Underlayment: What It Means on a Roofing Permit

The hidden layer under your shingles that a roofing inspection may check before it is covered.

Updated November 2026 Glossary Term

Underlayment: A water-resistant sheet, either asphalt-saturated felt or a synthetic fabric, installed over the roof deck beneath the shingles as a secondary barrier against water.

What Underlayment Does

Shingles shed most water, but wind-driven rain and the occasional torn or lifted shingle let some through. Underlayment is the second line of defense: a sheet rolled over the roof deck before the shingles go on. It also protects the deck while the roof is open, and it provides a cleaner surface for the shingles.

On a permit form or roofing contract it may be listed as felt, tar paper, synthetic underlayment or a water barrier, and the city or your insurer can ask for the product's name and rating. It also matters for how long a roof can sit open: a properly installed layer gives temporary protection if rain arrives before the shingles do, though it is not meant to be left exposed for months.

Felt vs. Synthetic

Felt (asphalt-saturated paper) has been used for generations and is sold in different weights. Synthetic underlayment is a woven or coated polymer sheet; it tends to be lighter, stronger, less prone to wrinkling and safer to walk on when wet. Both can meet the model residential code (IRC) if the product is listed and installed per the manufacturer's directions and the shingle maker's requirements.

Self-adhered membranes serve a different role in cold or storm-prone areas; see ice barrier. High-wind regions, such as HVHZ in Florida, can require a sealed secondary water barrier. The shingle manufacturer's installation instructions usually name the underlayment they accept, and following them keeps the warranty intact, so it is worth reading the contract line that names the product.

Why It Matters to the Permit

Underlayment is the layer inspectors most often want to see before it disappears. In cities that inspect reroofs, the typical check is of the nailing, the underlayment laps and the flashing, done while the deck is covered but the shingles are not. Once the shingles are down, the inspector cannot confirm the layer exists.

Some cities rely on the roofer's declaration or photos instead of a site visit, and others inspect only at final. Ask your roofer which route your permit uses, and take your own photos before the shingles go on.

Where Underlayment Comes Up on This Site

Underlayment is part of what a roofing permit reviews, covered in the roof replacement permit guide. Our research on replacing a roof found that 16 of 30 large cities exempt a like-for-like reroof and 14 require a permit for every one, so whether anyone checks the underlayment depends on where you live. In 10 cities, replacing any decking brings a permit in. The fee comparison shows what each city charges.

Frequently Asked Questions

Yes. Model codes and shingle manufacturers expect new underlayment on a reroof, and a tear-off exposes the old layer, which is normally replaced. Reusing aged felt can void a warranty. Your contractor's scope should list the product.
Synthetic is lighter, tears less and holds up under sun exposure longer, so many roofers prefer it. Felt costs less and meets the code in many applications. Neither is better in every case; the correct choice depends on roof pitch, climate, shingle manufacturer and local code.
Only if the city inspects before the shingles go on. Some cities inspect the deck and underlayment; others inspect only at final or rely on photos. Ask your roofer which inspections your permit lists and when they are scheduled.
Stay up to date
Get notified when we add new cities or update permit fees.