Permit Required? Required
Typical Fee Range $250–$1,000 Includes general building review; trade permits are separate but linked.
Fee Method Valuation-based

What's Required in New Orleans

  • Permit required for structural changes or fixture relocation.
  • Detailed floor plan showing the new layout.
  • Electrical permit for GFCI protection and new circuits.
  • Plumbing permit for moving sinks or gas lines.
  • Mechanical permit if installing a new range hood vent.
  • Verification of current smoke and CO detector compliance.

Do You Need a Permit to Remodel a Kitchen in New Orleans?

It depends on what you're changing, not on the word β€œremodel.” New Orleans lists kitchen remodels as permit-required work, and in practice the permit attaches to the plumbing, electrical, and structural scope β€” not to cosmetic swaps. Permit fees typically run $250–$1,000 (valuation-based), issued by the Department of Safety and Permits. A remodel that moves the sink, adds circuits, relocates the range, or opens a wall is firmly in permit territory β€” and often means separate trade permits rather than one ticket.

Kitchen Work That Usually Doesn't Need a Permit

The cosmetic layer is generally yours to change freely: swapping cabinets in the same footprint, new countertops, flooring, backsplash, paint, and replacing appliances that use existing hookups. The moment the project touches what's behind the finishes β€” supply lines, drains, gas, new circuits, walls, or venting β€” it stops being cosmetic in the city's eyes. If your remodel straddles the line, describe the full scope to the Department of Safety and Permits up front; retrofitting a permit onto half-finished work is the expensive path.

How to Get a Kitchen Remodel Permit in New Orleans

1

Step 1: Create Plans

Draft a floor plan of the existing and new kitchen layout.

2

Step 2: Submit Portal

Apply for a 'Residential Alteration' permit online.

3

Step 3: Trade Sub-permits

Contractors must pull individual permits for plumbing and electric.

4

Step 4: Rough Inspections

Verify wiring and piping before installing drywall/cabinets.

5

Step 5: Final Sign-off

Final inspection of all fixtures and safety systems.

Frequently Asked Questions

If no plumbing/electrical is moved, cosmetic cabinet swaps are exempt.
Yes, they must be pulled individually but are linked to the main project.
Expect 15-20 business days for residential kitchen reviews.
Only if the work goes beyond cosmetic scope. Plumbing, electrical, or structural changes require permits in New Orleans; cabinet, countertop, and flooring swaps generally don't. Fees typically run $250–$1,000.