Re-inspection Fee: A charge a building department adds when an inspector has to come back to the same job a second time, usually because the work failed inspection, was not ready or the permit holder was not available.
What Triggers a Re-inspection Fee
Most permit fees include a set number of inspections, often one visit per stage. When an inspector returns to look at the same stage again, the city may bill a re-inspection fee. Common triggers are a failed inspection that needs a second look after corrections, work that was not ready when the inspector arrived, no access to the site or no adult present, and missing items such as the permit card. Cities differ on how many failures they allow before charging, so read your fee schedule. The charge protects inspectors' time, since each trip to a site is a scheduled slot another job could have used.
How It Is Billed
The charge is a flat amount per extra visit or an hourly rate, as listed in the fee schedule. It is added to the permit account and is often due before the next inspection can be scheduled, so an unpaid charge can stall the job. Some cities waive the first re-inspection or bill only after the second failed attempt; others charge every time. It varies by city, and the schedule is the place to see the rule that applies to you. Ask when the charge must be paid, since some cities hold the next inspection until it is.
How to Avoid It
The best way to avoid a re-inspection charge is to request the inspection only when the work is truly ready and visible. Check the permit card for what the inspector will look at, keep the work uncovered, and make sure the permit card is posted and access is clear. After a failure, correct every item on the correction list before you reschedule, since a second failure for the same item is the usual way a charge repeats. See the guide to passing an inspection. Taking photographs of the finished stage before scheduling can also help you spot issues the inspector will see.
Where It Comes Up on This Site
Inspection stages are explained in terms like rough-in inspection and final inspection. The fee calculator does not assume failed inspections, so budget for it separately if you expect risk. The amount and rules vary by city. Check the fee schedule for the figure; this page does not state one because it varies by city. The application guide covers how inspections are scheduled after the permit issues, and each city's page lists its own inspection stages.