What Is a HERS Rating or Duct Test on a Permit?

A third-party test of how tight and efficient a home or its ducts are, sometimes required before final approval.

Updated November 2026 Glossary Term

HERS Rating and Testing: A third-party energy test or rating, such as a duct leakage test, blower door test or Home Energy Rating System score, done by a certified rater to show a home or its systems meet an energy requirement.

What a HERS Rater Does

The Home Energy Rating System is a scoring approach run by RESNET, and the raters who use it are certified professionals independent of the builder and the city. A rater can model a home's energy use, test the whole house for air leakage with a blower door and test duct leakage with a pressurized fan. The results are reported as numbers or a pass or fail.

The score itself is not always what a permit needs. Often the city only wants the test report.

A HERS score of zero would mean a home that makes as much energy as it uses; most homes are higher, and a lower score means a more efficient home. A permit rarely asks for a score target on an existing house.

When a Permit Asks for Testing

Testing requirements come from the adopted energy code, not from HERS itself. New construction, additions and some HVAC replacements can require duct leakage tests, and many places require air leakage testing on new homes. Some cities accept a rater's report; others accept a licensed contractor's own test.

What your permit needs is listed on the application or plan review comments.

If a rater is required, their name and certification usually have to appear on the test report that you hand to the city.

Tests are not performed by city staff, so the cost and scheduling are separate from the permit fee.

Timing and Documents

Tests are usually done when the system is finished and before the final inspection. For ducts that means after the duct work is in and sealed; for whole-house air leakage it means after insulation and drywall. The rater issues a report that the contractor or owner submits to the city, which the inspector or reviewer checks.

Failing a test means sealing leaks and retesting, so scheduling matters if you are close to a deadline.

Keep the report with your closeout documents; it can be useful later for resale or incentives.

A retest is usually done by the same rater, and the permit stays open until a passing report is on file with the city.

Where It Comes Up on This Site

HVAC and addition projects are where homeowners most often meet duct tests. See our HVAC replacement rules research and HVAC permit guide for how cities treat a system swap, and IECC for the model rules behind testing.

Whether a test is required is a local decision, so use the city's own page.

A Manual J load calculation is a different document: it sizes equipment, while a duct or blower door test checks how well the finished system performs.

Frequently Asked Questions

Usually not on its own. What the permit requires is compliance with your adopted energy code, and that may include a test such as duct leakage or blower door. Some programs and incentives also use HERS scores. Your permit office states which reports it needs.
Cities usually accept certified raters or testers listed by their program, and some accept licensed HVAC contractors. Rules differ. Ask the permit office whether the test must be done by an independent third party and what form the report should take.
You seal the leaks, such as duct joints or air gaps, and retest. The permit usually cannot be finalized until a passing report is on file. The rater often tells you where the leaks are, which makes the second test quicker.