Permit Required?
Required
Typical Fee Range
$156–$156
$150 flat fee plus $6 technology surcharge.
Fee Method
Flat fee
Apply Online
Apply at Development Services Department →
What's Required in Fort Worth
- Mechanical permit required for system changes ($150 fee).
- Contractor must be registered with the city.
- Manual J load calculations required for new sizing.
- Electrical permit mandatory for new power connections.
- Exterior units must meet zoning setbacks.
- Venting and drainage must meet current mechanical codes.
How to Get a HVAC Permit in Fort Worth
1
Step 1: Register Contractor
Mechanical contractors must be registered in Fort Worth.
2
Step 2: Apply Online
File for the mechanical permit through the Accela portal.
3
Step 3: Pay Fees
Standard $150 residential fee plus tech surcharge.
4
Step 4: Installation
Replace the unit according to safety and efficiency codes.
5
Step 5: Final Inspection
Schedule a mechanical inspection via the portal.
Frequently Asked Questions
$150 for residential up to 2,500 sq. ft..
Yes, you must schedule inspections through the official portal.
Yes, if the wiring is modified, a separate $150 permit is needed.