Retroactive Permit: A permit applied for after construction is complete or underway, to legalize work done without a permit. The city reviews it against the code in force and may require inspections, corrections or engineering.
What It Is
A retroactive permit, sometimes called a legalization or after-the-fact permit, lets an owner ask the city to approve work that was built without one. Instead of review before construction, the department reviews the finished result, then inspects it. If it passes, the work is added to the record and the permit is closed out like any other.
The name varies, and the process, fees and the likelihood of approval vary with it.
Approval is not automatic. The reviewer applies the code and zoning rules that are in force now, which may be stricter than when the work was built.
What the City Typically Asks For
Expect more documentation than a normal permit. Cities often ask for as-built drawings of what exists, photos or a description of work behind walls, engineering where structure is involved, and a site plan. Inspectors may require openings in drywall or flooring to see framing, wiring and plumbing that are now covered.
Fees can be higher than for a normal permit, and some cities charge a multiple of the standard fee or an added penalty.
Contact the city before you submit. Some departments ask you to schedule a meeting or an initial inspection, and others have a form for permits after the fact with its own fee table.
What It Changes for You
A closed retroactive permit clears the open violation and gives you a clean record for a sale, an insurer or a lender. The cost is time, money and sometimes alterations: if the work cannot meet current code, the city may require changes or removal. A stop-work order or notice of violation may have to be resolved first.
Talk to the building department before you start. Departments often have a standard process and can tell you what they will want to see.
A good package includes photos from before the walls were closed, a clear scope of what was built, receipts for materials and, where structure is involved, a letter from an engineer.
Where It Comes Up on This Site
See the guide on building without a permit for the broader picture, and the 2026 fee changes comparison for how each city's fees are structured. For when a permit is needed in the first place, see the deck thresholds and shed size exemptions pages.
Closing the permit is the last step. Once the final inspection passes, ask for the record to be closed, because an unfinished permit leaves the problem on the file for the next buyer.