What's Required in Corpus Christi
- Installing a new A/C unit, furnace or duct system needs a mechanical permit.
- Portable units and minor part replacements need no permit.
- Work must be done by a TDLR-licensed contractor registered with the city, or by the owner on a homestead.
- Homeowner permits require a notarized Homeowner's Work Affidavit.
- Gas service work must be done by a state-licensed plumber.
- Outdoor units must be at least 3 feet from street, side and rear yard lines.
- HVAC work is inspected at rough-in and final.
Do you need a permit to replace an HVAC system in Corpus Christi?
Yes. The Development Services Department's Homeowner's Guide to Permitting lists an HVAC change out among residential permits, and says a mechanical permit is needed for installing a new A/C unit, a new heat furnace, or duct outlets or a duct system. You do not need one for a portable HVAC appliance or for replacing minor parts, as long as the equipment does not become unsafe. The city adopted the 2021 International Mechanical Code with local amendments effective August 1, 2023, and its energy code is the 2015 International Energy Conservation Code. HVAC work is inspected at rough-in and final.
How much does an HVAC permit cost in Corpus Christi?
The FY 2026 Development Fee Schedule, effective October 1, 2025 to September 30, 2026, prices residential mechanical permits at $0.075 per square foot. The schedule prints a $146.41 Minimum Permit Fee line under each trade permit, below the commercial row; we read it as the residential floor too, so confirm with Development Services before budgeting. Texas Local Government Code 214.907 (H.B. 852) bars cities from basing residential fees on the value or cost of the work, so the price of the equipment does not matter. The schedule does not say which floor area it applies to a stand-alone change out; at $0.075 the $146.41 minimum covers any area up to about 1,952 sq ft, and if the city counts a 2,500 sq ft house the fee would be $187.50. The residential rate is starred, so the schedule's 4.5% surcharge applies, about $7 on $146.41 (whether it reaches the unstarred minimum line is not stated), and a re-inspection after the second inspection is $117.13. The schedule's period has ended and it is still the newest posted, so confirm.
| What you are doing | City filing | Rule |
|---|---|---|
| Replacing the A/C condenser and coil | Mechanical permit | $0.075 per sq ft; $146.41 floor as we read it |
| Installing a new furnace | Mechanical permit | Gas piping work by a licensed plumber |
| Adding or replacing ductwork or outlets | Mechanical permit | Rough-in and final inspections |
| Portable HVAC appliance | No permit | Guide exemption; ask about a window unit |
| Replacing a capacitor, motor or other minor part | No permit | As long as the equipment stays safe |
| Moving the outdoor unit | Ask Development Services | Keep 3 ft from street, side and rear yard lines |
| New circuit or disconnect for the unit | Electrical permit too | $0.075 per sq ft, $146.41 minimum |
Who can pull an HVAC permit in Corpus Christi?
A state-licensed air conditioning and refrigeration contractor or, on your own home, you. Texas licenses air conditioning and refrigeration contractors through the Texas Department of Licensing and Regulation, and the city registers mechanical contractors with a copy of their state master license, a certificate of liability and a $135.00 annual registration fee. State law exempts a person doing air conditioning work in a building owned solely by that person as a home, but exempt work is still subject to any municipal permit and inspection. The city's route for that is the homeowner trade permit for a homestead, signed with a notarized Homeowner's Work Affidavit that lets only the resident owner do the work. A new gas furnace connection is the limit: work on natural gas service systems must be permitted and installed by a state-licensed plumber.
Where can the outdoor unit go?
The Unified Development Code allows air conditioning units in required yards but requires them to be set back at least 3 feet from a street, side or rear yard line. Apply through the Dynamic Portal, the city's online permit portal, with the Trade Permit Application, and add an electrical permit if the unit needs a new circuit.
How to Get a HVAC Permit in Corpus Christi
Choose who does the work
Hire a licensed air conditioning contractor registered with the city, or sign the homeowner affidavit for your homestead.
Plan the equipment location
Keep the outdoor unit at least 3 feet from street, side and rear yard lines and plan any new circuit.
Apply in the Dynamic Portal
Submit the Trade Permit Application marked Mechanical with the scope of work, plus an electrical permit if needed.
Pay the fee
Pay $0.075 per square foot, with the $146.41 minimum as we read the schedule, plus the surcharge.
Pass rough-in and final
Schedule the inspections in the portal; final inspections are required to close the permit.