Electrical Service: What It Means on a Permit

The connection that brings utility power into your home, from the wires at the street to the main panel.

Updated November 2026 Glossary Term

Electrical Service: The equipment that delivers power from the utility to a building: the overhead or underground wires, the meter, the service conductors and the main panel with its disconnect.

What the Service Includes

Your electrical service starts where the utility's wires meet your property and ends at the main panel. In between sit the service drop or lateral (overhead wires or buried cable), the meter base, the service conductors, a grounding connection and the main disconnect. The utility owns the wires up to the meter in most places and the homeowner owns everything after it, which is why a service upgrade needs both the utility and the city.

The service is rated in amps, and that rating is what permit offices, insurers and electricians mean when they talk about a house having 100 or 200 amp service. Everything downstream, from the panel to each circuit, depends on it. A larger service does not make appliances use more power, but it leaves room to add them.

What a Service Upgrade Is

A service upgrade replaces the capacity of that connection, most often from an older 60- or 100-amp service to 200 amps, as described in the amperage entry. The usual triggers are an added EV charger, heat pump or electric range, a room addition, or an old panel that an insurer or inspector will not accept. The work typically means a new panel, a new meter base and mast or underground conductor, new grounding and sometimes a new utility connection.

Permits, Inspections and the Utility

A service upgrade is an electrical permit job almost everywhere. The city inspects the work, and then the utility connects or reconnects power, often after receiving a release from the inspector (see utility release). Plan to be without power during the cutover. Overhead service work may also need the utility to disconnect first, and utility schedules are separate from city schedules, so book both early. An inspector will typically look at the grounding electrode connection, the panel clearances, the labeling of each breaker and whether the new equipment matches the permit. A failed inspection holds up the utility reconnection, so fix the correction notice first and then request a reinspection. It is also worth asking the utility whether it offers a temporary connection while you wait.

What It Costs in City Fees

In this site's comparison of 30 cities, the city fee for a 100 to 200 amp service upgrade runs from $57 in Baltimore to $450 in San Francisco, with a median of $108. Nine cities price it by amperage and eleven charge one flat fee. That covers the city's permit only; the electrician's work and any utility charges are separate. The overview is on the electrical panel permit page. Some cities add an application charge or surcharge on top of the base fee, so read the whole fee schedule rather than the headline line.

Frequently Asked Questions

Almost always yes. Changing the panel, meter base or service conductors is regulated work, and the utility will usually not reconnect power without an inspection. Whether a homeowner may pull the permit varies by city; the panel fee research shows 15 of 30 cities allow it and 9 issue it only to a licensed electrician.
No. The service is the whole connection from the utility to your main panel, including the meter and disconnect. The panel, also called the breaker box, is one component of it that distributes power to circuits. Replacing only the panel can still be a service-level permit if the conductors or disconnect change.
It depends on the utility. Many utilities do the meter work or reconnection without a charge when the customer has a passed inspection, while others charge for relocating or upgrading their own equipment. Ask the utility early, since it is a separate process from the city permit and can set the timeline.