs plan review in Long Beach, a heat pump with its circuit in San Francisco and Pittsburgh, a $20,000 heat pump system in Sacramento, and a furnace and AC replaced together in Kansas City and Indianapolis. A lower or higher figure the page gives only for another job is noted in the cell, not used. Contractors' prices, engineers' and architects' drawing fees, HERS raters and utility charges are never included. The swap column reports what the page says a like-for-like furnace or AC change-out costs in city fees, with $0 only where the page exempts that equipment; New York exempts packaged units only and is counted at its filing fee for a central or split system. The fee-basis column sorts a flat line first, then a valuation table, then itemized equipment fees, then hourly. The who-pulls-it column sorts an owner first, then limited or conditional, then licensed contractor only. A flag marks a row where the city's own documents disagree or the page calls a figure an estimate or says to confirm it. Download the table as CSV.
What the comparison shows
The city's own example for a new or full system is under $150 in 14 cities and $500 or more in 6
Under $150: Wichita $50, Fort Worth $56, New Orleans $73, Washington $79, Austin $95, Kansas City $101, Albuquerque $103, Boston $104, Los Angeles $108, Baltimore $115, Denver $115, Nashville $129, Houston $138 and Corpus Christi $146. $150 to $249: Louisville $155, New York $156, San Antonio $164, St. Paul $170, Jacksonville $174, Stockton $183, Virginia Beach $187, St. Louis $190, Orlando $193, Miami $198, Tulsa $198, El Paso $200, Las Vegas $202, Indianapolis $208, Minneapolis $218, Tucson $219, Colorado Springs $223, Charlotte $224, Riverside $229 and Tampa $248. $250 to $499: Sacramento $254, Raleigh $258, Philadelphia $267, Aurora $300, Chicago $300, San Diego $308, Milwaukee $319, Pittsburgh $333, Honolulu $342, Fresno $377, Seattle $396, Irvine $427 and Dallas $446. $500 or more: Portland $522, Phoenix $534, Long Beach $541, Cincinnati $554, San Francisco $595 and San Jose $840. The median of the 53 is $202. The examples are not the same job. Fort Worth prices a 4-ton AC with an 80,000 BTU furnace, Houston a complete 5-ton system, Kansas City a $12,000 furnace and AC replacement, Albuquerque a full split system with ductwork and a gas outlet, Baltimore a furnace, AC and new duct system, and Jacksonville a 5-ton AC with a gas furnace, new ducts and new gas piping. Phoenix prices a rooftop unit that needs new structural support, Cincinnati a whole new system with ductwork valued at $10,000, Long Beach a system over 33,000 Btu per hour that needs plan review and Portland a furnace, heat pump, AC, gas line, dryer vent and bath fan. San Francisco prices a heat pump converting a furnace with its electrical permit, Pittsburgh a $20,000 heat pump system with a new circuit and San Jose a full system replacement with new wiring. Chicago prices a new central AC with new ducts and a gas line extension Minneapolis a whole new heating and cooling system, Tampa a change-out with the electrical trade permit the city may also require, Nashville two furnaces and two 3-ton condensers, Raleigh an HVAC New Install with mechanical and electrical permits, New Orleans a 4-ton condenser with a 60,000 BTU gas furnace, Denver a $12,000 heat pump or AC system, Austin two systems under its Residential Change-Out Program, Boston a 100,000 BTU gas boiler and Colorado Springs a new system in a house with no air-moving system at a $12,000 job cost. Virginia Beach prices a $12,000 gas furnace and AC replacement with its gas permit, El Paso a furnace plus a 3-ton combination heating-cooling unit, Orlando a $12,000 heat pump system (mechanical permit only), Las Vegas other mechanical equipment such as a new air handler (the page prices no whole new system) and Washington a new 3-ton AC unit plus a gas furnace replacement under the Instant Permits (figures the page gives for scale only). Wichita prices a furnace and AC changeout together, Honolulu a $15,000 multi-zone split system on an instant online permit, Aurora a furnace and air conditioner replaced together on one flat permit, Fresno a $14,000 furnace and AC change-out and Tulsa a full system with new ductwork and a new electrical circuit. Stockton prices its flat HVAC line for a new or replaced system, Riverside a 4-ton unit with a furnace and duct alterations, St. Paul a $6,000 central air installation, Corpus Christi a mechanical permit at the residential floor for a home of up to about 1,952 sq ft and Irvine an AC system and a furnace replaced together. The six at $500 or more each price a larger job than a swap: Portland's bundles an electrical permit, Phoenix's adds 100% plan review, Long Beach's adds plan check and an energy review, Cincinnati's is priced on the system's value, and San Francisco's and San Jose's add an electrical permit.
A like-for-like swap is $0 in 4 cities and $30 to $315 in the other 49
Four cities exempt some equipment from a permit: Chicago for an in-kind furnace, boiler, ductwork or AC at homes up to 4 stories, Dallas for electric AC, heat pump or air handler swaps with no change in rough-in, Phoenix for an outdoor unit of 5 tons or less in the same spot at the same or lower weight, and Virginia Beach for an electric AC or heat pump swap on the same refrigerant in the same place. Dallas's gas furnace replacement is $321, Phoenix's indoor furnace or air handler is $243 and Virginia Beach's gas or oil furnace is about $187 with its gas permit on a $12,000 job. In the other 49 the city's own figure for a single-unit change-out runs $30 in Colorado Springs to $315 in San Jose, and the median is $125. 22 are under $100, 22 are $100 to $199 and 5 are $200 or more (Aurora $201, Sacramento $214, Long Beach $215, San Francisco $290 and San Jose $315). Cities that price each piece of equipment charge different amounts for an AC and a furnace: Minneapolis $85.20 for an AC or heat pump against $133.40 for a furnace, San Diego $131.52 for a condensing unit against $176.57 for a furnace, and Albuquerque $83 for a condenser with a coil or air handler against $61 for a furnace. New York also exempts packaged units (up to 5 tons in a 1-2 family home, up to 3 tons in any existing building) but files a central or split system, so it is counted at its $130 filing fee. The rules for when a swap needs a permit are on the replacement rules page.
18 cities charge a flat line, 23 itemize the equipment, 11 use the job's value and San Jose bills hours
A flat per-unit, per-system or per-level line sets the fee in Chicago, Seattle, Dallas, Philadelphia, Indianapolis, San Francisco, Minneapolis, Sacramento, Louisville, Tucson, St. Louis, Tampa, Raleigh, Austin, Colorado Springs, Las Vegas, Aurora and Stockton: Stockton's $183 line, Las Vegas's $102 plan check plus $100 permit for other mechanical equipment, Aurora's $201 to replace a furnace or air conditioner on its own and $300 for both, Austin's $74.05 per system plus $20.69 for each additional one, Colorado Springs's $30 to $75 per replacement with new systems priced on Table C by job cost, Tampa's $124.00 (a $120 change-out line plus the 2.5% surcharge), Raleigh's $124 minimum per trade, Sacramento's $175, Indianapolis's $153 for heating or cooling and $185 for both, Louisville's $105 plus $50 for a second system, Minneapolis's three levels at $84.20, $132.40 and $216.60, San Francisco's $290 Category 1M, Seattle's $60.35 per unit, Tucson's $150 first item, Philadelphia's $69 per appliance, St. Louis's $25 plus $40 per unit, Dallas's $181 plus $125 per trade and Chicago's $75 and $150 lines. A valuation table sets it in New York, Phoenix, Miami, Charlotte, Kansas City, Pittsburgh, Cincinnati, Denver, Virginia Beach, Orlando and Honolulu: Honolulu $12 plus $2.20 per $100 up to $20,000, Denver $35 for the first $2,000 plus $8 per additional $1,000, New York $130 for the first $5,000 plus $2.60 per $1,000, Phoenix $195 for the first $1,000 plus $12 per $1,000, Pittsburgh $6.00 per $1,000 with a $130 minimum, Kansas City $58 plus $4.33 per $1,000, Charlotte $59.70 plus $12.19 per $1,000 over $3,000, Miami 0.50 of cost with a $110 minimum, Virginia Beach $50 plus $5 per $1,000, Orlando $66.24 for the first $1,000 plus $11.03 per additional $1,000 and Cincinnati for a new system (its replacements are a flat $118). Itemized equipment fees set it in Los Angeles, Houston, Portland, San Antonio, San Diego, Jacksonville, Baltimore, Fort Worth, Milwaukee, Albuquerque, Long Beach, Nashville, New Orleans, Boston, El Paso, Washington, Wichita, Fresno, Tulsa, Riverside, St. Paul, Corpus Christi and Irvine: Riverside's $49 and $78 AC lines plus $49 per furnace, St. Paul's $85 minimum per trade permit, Corpus Christi's $0.075 per sq ft with a $146.41 minimum, Irvine's $239.83 AC system and $119.77 furnace, Wichita's $14 furnace, $11 air conditioner and $25 issuance fee, Fresno's $111.50 simple and $177.89 complex items plus a $27.08 issuance fee, Tulsa's $35 per heating appliance and $47 for refrigeration, El Paso's $110 base plus $24 to $47 per unit, Washington's $50.60 mechanical and $28.60 gas Instant Permits, Boston's gas permit at $20 plus $50 each plus $0.09 per 1,000 BTU, Nashville $11 per appliance beyond the first plus $32 per 100,000 Btuh with a $75 minimum, New Orleans a $30 application fee plus $15 per A/C unit and $20 to $35 per furnace, Los Angeles $24 per item, Houston $11.41 per ton plus $47, Jacksonville $11 per ton and $22 per furnace, Albuquerque a $47 charge plus $14 and $22 items, Fort Worth a $33.08 application fee plus item fees, San Antonio $57.50 plus $7.19 per unit, San Diego per-item lines, Baltimore $30 per unit, Milwaukee $55 per heating unit and $60 per AC, Portland per item with a $167 minimum and Long Beach per fixture with a $100 minimum. San Jose charges San Jose: $315.00 per hour of required inspection time. A valuation formula can move a job fast: a $5,000 job pays $70.99 in Kansas City and $249 in Cincinnati's new-system column, while a flat line stays the same at any price.
14 examples include the electrical permit and 19 leave it out
The example includes the electrical permit for a new circuit in Seattle, Portland, Philadelphia, San Jose, Charlotte, San Francisco, Milwaukee, Tucson, St. Louis, Pittsburgh, Raleigh, Tampa (Tampa's only if the city requires an electrical trade permit for the job), Tulsa and St. Paul. Another nineteen say a new circuit is a separate electrical permit that the example does not include: Los Angeles, Chicago, Houston, Miami, San Antonio, Baltimore, Fort Worth, Louisville, Kansas City, Cincinnati, Albuquerque, Long Beach, Nashville, New Orleans, El Paso, Orlando, Riverside, Corpus Christi and Washington (whose $150.70 with the AC circuit is for scale only). Indianapolis says a circuit of up to 60 A is covered by the heating and cooling permit. Nine examples also add a gas charge: Chicago, Seattle, Portland, Dallas, Jacksonville, Albuquerque, Boston, Virginia Beach and Washington. In Seattle that gas piping permit is Public Health Seattle and King County's, not SDCI's, at $137 plus $27 per outlet. So the totals are not the same bundle: San Jose's $840 and San Francisco's $595 include a second permit, while Cincinnati's $554 does not and Houston's $138, Los Angeles's $108 and Fort Worth's $56 do not either. An electrical permit when included is priced at $63 minimum in Philadelphia, $141.50 in Pittsburgh, $194.88 in Portland, $85 in St. Louis, $124 in Tampa, $129 in Raleigh, $81 in Tulsa, $85 in St. Paul and $315 in San Jose.
Surcharges, plan review and test fees move the total
Surcharges and fixed charges sit on top of the base fee in many cities: Portland's 12% Oregon surcharge, Seattle's 5% technology fee, San Antonio's two 4% surcharges, Cincinnati's five surcharges of about $11 per $100, Milwaukee's 1.6% surcharge and $25 processing fee, Philadelphia's $3 city and $4.50 state surcharges, Baltimore's $25 application fee and 5% Building Code Permit Tax, Miami's $40 application fee, Fort Worth's $33.08 application fee and $16.87 technology fee, Sacramento's 10% technology surcharge, General Plan fee and business operations tax, Tampa's 2.5% Florida surcharge, Raleigh's 4% technology fee, Long Beach's $115 processing fee, San Jose's $211 processing line, a 2% levy plus a $10 technology fee on each Virginia Beach permit, Orlando's 3% technology surcharge, Las Vegas's $2 technology fee, Washington's 10% technology fee, Wichita's $25 issuance fee, Fresno's General Plan and $23.79 technology surcharges, Tulsa's $5 system surcharge, Riverside's $41 issuance fee and 14% surcharge, Irvine's $31.88 issuance fee and 10% automation fee and Corpus Christi's 4.5% surcharge on starred fees (El Paso adds a technology fee whose amount Schedule C does not state). Plan review is a separate charge where plans are reviewed: Long Beach's $216 minimum plan check and $110 energy plan check are most of its $541, Phoenix adds a 100% residential plan review above $5,000 and Albuquerque adds 25% of the permit fee only when plans are required. Energy-code testing is its own cost: San Diego, Long Beach, Sacramento, Stockton and Riverside require HERS verification or registered energy compliance forms, Dallas and Minneapolis a duct blaster test, and Philadelphia, Jacksonville, Chicago and St. Paul a Manual J or heat loss calculation. Starting without a permit costs more: Baltimore adds the greater of $1,000 or 50% of the permit fee, San Antonio doubles the permit fee, Phoenix charges at least $250 plus a doubled fee, San Jose two times the plan review and inspection cost, Denver double fees with a $100 minimum, Stockton a double permit fee, and Long Beach, Albuquerque and Cincinnati an investigation fee equal to the permit fee.
Who may pull it: an owner in 25 cities, conditions in 16, a licensed contractor only in 12
Twenty-five pages say an owner may pull the permit, usually with a condition: Los Angeles, Seattle, Miami, Portland, Dallas, San Diego, San Jose, Jacksonville, Charlotte, Sacramento, Fort Worth, Milwaukee, Tucson, Kansas City, Long Beach, Tampa, Raleigh, Colorado Springs, Virginia Beach, Orlando, Las Vegas, Aurora, Fresno, Stockton and Corpus Christi. The conditions include 12 months of residence in Los Angeles, San Jose, Sacramento and Fresno, Aurora's signed Statement of Understanding, a homestead in Dallas and Fort Worth, a deed and homestead proof in Jacksonville, a recorded owner who is not an LLC in Portland, an owner who lives in the home in Kansas City (single-family only), Tucson, Charlotte, Milwaukee, Colorado Springs (doing the work themselves) and Miami, an owner affidavit or verification form in Tucson, Kansas City and San Diego, the Owner-Builder rule of Florida Statutes 489.103(7) in Tampa, and Raleigh's notarized Owner Exemption Affidavit, which commits the owner to occupy the home for twelve months, Orlando's Owner/Builder Declaration signed in person under the same statute, Las Vegas's approved Contractors Board affidavit under NRS 624.031(5), in Virginia Beach the owner's name, address and approximate cost of materials, Stockton's Owner/Builder form and, in Corpus Christi, a homestead with a notarized Homeowner's Work Affidavit. Sixteen are limited or unclear: Chicago, Houston, Phoenix, Indianapolis, San Francisco, Minneapolis, Louisville, St. Louis, Pittsburgh, Cincinnati, Nashville, Denver, Wichita, Riverside, St. Paul and Irvine. They include Denver's free homeowner mechanical or HVAC exam (one-family houses only), Wichita's open-book exam and installation plan for an owner-occupant who buys the materials and does the labor, Nashville's unanswered question whether a homeowner gas/mechanical permit is available, Indianapolis's written board approval and homeowner exam, St. Louis's knowledge check and EPA certification for refrigerant, Minneapolis's bar on gas-fired equipment, San Francisco's stand-alone single-family house, Chicago's once-a-year owner-as-contractor rule and Phoenix's gas carve-out, Riverside's owner-builder answer that depends on the permit type, St. Paul's homestead-only affidavit and Irvine's very limited owner-builder exception, while Houston, Louisville, Pittsburgh and Cincinnati leave the owner route open. Twelve pages say only a licensed contractor may: New York, San Antonio, Philadelphia, Baltimore, Albuquerque, Austin, Boston, El Paso, Washington, Honolulu, Tulsa and New Orleans (a Class A City of New Orleans Mechanical A/C license, even for the owner's own house). Seattle's page does not restrict who applies for the mechanical permit.
Where the city's documents disagree or the page calls the figure an estimate
New York: 1 RCNY 101-14 exempts packaged units up to 5 tons in a 1-2 family home, while the page says NYC311 requires a permit above 3 tons. Houston: The page prices a complete system per ton and an alteration at 2% of cost (about $201 on $6,000) without saying which line a like-for-like replacement uses, and the homeowner route is only 'in some instances'. Miami: The City Code prints 0.50 without a percent sign and the page reads it as one-half of one percent; the county code-compliance surcharge rate is not stated, so every total is an about figure. San Jose: The page calls $840 a rough total, adds the $211 processing line only for counter-filed permits and says the online checkout shows the exact amount. Charlotte: The page says a change-out bought outside TIP is charged double and also 2 times the maximum permit fee, and gives the electrical sub-permit and the total as about and roughly figures. Baltimore: Section 109 has no separate heat-pump line, so the page reads a heat pump or mini-split under the air-conditioning rate and says DHCD sets the final classification. Fort Worth: The page says the $16.87 technology fee is listed for all applications and permits, but its worked examples show the job with and without it (about $56 or about $73). Milwaukee: MCO 200-24-1.5-f-4 and the DNS homeowner page exempt non-gas appliance replacements including air conditioners, while the DNS checklist lists Air conditioner: Yes. Louisville: The page could not confirm whether Construction Review issues an HVAC permit to an owner or whether the HVAC permit covers a new circuit, and tells the reader to ask. St. Louis: The page says to ask which line the Mechanical Section applies ($65 as a combination or $105 as separate items), puts the circuit total at about $150 to $190, and notes an older 1992 chapter that still mentions a $25,000 minor-repair threshold. Pittsburgh: PLI's permitting page puts attached single- and two-family dwellings in the commercial category with a $605 minimum base fee, and its licensing rules conflict with its EZ page on whether a homeowner may do the work. Cincinnati: The HVAC handout does not say whether the department issues a mechanical permit to an owner, so the page tells the reader to ask the Permit Center. Tampa: an electrical trade permit may also be needed when the job changes wiring, breakers or the disconnect, so $248.00 holds only if the city requires it. Nashville: the examples count a 3-ton unit as 36,000 Btuh while the schedule says Btuh input. Raleigh: the guide lists stand-alone HVAC fees only for commercial work, so $129 and $258 are the page's reading of its $124 minimum. New Orleans: the page says to confirm whether the repair/alteration line also applies to a replacement, so its $45 and $73 examples may be low. Virginia Beach: the printed mechanical fee table lists $160 for jobs up to $24,000 while its formula of $50 plus $5 per $1,000 gives $170, though the $8,000 and $12,000 examples are not affected. Las Vegas: the Administrative Code exempts replacing a fixed approved appliance of the same type and rating in the same location while the homeowner guide and the department's online HVAC exact change-out permit say to permit any change, and the page follows the department. El Paso: the page says to confirm how the department bills a split-system condenser, and the technology fee is not stated. Washington: the $79.20 and $150.70 are figures the page gives for scale only. Riverside: the schedule marks only some lines with a caret for the 14% surcharge while the city's fee sheet applies it to all plan check and permit fees. St. Paul: DSI's refrigeration fee page shows a $70 minimum while Legislative Code Section 33.04 says $85, and the page budgets the $85. Corpus Christi: the $146.41 is the page's reading of a minimum line as the residential floor, and the schedule does not say which floor area a change-out uses. Irvine: the schedule does not state how a combined AC and furnace change-out is priced. Stockton: the schedule does not say whether its percentage fees are added to the flat HVAC line. Long Beach: These are the fees before 2026-10-01; the Council approved a new schedule on 2026-09-08, effective 2026-10-01, not yet posted. The table flags these rows rather than resolving them.
Method
The 53 cities are the ones whose BuildPermitGuide pages have been rewritten from primary sources as of October 2026: the city's adopted code and exemption list, its permit page or bulletin, its current fee schedule or ordinance and its contractor and owner-builder rules, each fetched and quoted on the city's HVAC permit page. The status in the table is the band of the city page's own worked example for a new central system or a full replacement, using the total the page states and every city fee the example bundles; the job differs by city and the cell says what it is. Where a page also gives a figure for a smaller or different job, the cell notes it and the status does not use it. The swap column is what the page says a like-for-like furnace or AC change-out costs in city fees, with $0 meaning the page exempts that equipment. The pricing and owner columns are the page's fee section and scenario table, and the owner counts come from its licensing paragraph. Contractors' own prices, engineers' and architects' drawing fees, HERS raters and utility charges are never included. Nothing in this table is taken from a model code or another city's schedule; where a city's documents disagree or a page calls a figure an estimate, the row carries a flag instead of a resolution. Each city page carries the date its sources were last verified, and the change log records when a cited document changes.
BuildPermitGuide, “How Much Does an HVAC Permit Cost? 53 Cities Compared” (2026), https://buildpermitguide.com/research/hvac-permit-fees/Questions, corrections or a city you want added: contact us.
Frequently asked questions
The city pages behind this table
Each page quotes the code section, exempt-work list and fee schedule it relies on and records the date they were last verified.
- Albuquerque, NM
- Aurora, CO
- Austin, TX
- Baltimore, MD
- Boston, MA
- Charlotte, NC
- Chicago, IL
- Cincinnati, OH
- Colorado Springs, CO
- Corpus Christi, TX
- Dallas, TX
- Denver, CO
- El Paso, TX
- Fort Worth, TX
- Fresno, CA
- Honolulu, HI
- Houston, TX
- Indianapolis, IN
- Irvine, CA
- Jacksonville, FL
- Kansas City, MO
- Las Vegas, NV
- Long Beach, CA
- Los Angeles, CA
- Louisville, KY
- Miami, FL
- Milwaukee, WI
- Minneapolis, MN
- Nashville, TN
- New Orleans, LA
- New York, NY
- Orlando, FL
- Philadelphia, PA
- Phoenix, AZ
- Pittsburgh, PA
- Portland, OR
- Raleigh, NC
- Riverside, CA
- Sacramento, CA
- San Antonio, TX
- San Diego, CA
- San Francisco, CA
- San Jose, CA
- Seattle, WA
- St. Louis, MO
- St. Paul, MN
- Stockton, CA
- Tampa, FL
- Tucson, AZ
- Tulsa, OK
- Virginia Beach, VA
- Washington, DC
- Wichita, KS
Related: Permit fee calculator: 43 cities · Do you need a permit to replace a furnace or AC · HVAC Permit Guide · How much does a building permit cost · Electrical panel permit fees compared · HVAC permits in all 50 cities · Which cities changed their permit fees in 2026 · Permit fee change log · Open data exports