Plan Review Fee: What It Means on a Permit

The charge for having city staff read your plans before they approve a permit.

Updated November 2026 Glossary Term

Plan Review Fee: A fee a building department charges for examining your submitted plans for code compliance. It is billed separately from the permit fee, often as a percentage of it, and is usually due when you apply.

What the Plan Review Fee Pays For

When you submit drawings, a plan reviewer checks them against the adopted building code and the city's own rules: structure, setbacks, egress, energy and fire safety. The plan review fee covers that staff time. It is a separate line from the permit fee, which covers the permit itself and the inspections that follow. The fee is the cost of the review whether or not the plans are approved. A revised submittal after a correction notice may be reviewed at no charge or may carry a recheck fee, depending on the city. The process itself is described under plan check. If a reviewer finds problems, the plans come back with a list of corrections, and you resubmit. The fee does not change just because plans are corrected, but the extra rounds add time.

How Cities Charge It

Cities handle the charge in a few ways. Many set it as a percentage of the building permit fee, with the share set locally. Others publish a flat amount per project type, or a table tied to valuation. Some charge by the hour of review time. Small jobs that need no drawings, like a like-for-like fixture swap, often have no plan review fee at all. Your city's fee schedule will say which method applies and whether a minimum charge sets a floor. If the percentage is what you see, remember that it applies to the permit fee, not to your project cost, so a larger permit fee means a larger review charge.

When It Is Due and Whether It Is Refundable

Most cities collect the plan review fee at submittal, before anyone starts reading your plans, and some cities will not accept an application until it is paid. The permit fee itself is often collected later, when the permit is issued. Because the review work begins right away, the plan review fee is commonly non-refundable even if you withdraw the application, though a few cities return part of it if no review has started. Ask the counter or read the fee schedule before paying if you are unsure whether the project will go ahead. If a fee schedule lists a deposit instead, that is a separate idea, covered under plan check deposit.

Where It Comes Up on This Site

Plan review appears as its own line on the larger project pages, such as ADU, pool and deck permits, and it is folded into the totals on the fee calculator for the cities that charge it. Which cities charge it, and how much, varies by city; the 2026 fee changes research page tracks recent schedule updates. Where a project does not need drawings, such as a small shed or like-for-like swap, the line often drops off the invoice. The how-to-apply guide explains what to submit.

Frequently Asked Questions

Not usually. Most fee schedules list it as its own line next to the permit fee, even when it is calculated as a percentage of that fee. On your invoice you will often see both, plus any surcharges. Some small cities roll the review into one combined fee, so read the itemized lines on your own city's schedule.
Often not. Simple jobs reviewed at the counter, or work that is exempt from plan review, commonly skip the fee. Whether your project qualifies depends on the city and the project type. Look at the permit page for your project, or ask the permit office whether a plan review fee applies before you apply.
Generally no. The fee pays for the review itself, not for approval, so a correction notice does not trigger a refund. Resubmitting corrected plans is often covered by the original fee for a set number of rounds, after which a recheck charge may apply. Your city's fee schedule states the exact terms.