After-the-Fact Permit: What It Means on a Permit

A permit you apply for after the work was already done, usually at a higher price.

Updated November 2026 Glossary Term

After-the-Fact Permit: A permit obtained after construction has started or been completed without one. Cities typically charge an added penalty fee and may require opening up finished work so inspectors can see it.

What an After-the-Fact Permit Is

Sometimes work is done without a permit: a previous owner built a deck, a contractor skipped paperwork, or a homeowner did not know a permit was needed. An after-the-fact permit, sometimes called a retroactive or penalty permit, brings that work into the system. You apply as if for a new project, submit plans or drawings of what was built, and the city inspects the result. If it meets code, the permit is closed out like any other. The term is closely related to the stop-work order that often triggers it. Applying yourself, before a neighbor complaint or a sale, tends to be less costly than waiting to be cited.

Extra Fees and Penalties

Most cities add a charge for having started without a permit, commonly doubling or multiplying the normal permit fee, though the exact penalty is set locally and varies by city. It is added on top of the normal permit fee and any plan review fee. Some cities also impose a separate violation fine through code enforcement. The penalty rule appears in the fee schedule, usually under investigation fees or work without permit. A city may also decline to issue the permit until fines are settled. Whether the penalty is reduced for coming forward on your own varies by city.

What Inspectors Look For

Because work is already built, the inspector cannot see what is behind finished walls or below grade. The city may require you to open walls, expose footings or electrical connections, or provide engineering to show the hidden work meets code. The standard is the code in force now, not the one used when it was built, though some cities allow older work to stand if safe. Work that cannot be shown to comply may have to be corrected or removed. See what happens if you build without a permit. An engineer or the original builder can sometimes supply documents showing how hidden parts were built.

Where It Comes Up on This Site

The fee comparisons on this site assume you apply before building. If work already started, the penalty can change the total considerably, so use the fee calculator as a starting point only. The rules for each city vary by city; the owner pages explain when an owner may apply, covered in the owner-builder research page. Selling a house with unpermitted work can bring the issue up again, so many owners resolve it beforehand.

Frequently Asked Questions

It is a permit you apply for once the work has already been done or started without one. The city treats it like a new application, inspects the result and usually charges an added penalty on top of the normal fees.
Many cities charge a multiple of the normal fee, such as double, but the penalty is set locally and varies by city. Your city's fee schedule lists the rule, often under a heading such as work without permit or investigation fee.
It is possible. If the inspector cannot confirm hidden work meets code, the city can require openings, engineering or correction, and in serious cases removal. Applying voluntarily, before a complaint, usually gives you more choices than waiting for a notice.